Block 0111, lot 002
1001 Front St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 2
- Rooms
- 12 bathrooms
- Building
- 101,160 sq ft
- Lot
- 33,000 sq ft
- Zoning
- C2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
35 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 1001 Front St | Bcci Construction Company | basement, 1st flr, 2nd floor - demo only permit per ab017Details
basement, 1st flr, 2nd floor - demo only permit per ab017 | $150,000 |
| Dec 30, 2025 | In progress filed Dec 2025, not yet issued | 50 Green St | 1st/f & mezzanine: install new finishes, demo e) finishes. 2nf/f: interior t.i. new partitions, doors, finishes, ceiling & lighting mep deferredDetails
1st/f & mezzanine: install new finishes, demo e) finishes. 2nf/f: interior t.i. new partitions, doors, finishes, ceiling & lighting mep deferred | $750,172 | |
| Dec 13, 2024 | In progress issued Dec 2024 | 50 Green St | Matrix Hg Inc | to obtain final inspection for work approved under pa# 201812178453. all work is complete.Details
to obtain final inspection for work approved under pa# 201812178453. all work is complete. | |
| Jul 13, 2023 | Completed final sign-off Nov 2023 | 50 Green St | Peacock Construction | 1/f: electrical work for lobby refresh lighting remodel and receptacle for floor lamp, lighting fixtures and associated circuiting/controls, receptacle device and associated wiring.Details
1/f: electrical work for lobby refresh lighting remodel and receptacle for floor lamp, lighting fixtures and associated circuiting/controls, receptacle device and associated wiring. | $10,000 |
| May 12, 2022 | Completed final sign-off Jan 2023 | 1001 Front St | Everon Llc | as-built: fire alarm system expansion per sffd. as-built plans per fire inspector notes. add 40 horns / strobes, 3 strobes only, 13 duct detectors, 3 smoke detectors, 17 controle relayes, 5 pull stations & 1 power supply.Details
as-built: fire alarm system expansion per sffd. as-built plans per fire inspector notes. add 40 horns / strobes, 3 strobes only, 13 duct detectors, 3 smoke detectors, 17 controle relayes, 5 pull stations & 1 power supply. | $30,000 |
| Apr 26, 2022 | Expired or cancelled cancelled Jan 2026 | 50 Green St | Peacock Construction | suites 150 & 250: interior demo of interior partitions, doors, finishes, ceiling, lighting, mechanical,electrical outlets & switches.(n) wall construction lighting, finishes. 1/f & mezz: consists of demo (e) finishes & (n) finishes only. ref to mep & structural plans for respective scope.Details
suites 150 & 250: interior demo of interior partitions, doors, finishes, ceiling, lighting, mechanical,electrical outlets & switches.(n) wall construction lighting, finishes. 1/f & mezz: consists of demo (e) finishes & (n) finishes only. ref to mep & structural plans for respective scope. | $199,000 |
| May 25, 2021 | Completed final sign-off Jan 2023 | 1001 Front St | Everon Llc | new fire alarm system - (1) new facu, (1) remote annunciator, (1) power supply, (4) pull stations, (7) smoke detectors, (1) wireless comm + ! monitoring module, (3) control relay for existing elevator function, (15) duct detectors for fan unit w/control relay, (3) strobes, (33) horn/strobes, (2) relDetails
new fire alarm system - (1) new facu, (1) remote annunciator, (1) power supply, (4) pull stations, (7) smoke detectors, (1) wireless comm + ! monitoring module, (3) control relay for existing elevator function, (15) duct detectors for fan unit w/control relay, (3) strobes, (33) horn/strobes, (2) rel | $32,000 |
| Sep 18, 2020 | Completed final sign-off Jan 2023 | 1001 Front St | Richlen Construction | mechanical revision to pa# 202008041061. (1st, 2nd, mezz, roof)Details
mechanical revision to pa# 202008041061. (1st, 2nd, mezz, roof) | $650,000 |
| Aug 4, 2020 | Completed final sign-off Jan 2023 | 1001 Front St | Richlen Construction | 2nd floor: interior t.i. , selective demo of non-structural partitions, millwork & finishes, construction of new non-structural partition, millwork and finishes. mep is deferred.Details
