Back to bathroom remodel contractors
Kyle Wong Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2019 to Apr 2026
- Last 24 months
- 17 permits filed
46 permits since 2000: 26 completed, 15 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 11 completed, 4 in progress, 1 never finaled. Typically 2 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2026 | In progress issued Apr 2026 | 2222 Hyde St | unit #1 remodel existing primary bathroom and dressing area. remodel existing powder bath, fixture locations to remain. modify part of kitchen. no structural work.Details
unit #1 remodel existing primary bathroom and dressing area. remodel existing powder bath, fixture locations to remain. modify part of kitchen. no structural work. | $88,281 |
| Dec 5, 2025 | Completed final sign-off Dec 2025 | 3503 Cabrillo St | water damage repair at kitchen& 2 bathrooms area. drywall repair. plumbing pip/copper replacement. ~200 sqftDetails
water damage repair at kitchen& 2 bathrooms area. drywall repair. plumbing pip/copper replacement. ~200 sqft | $10,000 |
| Dec 5, 2025 | In progress issued Feb 2026 | 639 Teresita Bl | remove dryrot ground level deck and rebuild rear dekc and stairs in kind.demolish existing rear wood balconies on 1st and 2nd flrs.install new metal balconies on rear elevations legalize exist.first basement as media room w/bathroom fully sprinkler entire bldg.deferred permit:sprinkler entire bldgDetails
remove dryrot ground level deck and rebuild rear dekc and stairs in kind.demolish existing rear wood balconies on 1st and 2nd flrs.install new metal balconies on rear elevations legalize exist.first basement as media room w/bathroom fully sprinkler entire bldg.deferred permit:sprinkler entire bldg | $55,000 |
| Jul 17, 2025 | Completed final sign-off Oct 2025 | 580 Corbett Av | remodel one kitchen and one full bathroom in kind. add a sub panel. no removal of wallsDetails
remodel one kitchen and one full bathroom in kind. add a sub panel. no removal of walls | $30,000 |
| May 22, 2025 | In progress issued Jul 2025 | 11 Surrey St | interior kitchen remodel at the first floor. bathroom remodel at the second floor. removal and replacement of interior finishes on the 1st and 2nd floor for structural work associated for a future renovation/remodel/expansion project.Details
interior kitchen remodel at the first floor. bathroom remodel at the second floor. removal and replacement of interior finishes on the 1st and 2nd floor for structural work associated for a future renovation/remodel/expansion project. | $50,000 |
| Mar 28, 2025 | Completed final sign-off Sep 2025 | 245 05th Av | #245: like for like remodel (e) bathroom. repair the gutter and downspout at rear sunroom. in-kind window replacement for the whole house. no size change & same operation. 19 total windows to be replaced - 11 windows at the front facade to be wood hung or wood aluminum clad.Details
#245: like for like remodel (e) bathroom. repair the gutter and downspout at rear sunroom. in-kind window replacement for the whole house. no size change & same operation. 19 total windows to be replaced - 11 windows at the front facade to be wood hung or wood aluminum clad. | $21,360 |
| Sep 18, 2024 | Completed final sign-off Dec 2024 | 2200 Sacramento St | unit #503: 2 bathrooms to install new tiles. reinstall 2 (e) vanities, reinstall 2 (e) toilets and faucets.Details
unit #503: 2 bathrooms to install new tiles. reinstall 2 (e) vanities, reinstall 2 (e) toilets and faucets. | $15,000 |
| Apr 26, 2024 | In progress issued Jul 2024 | 129 Cabrillo St | ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground flDetails
ground fl infill under e) rear rm (136 sf). ground fl remodel to add a bedroom, bathroom & new kitchenette (548 sf total). interior stairs connecting to 2nd/f. e) garage to remain. new kitchenette at ground fl | $175,000 |
| Jan 25, 2024 | Completed final sign-off Aug 2026 | 3068 Castro St | add laundry room, utility room, sauna room, & bathroom on 1/f. remodel (e) kitchen w/ open design concept on 2/f. remodel (e) bathroom on 2/f. add (n) powder room on 2/f. convert 2 (e) bedrooms into (n) bedroom w/ master bath and walkin closet on 2/f. reconfiure & relocate interior staircase.Details
add laundry room, utility room, sauna room, & bathroom on 1/f. remodel (e) kitchen w/ open design concept on 2/f. remodel (e) bathroom on 2/f. add (n) powder room on 2/f. convert 2 (e) bedrooms into (n) bedroom w/ master bath and walkin closet on 2/f. reconfiure & relocate interior staircase. | $80,000 |
| Jan 16, 2024 | Completed final sign-off Jul 2024 | 2460 39th Av | renovation 2 full bathrooms, 1 kitchen, adding recess lights to all bedroom and living room.Details
renovation 2 full bathrooms, 1 kitchen, adding recess lights to all bedroom and living room. | $60,000 |
| Oct 17, 2023 | Completed final sign-off May 2024 | 2766 21st St | interior renovation for 2nd fl - reconfigure interior layout from 2 bedrooms/2bath to 4 bedrooms/2 baths; infill 4 windows at west side of buildingDetails
interior renovation for 2nd fl - reconfigure interior layout from 2 bedrooms/2bath to 4 bedrooms/2 baths; infill 4 windows at west side of building | $30,000 |
| Mar 3, 2023 | Completed final sign-off Jul 2023 | 2168 Funston Av | remodel (e) master bathroom in kind. install new sheetrock, new tile, new sink, new vanity, new toilet and new exhaust vent. new shower pan.Details
remodel (e) master bathroom in kind. install new sheetrock, new tile, new sink, new vanity, new toilet and new exhaust vent. new shower pan. | $15,000 |
| Oct 14, 2022 | Completed final sign-off Jul 2023 | 2200 Sacramento St | unit # 1406: remodel 2 (e) bathrooms and 1 (e) kitchen. upgrade electrical as needed.Details
unit # 1406: remodel 2 (e) bathrooms and 1 (e) kitchen. upgrade electrical as needed. | $28,000 |
| Jul 8, 2022 | Never finaled issued Oct 2022, no final | 2 Santa Ana Av | remodel of 2 full bathrooms, conversion of 1 powder room to 1 full bathroom. no changes to the exterior wall or openings. no area added.Details
remodel of 2 full bathrooms, conversion of 1 powder room to 1 full bathroom. no changes to the exterior wall or openings. no area added. | $24,000 |
| Jan 7, 2022 | Completed final sign-off Jul 2022 | 102 Carmel St | non structural: (1) bathroom remodel: upgrade electrical and add a subpanel 60amps.Details
non structural: (1) bathroom remodel: upgrade electrical and add a subpanel 60amps. | $18,000 |
| Nov 12, 2021 | Completed final sign-off Jul 2022 | 35 Milton St | add (n) 2 x 4 skylight @ living rm. reolace (e) windows @ kitchen and bathroom @ side and rear location. size & style remain the same. (not visible from st)Details
add (n) 2 x 4 skylight @ living rm. reolace (e) windows @ kitchen and bathroom @ side and rear location. size & style remain the same. (not visible from st) | $2,000 |