Kyle Wong Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2019 to Apr 2026
- Last 24 months
- 17 permits filed
46 permits since 2000: 26 completed, 15 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | In progress issued Apr 2026 | 2222 Hyde St | unit #1 remodel existing primary bathroom and dressing area. remodel existing powder bath, fixture locations to remain. modify part of kitchen. no structural work.Details
unit #1 remodel existing primary bathroom and dressing area. remodel existing powder bath, fixture locations to remain. modify part of kitchen. no structural work. | $88,281 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 3503 Cabrillo St | water damage repair at kitchen& 2 bathrooms area. drywall repair. plumbing pip/copper replacement. ~200 sqftDetails
water damage repair at kitchen& 2 bathrooms area. drywall repair. plumbing pip/copper replacement. ~200 sqft | $10,000 |
| Dec 5, 2025 | In progress issued Feb 2026 | 639 Teresita Bl | remove dryrot ground level deck and rebuild rear dekc and stairs in kind.demolish existing rear wood balconies on 1st and 2nd flrs.install new metal balconies on rear elevations legalize exist.first basement as media room w/bathroom fully sprinkler entire bldg.deferred permit:sprinkler entire bldgDetails
remove dryrot ground level deck and rebuild rear dekc and stairs in kind.demolish existing rear wood balconies on 1st and 2nd flrs.install new metal balconies on rear elevations legalize exist.first basement as media room w/bathroom fully sprinkler entire bldg.deferred permit:sprinkler entire bldg | $55,000 |
| Oct 31, 2025 | In progress issued Oct 2025 | 2076 14th Av | recommencement and completion of work approved under pa #202409271850.Details
recommencement and completion of work approved under pa #202409271850. | |
| Oct 31, 2025 | In progress issued Oct 2025 | 2933 19th Av | to obtain final inspection for work approved under pa # 201902132840, 202203180312, 202408239392. all work is complete.Details
to obtain final inspection for work approved under pa # 201902132840, 202203180312, 202408239392. all work is complete. | |
| Sep 26, 2025 | Completed final sign-off Dec 2025 | 245 05th Av | #245: in-kind kitchen remodel. new counter cabinet & appliance.Details
#245: in-kind kitchen remodel. new counter cabinet & appliance. | $5,000 |
| Sep 10, 2025 | In progress issued Nov 2025 | 129 Cabrillo St | add 2 skylights on roof.Details
add 2 skylights on roof. | $1,000 |
| Jul 17, 2025 | Completed final sign-off Oct 2025 | 580 Corbett Av | remodel one kitchen and one full bathroom in kind. add a sub panel. no removal of wallsDetails
remodel one kitchen and one full bathroom in kind. add a sub panel. no removal of walls | $30,000 |
| Jul 17, 2025 | Completed final sign-off Apr 2026 | 760 15th Av | replace 2 windows in kind in garage. not street facing.Details
replace 2 windows in kind in garage. not street facing. | $500 |
| Jul 16, 2025 | Completed final sign-off Jan 2026 | 245 05th Av | unit #245: reconfigure deck on 3/f per plan.Details
unit #245: reconfigure deck on 3/f per plan. | $25,000 |
| Jun 9, 2025 | In progress issued Jun 2025 | 2076 14th Av | rev 201901301666: close the side window on garage floor and 1/f per pland. reduce size of size window on 2/f per plan.Details
rev 201901301666: close the side window on garage floor and 1/f per pland. reduce size of size window on 2/f per plan. | |
| May 22, 2025 | In progress issued Jul 2025 | 11 Surrey St | interior kitchen remodel at the first floor. bathroom remodel at the second floor. removal and replacement of interior finishes on the 1st and 2nd floor for structural work associated for a future renovation/remodel/expansion project.Details
interior kitchen remodel at the first floor. bathroom remodel at the second floor. removal and replacement of interior finishes on the 1st and 2nd floor for structural work associated for a future renovation/remodel/expansion project. | $50,000 |
| Mar 28, 2025 | Completed final sign-off Sep 2025 | 245 05th Av | #245: like for like remodel (e) bathroom. repair the gutter and downspout at rear sunroom. in-kind window replacement for the whole house. no size change & same operation. 19 total windows to be replaced - 11 windows at the front facade to be wood hung or wood aluminum clad.Details