2nd floor: interior t.i. , selective demo of non-structural partitions, millwork & finishes, construction of new non-structural partition, millwork and finishes. mep is deferred. | $1,300,000 |
| Aug 4, 2020 | Completed final sign-off Jan 2023 | 1001 Front St | Richlen Construction | interior tenant improvement. demo of non-structural partitions, millwork & finishes, construction of new non-structural partitions. mep is deferred.Details
interior tenant improvement. demo of non-structural partitions, millwork & finishes, construction of new non-structural partitions. mep is deferred. | $865,000 |
| Jul 24, 2020 | Never finaled filed Jul 2020, never issued | 50 Green St | street space | ||
| Jul 16, 2020 | Never finaled issued Jul 2020, no final | 50 Green St | street spaceDetails
street space | ||
| Jun 10, 2020 | Completed final sign-off May 2021 | 50 Green St | The Lawson Roofing Co Inc. | reroofingDetails
reroofing | $2,493,031 |
| Nov 22, 2019 | Expired or cancelled cancelled Jan 2026 | 50 Green St | per previously submitted ada entry ordinance forms, project consists of barrier removal, adding auatomatic door operator actuatct at building main entry per da-004 & da-005Details
per previously submitted ada entry ordinance forms, project consists of barrier removal, adding auatomatic door operator actuatct at building main entry per da-004 & da-005 | ||
| Nov 22, 2019 | Expired or cancelled cancelled Jan 2026 | 50 Green St | per previously submitted ada entry ordinance forms, project consists of barrier removal, adding auatomatic door operator actuatct at building main entry per da-004 & da-005Details
per previously submitted ada entry ordinance forms, project consists of barrier removal, adding auatomatic door operator actuatct at building main entry per da-004 & da-005 | $10 | |
| Dec 17, 2018 | Never finaled issued Dec 2018, no final | 50 Green St | Matrix Hg Inc | replace (3) tree ton and (1) one (3) ten packaged heat pumps, roof top mounted on deck. like for like.Details
replace (3) tree ton and (1) one (3) ten packaged heat pumps, roof top mounted on deck. like for like. | $70,000 |
| Jan 24, 2018 | Completed final sign-off Mar 2019 | 50 Green St | mechanical platform repair above roof: replace wood platform for hvac equipment on roof to match extg. m.e.p. under separate permit. n/a for maherDetails
mechanical platform repair above roof: replace wood platform for hvac equipment on roof to match extg. m.e.p. under separate permit. n/a for maher | $20,000 | |
| Jun 7, 2016 | Never finaled issued Aug 2016, no final | 1040 Battery St | Pop Construction A Parnership | renovate 2 (e) restrooms to include new tiles, sinks, toilets, faucets, & ceiling tiles and doors. location of toilets, urinal, sinks & doors stay in (e) locations. no structural work & no proposed change in sq footage. maher naDetails
renovate 2 (e) restrooms to include new tiles, sinks, toilets, faucets, & ceiling tiles and doors. location of toilets, urinal, sinks & doors stay in (e) locations. no structural work & no proposed change in sq footage. maher na | $30,000 |
| Sep 17, 2015 | Completed final sign-off Aug 2016 | 50 Green St | Sabah International Incorporated | add 1 monitor module monitor new water flow switch for sprinkler system. n/a maher ord # 155-13Details
add 1 monitor module monitor new water flow switch for sprinkler system. n/a maher ord # 155-13 | $15,000 |
| Apr 24, 2014 | Completed final sign-off Apr 2014 | 1010 Battery St | Golden Gate Fire Protection Inc | ground floor - relocate 11 (e) pendent sprinklers. ref #2014.0127.7119. compliance with ordinance #155-13 not requiredDetails
ground floor - relocate 11 (e) pendent sprinklers. ref #2014.0127.7119. compliance with ordinance #155-13 not required | $5,665 |
| Jan 27, 2014 | Completed final sign-off Jun 2014 | 1010 Battery St | Swinerton Builders | exterior finishes: new metal panels, stucco and new exterior lighting. minor modification to clerestory window to reduce its lenght. elec, ltg, under seperate permit.n/a for the maher ordinance n0. 155-13Details
