Advanced Installation Services Llc
- Based in
- Union City
- On San Francisco permits
- Oct 2015 to Apr 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2017 | Never finaled issued May 2017, no final | 1 Montgomery St | install prefab demountable walls- shop drawings for structural only. ref app#201612205388 for 24th floor and 201612205390 for 25th floor.Details
install prefab demountable walls- shop drawings for structural only. ref app#201612205388 for 24th floor and 201612205390 for 25th floor. | $75,000 |
| Oct 7, 2015 | Never finaled issued Oct 2015, no final | 75 Hawthorne St | assemble and install teknion altos (glass) parition walls per floor plans. reference bpa# 2013-1218-4504.Details
assemble and install teknion altos (glass) parition walls per floor plans. reference bpa# 2013-1218-4504. | $528,040 |