Virginie Manichon
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Eag Studio
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Jun 2024
114 permits since 2000 (architect on 108 permits, authorized agent-others on 2 permits, designer on 2 permits, engineer on 2 permits, pmt consultant/expediter on 1 permit): 81 completed, 13 never finaled, 20 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 114.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 14, 2024 | Completed final sign-off Dec 2024 | 3838 California St | Dpr Construction A | limited construction of a new radiology xray room and control room in suite 707. suite is currently vacant. no affect to occupancy and/or exitingDetails
limited construction of a new radiology xray room and control room in suite 707. suite is currently vacant. no affect to occupancy and/or exiting | $74,910 |
| May 9, 2024 | Completed final sign-off May 2025 | 747 Front St | San Francisco Commercial Builders Inc | g/f: demise new tenant suite. mep deferred.Details
g/f: demise new tenant suite. mep deferred. | $96,000 |
| Nov 9, 2023 | Completed final sign-off Jul 2024 | 394 Pacific Av | Gci, Inc | basement level: remodel 1 (e) unisex restroom and construction of 1 new unisex restroom and shower. mep, life safety, mep are under separate permits.Details
basement level: remodel 1 (e) unisex restroom and construction of 1 new unisex restroom and shower. mep, life safety, mep are under separate permits. | $60,000 |
| Aug 1, 2023 | Completed final sign-off May 2024 | 595 Market St | Gci, Inc | 13th fl, ste 1350 - revision to pa 2023-0613-9988 scope includes deletion of 1 non ada accessible gender neutral tenant restroom and rename to storage. revision to security walltypes, lighting plan, finishes and door scheduleDetails
13th fl, ste 1350 - revision to pa 2023-0613-9988 scope includes deletion of 1 non ada accessible gender neutral tenant restroom and rename to storage. revision to security walltypes, lighting plan, finishes and door schedule | |
| Sep 7, 2018 | Never finaled issued Dec 2021, no final | 45 Clarendon Av | Citywest Construction Inc. | garage: (n) elevator & entry. level 1: horizontal expansion. level 2: horizontal expansion. level 3: (n) deck @ masterbedroom. roof: (n) roof deckDetails
garage: (n) elevator & entry. level 1: horizontal expansion. level 2: horizontal expansion. level 3: (n) deck @ masterbedroom. roof: (n) roof deck | $250,000 |
| Aug 17, 2018 | Completed final sign-off Sep 2019 | 2828 Jackson St | Flmc Development Corp Dba Adamo Campagna | revision to pa# 2016-1130-3823. minor changes in lightwell at rear area. adddition of new window at rear lightwell. no change in building envelope.Details
revision to pa# 2016-1130-3823. minor changes in lightwell at rear area. adddition of new window at rear lightwell. no change in building envelope. | |
| Jun 25, 2018 | Completed final sign-off Mar 2023 | 3880 19th St | revision to pa #201501206104. basement revision to interior layout unit 1. level 1 revision to layout interior unit 1 & 2. level 2 & 3 revision to layout unit 2.Details
revision to pa #201501206104. basement revision to interior layout unit 1. level 1 revision to layout interior unit 1 & 2. level 2 & 3 revision to layout unit 2. | ||
| May 30, 2018 | Completed final sign-off Sep 2019 | 2828 Jackson St | Flmc Development Corp Dba Adamo Campagna | revision to 201611303823. removal of previously approved stairs in rear yard minor interior reconfiguration of interior walls at basement & level 1. no change exterior or envelopeDetails
revision to 201611303823. removal of previously approved stairs in rear yard minor interior reconfiguration of interior walls at basement & level 1. no change exterior or envelope | |
| Mar 22, 2018 | Expired or cancelled cancelled Mar 2023 | 2828 Jackson St | Flmc Development Corp Dba Adamo Campagna | wind screen at front onlyDetails
wind screen at front only | $1,000 |
| Mar 13, 2018 | Never finaled issued Mar 2021, no final | 2440 Filbert St | Citywest Construction Inc. | vertical & horizontal expansion. facade - restucco, replace windows in kind. 2nd floor deck. 3rd floor roof deck. new interior layout @ all levels. 2 new bedrooms & 3 new baths. new plumbing & electrical. nfpa 13r, sprinklers under seperate permit.Details