exterior finishes: new metal panels, stucco and new exterior lighting. minor modification to clerestory window to reduce its lenght. elec, ltg, under seperate permit.n/a for the maher ordinance n0. 155-13 | $78,000 |
| Jul 3, 2013 | Completed final sign-off Aug 2013 | 50 Green St | Specialized Graphics Inc | evacuation maps (4) on 1, mezz, and 2nd floor.Details
evacuation maps (4) on 1, mezz, and 2nd floor. | $800 |
| May 23, 2013 | Never finaled issued May 2013, no final | 1010 Battery St | R L H Fire Protection Inc | 2nd floor-add new pendent sprinklers per tenant improvement-28 addedDetails
2nd floor-add new pendent sprinklers per tenant improvement-28 added | $14,392 |
| Apr 19, 2013 | Completed final sign-off Feb 2014 | 1010 Battery St | Field Construction Inc. | interior tennant improvement - office space on 2nd floorDetails
interior tennant improvement - office space on 2nd floor | $850,000 |
| May 16, 2011 | Never finaled issued May 2011, no final | 1001 Front St | Bcci Construction Company | to obtain final inspection for work approved under pa # 200402136440. all work is completeDetails
to obtain final inspection for work approved under pa # 200402136440. all work is complete | |
| Feb 8, 2005 | Completed final sign-off Jun 2005 | 1001 Front St | demolition of full ht.partition & construction of new non-rated partitions with associated ceiling &Details
demolition of full ht.partition & construction of new non-rated partitions with associated ceiling & | $60,000 | |
| Feb 25, 2004 | Completed final sign-off Aug 2004 | 1001 Front St | Bcci Construction Company | electrical and mechanical work on 2/f file server room no increase in office spaceDetails
electrical and mechanical work on 2/f file server room no increase in office space | $25,000 |
| Feb 20, 2004 | Completed final sign-off Aug 2004 | 1001 Front St | Intelligent Technologies & Services Inc | 2nd floor. install hfc-125 clean agent fire suppression systemDetails
2nd floor. install hfc-125 clean agent fire suppression system | $10,000 |
| Feb 13, 2004 | Expired or cancelled expired Aug 2005 | 1001 Front St | Bcci Construction Company | structural work on roof to support new ac units & on 3/f to support associated fan coils.arch.workDetails
structural work on roof to support new ac units & on 3/f to support associated fan coils.arch.work | $12,000 |
| Jan 8, 2004 | Completed final sign-off Aug 2004 | 1001 Front St | Bcci Construction Company | add computer room including raised floor & partitions.elec.mech & lighting to be submitted seperatelDetails
add computer room including raised floor & partitions.elec.mech & lighting to be submitted seperatel | $125,000 |
| Aug 26, 2002 | Expired or cancelled cancelled Dec 2002 | 1001 Front St | to erect non electric single faced signDetails
to erect non electric single faced sign | $8,500 | |
| Sep 26, 2000 | Expired or cancelled expired Jan 2001 | 1001 Front St | Thomas Swan Sign Co Inc | to erect non electric, single faced wall signDetails
to erect non electric, single faced wall sign | |
| May 3, 2000 | Expired or cancelled expired Jan 2002 | 50 Green St | Bcci Construction Company | oti-1, el, me 2nd floorDetails
oti-1, el, me 2nd floor | $30,000 |
| Apr 27, 2000 | Expired or cancelled expired Dec 2001 | 1010 Battery St | oti-1 lighting,mechanical,1st floorDetails
oti-1 lighting,mechanical,1st floor | $30,000 | |
| Mar 2, 2000 | Expired or cancelled withdrawn Jun 2000 | 1001 Front St | fabricate & install 2 bannerDetails
fabricate & install 2 banner | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bcci Construction Company (6), Richlen Construction (3), Everon Llc (2), Matrix Hg Inc (2), Peacock Construction (2), Field Construction Inc., Golden Gate Fire Protection Inc, Intelligent Technologies & Services Inc, Pop Construction A Parnership, R L H Fire Protection Inc, Sabah International Incorporated, Specialized Graphics Inc, Swinerton Builders, The Lawson Roofing Co Inc., Thomas Swan Sign Co Inc
- Architects
- Scott E Clement (4), Adriana Daringa, Ashley Miller, Ian Glidden, Nelson & Assoc, Richard Pollack
- Engineers
- Amit Wadhwa (2), Alexander Joseph Pacheco
- Authorized agent-otherss
- Twyla Summers (2)