Block 3511, lot 080
1543 Mission St
- City’s use
- Industrial
- Built
- 1927
- Stories
- 3
- Units
- 3
- Rooms
- 5 bathrooms
- Building
- 22,528 sq ft
- Lot
- 5,706 sq ft
- Zoning
- RH3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 1543 Mission St | J & C Safety 1st Fire Protection Inc | ref pa# 201909091010; add 5 fire sprinkler at (e) fire sprinkler systemDetails
ref pa# 201909091010; add 5 fire sprinkler at (e) fire sprinkler system | $2,300 |
| Dec 11, 2019 | Never finaled issued Dec 2019, no final | 1543 Mission St | Capital Electric & Sign Co | fabricate and install one electricalblade sign. (equinox)Details
fabricate and install one electricalblade sign. (equinox) | $9,000 |
| Nov 4, 2019 | Never finaled issued Nov 2019, no final | 1543 Mission St | street spaceDetails
street space | ||
| Sep 9, 2019 | Completed final sign-off Jan 2020 | 1543 Mission St | Jorgensen-Reeve Builders | temporary ti within an existing building to be used as pre-sales showroomDetails
temporary ti within an existing building to be used as pre-sales showroom | $330,000 |
| Jul 9, 2019 | Completed final sign-off Dec 2019 | 1543 Mission St | Aguilera Construction Company | tenant improvement on 1st fl within an existing 3 story over basement low riseDetails
tenant improvement on 1st fl within an existing 3 story over basement low rise | $103,500 |
| Jun 28, 2016 | Completed final sign-off Jul 2016 | 1543 Mission St | Aura Fire Safety Inc | 3rd floor add (7) new sprinkler heads, relocate (1) sprinkler head, replace (4) sprinkler heads. ref pa #201601217627. n/a maher ordinanceDetails
3rd floor add (7) new sprinkler heads, relocate (1) sprinkler head, replace (4) sprinkler heads. ref pa #201601217627. n/a maher ordinance | $5,800 |
| Mar 21, 2016 | Never finaled issued Apr 2016, no final | 1543 Mission St | Nelson Jameson Construction Inc | 3/f: revised reflected ceiling plan and title 24 lighting, revision to previously approved permit 201602089043 maher not reqDetails
3/f: revised reflected ceiling plan and title 24 lighting, revision to previously approved permit 201602089043 maher not req | |
| Mar 10, 2016 | Never finaled issued Mar 2016, no final | 1543 Mission St | street space permit and mta permits (bldg permit ap #201602089043)Details
street space permit and mta permits (bldg permit ap #201602089043) | ||
| Feb 8, 2016 | Completed final sign-off Sep 2016 | 1543 Mission St | Nelson Jameson Construction Inc | interior ti of (e) 3rd floor. scope of work includes (n) accessible restrooms, new partitons. mep deferred under separate permit. maher naDetails
interior ti of (e) 3rd floor. scope of work includes (n) accessible restrooms, new partitons. mep deferred under separate permit. maher na | $132,000 |
| Jan 21, 2016 | Completed final sign-off Jun 2016 | 1543 Mission St | change of use from industrial to instructional service for 1st flDetails
change of use from industrial to instructional service for 1st fl |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Nelson Jameson Construction Inc (2), Aguilera Construction Company, Aura Fire Safety Inc, Capital Electric & Sign Co, J & C Safety 1st Fire Protection Inc, Jorgensen-Reeve Builders
- Architects
- David Montalba, Marc Dimalanta
- Engineers
- Craig Chamberlain, Eric C Taylor, Nicholas Decoster
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.