#245: like for like remodel (e) bathroom. repair the gutter and downspout at rear sunroom. in-kind window replacement for the whole house. no size change & same operation. 19 total windows to be replaced - 11 windows at the front facade to be wood hung or wood aluminum clad. | $21,360 |
| Feb 26, 2025 | In progress issued Mar 2025 | 2076 14th Av | revision to pa # 201901301666: change the front windows on 2/f.Details
revision to pa # 201901301666: change the front windows on 2/f. | |
| Dec 18, 2024 | Completed final sign-off May 2025 | 1585 08th Av | install new siding at the backyard side. replace 12 windows in kind at backyard side. not visible from the street.Details
install new siding at the backyard side. replace 12 windows in kind at backyard side. not visible from the street. | $15,000 |
| Dec 18, 2024 | Completed final sign-off Jun 2025 | 2200 Sacramento St | unit #1501: remodel kitchen in kind. adding an electrical washer and dryer in kitchen. relocate a sub panel.Details
unit #1501: remodel kitchen in kind. adding an electrical washer and dryer in kitchen. relocate a sub panel. | $20,000 |
| Oct 22, 2024 | In progress issued Nov 2024 | 123 Cabrillo St | permation grouting of the soil along the existing foundation.Details
permation grouting of the soil along the existing foundation. | $10,000 |
| Oct 3, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | revision to pa # 202407035763: replace the psl beam to steel beam in garage per structural plan. updated mechanical system with mini split unit. repair the exterior staircase at building front.Details
revision to pa # 202407035763: replace the psl beam to steel beam in garage per structural plan. updated mechanical system with mini split unit. repair the exterior staircase at building front. | |
| Sep 27, 2024 | In progress issued Oct 2024 | 2076 14th Av | structural revision to pa # 201901301666: provide a revised excavation to the rear addition per field condition. no shoring permit needed.Details
structural revision to pa # 201901301666: provide a revised excavation to the rear addition per field condition. no shoring permit needed. | |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 2200 Sacramento St | unit #503: 2 bathrooms to install new tiles. reinstall 2 (e) vanities, reinstall 2 (e) toilets and faucets.Details
unit #503: 2 bathrooms to install new tiles. reinstall 2 (e) vanities, reinstall 2 (e) toilets and faucets. | $15,000 |
| Aug 27, 2024 | In progress issued Nov 2024 | 129 Cabrillo St | revision to pa#: 202404260913 due to site discovery: shared footing w/adju bldg (gl a). (e) floor jorst are 2x10; revise beams #103, 108, 113, 114; reference geogrout permit 2024-1022-3443 (123 cabrillo st)Details
revision to pa#: 202404260913 due to site discovery: shared footing w/adju bldg (gl a). (e) floor jorst are 2x10; revise beams #103, 108, 113, 114; reference geogrout permit 2024-1022-3443 (123 cabrillo st) | |
| Aug 23, 2024 | In progress issued Sep 2024 | 2933 19th Av | revision to approved permit# 201902132840: proposed radiant floor heating to entire house instead of central furnace.Details
revision to approved permit# 201902132840: proposed radiant floor heating to entire house instead of central furnace. | $5,000 |
| Aug 19, 2024 | Expired or cancelled withdrawn Apr 2026 | 2076 14th Av | to excavate 3' from backyard doing a osha. cut for shoringDetails
to excavate 3' from backyard doing a osha. cut for shoring | $2,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 1342 29th Av | replace rear exterior siding (850 sqft) in kind. replace 9 windows in kind in the rearDetails
replace rear exterior siding (850 sqft) in kind. replace 9 windows in kind in the rear | $15,000 |
| Jul 3, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | revision to pa #202401254605: add new wall at interior staircase on 2/f. replace footing at 2- (e) post & remove (e) posts on g/f structural plan. remove door between utility room & common area on 1/f.Details
