Kyle Wong Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2019 to Apr 2026
- Last 24 months
- 17 permits filed
46 permits since 2000: 26 completed, 15 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
9 stairs permits: 3 completed, 3 in progress, 3 never finaled. Typically 35 days from filing to permit and 767 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2025 | In progress issued Feb 2026 | 639 Teresita Bl | remove dryrot ground level deck and rebuild rear dekc and stairs in kind.demolish existing rear wood balconies on 1st and 2nd flrs.install new metal balconies on rear elevations legalize exist.first basement as media room w/bathroom fully sprinkler entire bldg.deferred permit:sprinkler entire bldgDetails
remove dryrot ground level deck and rebuild rear dekc and stairs in kind.demolish existing rear wood balconies on 1st and 2nd flrs.install new metal balconies on rear elevations legalize exist.first basement as media room w/bathroom fully sprinkler entire bldg.deferred permit:sprinkler entire bldg | $55,000 |
| Oct 3, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | revision to pa # 202407035763: replace the psl beam to steel beam in garage per structural plan. updated mechanical system with mini split unit. repair the exterior staircase at building front.Details
revision to pa # 202407035763: replace the psl beam to steel beam in garage per structural plan. updated mechanical system with mini split unit. repair the exterior staircase at building front. | |
| Jul 3, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | revision to pa #202401254605: add new wall at interior staircase on 2/f. replace footing at 2- (e) post & remove (e) posts on g/f structural plan. remove door between utility room & common area on 1/f.Details
revision to pa #202401254605: add new wall at interior staircase on 2/f. replace footing at 2- (e) post & remove (e) posts on g/f structural plan. remove door between utility room & common area on 1/f. | |
| Apr 26, 2024 | In progress issued Jul 2024 | 129 Cabrillo St | ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground flDetails
ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground fl | $175,000 |
| Jan 25, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | add laundry room, utility room, sauna room, & bathroom on 1/f. remodel (e) kitchen w/ open design concept on 2/f. remodel (e) bathroom on 2/f. add (n) powder room on 2/f. convert 2 (e) bedrooms into (n) bedroom w/ master bath and walkin closet on 2/f. reconfiure & relocate interior staircase.Details
add laundry room, utility room, sauna room, & bathroom on 1/f. remodel (e) kitchen w/ open design concept on 2/f. remodel (e) bathroom on 2/f. add (n) powder room on 2/f. convert 2 (e) bedrooms into (n) bedroom w/ master bath and walkin closet on 2/f. reconfiure & relocate interior staircase. | $80,000 |
| Jul 13, 2023 | Never finaled issued Jul 2023, no final | 2140 15th Av | revision to pa# 202209192683, update structural layout of front stairway per existing conditions.Details
revision to pa# 202209192683, update structural layout of front stairway per existing conditions. | |
| Sep 19, 2022 | Never finaled issued Dec 2022, no final | 2140 15th Av | replace in-kind for (e) front staircase. (e) brick finish to be replaced in kind -brick veneerDetails
replace in-kind for (e) front staircase. (e) brick finish to be replaced in kind -brick veneer | $5,000 |
| Mar 18, 2022 | Never finaled issued Mar 2022, no final | 2933 19th Av | at 1/f. revision to approved pa# 201902132840. remove (e) wall at garage, change room layout per plans; at 2nd fl, new open living room at front, at 3/f, change floor layout per plans, new beam per plan & stair construction details.Details
at 1/f. revision to approved pa# 201902132840. remove (e) wall at garage, change room layout per plans; at 2nd fl, new open living room at front, at 3/f, change floor layout per plans, new beam per plan & stair construction details. | $1,000 |
| Jan 30, 2019 | In progress issued Oct 2023 | 2076 14th Av | rear yard addition to (e) 2-story house. additon & renovation to include a (n) batrhoom, library, family rm on the 1st flr. add a (n) master suite, additional bedrm & (n) laundry rm on 2nd flr, outdoor terrace, retaining walls & stairs added in rear yard.Details
rear yard addition to (e) 2-story house. additon & renovation to include a (n) batrhoom, library, family rm on the 1st flr. add a (n) master suite, additional bedrm & (n) laundry rm on 2nd flr, outdoor terrace, retaining walls & stairs added in rear yard. | $363,757 |