Block 1428, lot 009
245 05th Ave
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,373 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 245 05th Av | Kyle Wong Construction | #245: in-kind kitchen remodel. new counter cabinet & appliance.Details
#245: in-kind kitchen remodel. new counter cabinet & appliance. | $5,000 |
| Jul 16, 2025 | Completed final sign-off Jan 2026 | 245 05th Av | Kyle Wong Construction | unit #245: reconfigure deck on 3/f per plan.Details
unit #245: reconfigure deck on 3/f per plan. | $25,000 |
| Mar 28, 2025 | Completed final sign-off Sep 2025 | 245 05th Av | Kyle Wong Construction | #245: like for like remodel (e) bathroom. repair the gutter and downspout at rear sunroom. in-kind window replacement for the whole house. no size change & same operation. 19 total windows to be replaced - 11 windows at the front facade to be wood hung or wood aluminum clad.Details
#245: like for like remodel (e) bathroom. repair the gutter and downspout at rear sunroom. in-kind window replacement for the whole house. no size change & same operation. 19 total windows to be replaced - 11 windows at the front facade to be wood hung or wood aluminum clad. | $21,360 |
| Jun 13, 2022 | Never finaled issued Apr 2023, no final | 245 05th Av | rear horizontal addition @ 2nd flr @ grade & new roof dormers @ 3rd flr. interior reconfiguration @ all flrs. exteriors scope includes new finishes, windows, adn doors @ rear. existing windows and doors @ front to be replaced in-kind.Details
rear horizontal addition @ 2nd flr @ grade & new roof dormers @ 3rd flr. interior reconfiguration @ all flrs. exteriors scope includes new finishes, windows, adn doors @ rear. existing windows and doors @ front to be replaced in-kind. | $575,000 | |
| Oct 17, 2019 | Never finaled issued Feb 2020, no final | 245 05th Av | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Kyle Wong Construction (3)
- Architects
- Brian Milford
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.