revision to pa #202401254605: add new wall at interior staircase on 2/f. replace footing at 2- (e) post & remove (e) posts on g/f structural plan. remove door between utility room & common area on 1/f. | |
| Apr 26, 2024 | In progress issued Jul 2024 | 129 Cabrillo St | ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground flDetails
ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground fl | $175,000 |
| Mar 8, 2024 | Completed final sign-off Apr 2024 | 4096 17th St | unit 309; convert a bathtub to showerpan with new shower wall panel.Details
unit 309; convert a bathtub to showerpan with new shower wall panel. | $6,000 |
| Jan 25, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | add laundry room, utility room, sauna room, & bathroom on 1/f. remodel (e) kitchen w/ open design concept on 2/f. remodel (e) bathroom on 2/f. add (n) powder room on 2/f. convert 2 (e) bedrooms into (n) bedroom w/ master bath and walkin closet on 2/f. reconfiure & relocate interior staircase.Details
add laundry room, utility room, sauna room, & bathroom on 1/f. remodel (e) kitchen w/ open design concept on 2/f. remodel (e) bathroom on 2/f. add (n) powder room on 2/f. convert 2 (e) bedrooms into (n) bedroom w/ master bath and walkin closet on 2/f. reconfiure & relocate interior staircase. | $80,000 |
| Jan 16, 2024 | Completed final sign-off Jul 2024 | 2460 39th Av | renovation 2 full bathrooms, 1 kitchen, adding recess lights to all bedroom and living room.Details
renovation 2 full bathrooms, 1 kitchen, adding recess lights to all bedroom and living room. | $60,000 |
| Oct 17, 2023 | Completed final sign-off May 2024 | 2766 21st St | interior renovation for 2nd fl - reconfigure interior layout from 2 bedrooms/2bath to 4 bedrooms/2 baths; infill 4 windows at west side of buildingDetails
interior renovation for 2nd fl - reconfigure interior layout from 2 bedrooms/2bath to 4 bedrooms/2 baths; infill 4 windows at west side of building | $30,000 |
| Oct 10, 2023 | Completed final sign-off Jan 2024 | 61 Dorado Tr | replacing 13 windows at back of the house & lightwell area. install new hardi-planks/siding & back of the house & lightwell area in-kindDetails
replacing 13 windows at back of the house & lightwell area. install new hardi-planks/siding & back of the house & lightwell area in-kind | $20,000 |
| Jul 13, 2023 | Never finaled issued Jul 2023, no final | 2140 15th Av | revision to pa# 202209192683, update structural layout of front stairway per existing conditions.Details
revision to pa# 202209192683, update structural layout of front stairway per existing conditions. | |
| Mar 3, 2023 | Completed final sign-off Jul 2023 | 2168 Funston Av | remodel (e) master bathroom in kind. install new sheetrock, new tile, new sink, new vanity, new toilet and new exhaust vent. new shower pan.Details
remodel (e) master bathroom in kind. install new sheetrock, new tile, new sink, new vanity, new toilet and new exhaust vent. new shower pan. | $15,000 |
| Jan 10, 2023 | Completed final sign-off Mar 2023 | 48 Stratford Dr | (e) 1 kitchen remodel in-kind, install new sheetrock, new cabinets, counter top, faucent, appliances. new subpanel. replace (2)(e) windows in-kind facing backyardDetails
(e) 1 kitchen remodel in-kind, install new sheetrock, new cabinets, counter top, faucent, appliances. new subpanel. replace (2)(e) windows in-kind facing backyard | $52,000 |
| Oct 19, 2022 | Completed final sign-off Dec 2022 | 4115 26th St | kitchen remodel in kind. replace kitchen cabinet and counter top.install new appliances. upgrade electrical as needed.Details
kitchen remodel in kind. replace kitchen cabinet and counter top.install new appliances. upgrade electrical as needed. | $8,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 2200 Sacramento St | unit # 1406: remodel 2 (e) bathrooms and 1 (e) kitchen. upgrade electrical as needed.Details
unit # 1406: remodel 2 (e) bathrooms and 1 (e) kitchen. upgrade electrical as needed. | $28,000 |
| Sep 19, 2022 | Never finaled issued Dec 2022, no final | 2140 15th Av | replace in-kind for (e) front staircase. (e) brick finish to be replaced in kind -brick veneerDetails
replace in-kind for (e) front staircase. (e) brick finish to be replaced in kind -brick veneer | $5,000 |
| Jul 8, 2022 | Never finaled issued Oct 2022, no final | 2 Santa Ana Av | remodel of 2 full bathrooms, conversion of 1 powder room to 1 full bathroom. no changes to the exterior wall or openings. no area added.Details
remodel of 2 full bathrooms, conversion of 1 powder room to 1 full bathroom. no changes to the exterior wall or openings. no area added. | $24,000 |
| May 12, 2022 | Completed final sign-off Aug 2022 | 2140 15th Av | interior swimming poop infill (205 sqft) at ground floor level.Details
interior swimming poop infill (205 sqft) at ground floor level. | $5,000 |
| Mar 18, 2022 | Never finaled issued Mar 2022, no final | 2933 19th Av | at 1/f. revision to approved pa# 201902132840. remove (e) wall at garage, change room layout per plans; at 2nd fl, new open living room at front, at 3/f, change floor layout per plans, new beam per plan & stair construction details.Details
at 1/f. revision to approved pa# 201902132840. remove (e) wall at garage, change room layout per plans; at 2nd fl, new open living room at front, at 3/f, change floor layout per plans, new beam per plan & stair construction details. | $1,000 |
| Feb 16, 2022 | Completed final sign-off Feb 2024 | 35 Broadmoor Dr | interior demo and rennovation of extg basement, 1st and 2nd levels. remove and replace extg windows where indicated in plans. add new doors+windows at non-street elevations where indicated in plans. add new skylights, remove extg deck at rear yard, replace with new uncovered deck smaller than (e).Details
interior demo and rennovation of extg basement, 1st and 2nd levels. remove and replace extg windows where indicated in plans. add new doors+windows at non-street elevations where indicated in plans. add new skylights, remove extg deck at rear yard, replace with new uncovered deck smaller than (e). | $420,000 |
| Jan 20, 2022 | Completed final sign-off Aug 2022 | 2709 43rd Av | comply with nov #202183969 work in 1st floor only: adu 1)seperate entrance created to 1st floor. 2) installing kitchen sink, cabinets, counter stove with hood. 3) convert home office to new bed room.Details
comply with nov #202183969 work in 1st floor only: adu 1)seperate entrance created to 1st floor. 2) installing kitchen sink, cabinets, counter stove with hood. 3) convert home office to new bed room. | $5,000 |
| Jan 7, 2022 | Completed final sign-off Jul 2022 | 102 Carmel St | non structural: (1) bathroom remodel: upgrade electrical and add a subpanel 60amps.Details
non structural: (1) bathroom remodel: upgrade electrical and add a subpanel 60amps. | $18,000 |
| Jan 3, 2022 | In progress issued Dec 2024 | 2052 14th Av | 4 story vertical & side horizontal addition for new bedrooms and living space-new roof deck at 3rd floor roof. alter (e) floor layout including demolition and construction. remodel (e) kitchen & living space @ 2nd flr. enlarge (e) garage space @ 1st flr.Details
4 story vertical & side horizontal addition for new bedrooms and living space-new roof deck at 3rd floor roof. alter (e) floor layout including demolition and construction. remodel (e) kitchen & living space @ 2nd flr. enlarge (e) garage space @ 1st flr. | $250,000 |
| Nov 12, 2021 | Completed final sign-off Jul 2022 | 35 Milton St | add (n) 2 x 4 skylight @ living rm. reolace (e) windows @ kitchen and bathroom @ side and rear location. size & style remain the same. (not visible from st)Details
add (n) 2 x 4 skylight @ living rm. reolace (e) windows @ kitchen and bathroom @ side and rear location. size & style remain the same. (not visible from st) | $2,000 |
| Jan 30, 2019 | In progress issued Oct 2023 | 2076 14th Av | rear yard addition to (e) 2-story house. additon & renovation to include a (n) batrhoom, library, family rm on the 1st flr. add a (n) master suite, additional bedrm & (n) laundry rm on 2nd flr, outdoor terrace, retaining walls & stairs added in rear yard.Details
rear yard addition to (e) 2-story house. additon & renovation to include a (n) batrhoom, library, family rm on the 1st flr. add a (n) master suite, additional bedrm & (n) laundry rm on 2nd flr, outdoor terrace, retaining walls & stairs added in rear yard. | $363,757 |