vertical & horizontal expansion. facade - restucco, replace windows in kind. 2nd floor deck. 3rd floor roof deck. new interior layout @ all levels. 2 new bedrooms & 3 new baths. new plumbing & electrical. nfpa 13r, sprinklers under seperate permit. | $800,000 |
| Feb 27, 2018 | Completed final sign-off Oct 2019 | 3382 Clay St | Flmc Development Corp Dba Adamo Campagna | revsion to app#201707273151. level 1: new slab to replace extg wood floor. level 2: minor adust to wall openings. level 3: reconfigure laundry bath 2. reconfigure bath 3 and new stair to replace old stair. level 4: relocation of bath. no exterior alteration aside from @ lightwellDetails
revsion to app#201707273151. level 1: new slab to replace extg wood floor. level 2: minor adust to wall openings. level 3: reconfigure laundry bath 2. reconfigure bath 3 and new stair to replace old stair. level 4: relocation of bath. no exterior alteration aside from @ lightwell | $10,000 |
| Jan 23, 2018 | Completed final sign-off Jul 2018 | 300 Beale St | Ramos General Construction Inc. | unit #602 - minor interior renovation of select areas, some new fixture bathroom. addition of partition wall in lower bedrooms.Details
unit #602 - minor interior renovation of select areas, some new fixture bathroom. addition of partition wall in lower bedrooms. | $50,000 |
| Aug 31, 2017 | Completed final sign-off Nov 2019 | 3936 26th St | Metro General Construction | facade restoration - revision to pa 2015-0508-5826 to remove asbestos siding and restore wood siding from original design to clear planning enforcement violation 2017009915enf and 201797171 no structural work. no new fenestration, no change in envelope.Details
facade restoration - revision to pa 2015-0508-5826 to remove asbestos siding and restore wood siding from original design to clear planning enforcement violation 2017009915enf and 201797171 no structural work. no new fenestration, no change in envelope. | $100,000 |
| Aug 8, 2017 | Expired or cancelled withdrawn Jul 2019 | 406 Sanchez St | vertical addition. lower basement flr to create habitable space. (n) electrical & plubming. (n) decks on top of (e) roof levels. nfpa under separate permit.Details
vertical addition. lower basement flr to create habitable space. (n) electrical & plubming. (n) decks on top of (e) roof levels. nfpa under separate permit. | $200,000 | |
| May 24, 2017 | Completed final sign-off Jun 2018 | 1372 Francisco St | Citywest Construction Inc. | revision to 201404143127. admin permit. no work. to document number of stories as 4, correct story heights per plansDetails
revision to 201404143127. admin permit. no work. to document number of stories as 4, correct story heights per plans | |
| Dec 22, 2016 | Completed final sign-off Aug 2017 | 2424 Green St | revision to pa #201507292841 (orig pa #201503171031) - level 1: minor interior layout adjustment, revised window locations at rear, relocation of storage area to garage space, relocate laundry area. level 2: revise wall opening location.Details
revision to pa #201507292841 (orig pa #201503171031) - level 1: minor interior layout adjustment, revised window locations at rear, relocation of storage area to garage space, relocate laundry area. level 2: revise wall opening location. | ||
| Dec 16, 2016 | Completed final sign-off Feb 2021 | 1255 Bay St | Flmc Development Corp Dba Adamo Campagna | horizontal & vertical addition, new front bay windows at level 2, 1st two levels, vertical addition of a new upper unit, level 1, new interior new elevator and bay window, reconstruction of bathroom at unit 1, level 3 & 4 new floors.Details
horizontal & vertical addition, new front bay windows at level 2, 1st two levels, vertical addition of a new upper unit, level 1, new interior new elevator and bay window, reconstruction of bathroom at unit 1, level 3 & 4 new floors. | $350,000 |
| Nov 1, 2016 | Completed final sign-off Nov 2017 | 268 Mallorca Wy | Citywest Construction Inc. | structural revision to pa#201602028654 & pa#201505055376. change in garage floor grading & replace of (e) beam. no exterior work. n/a ordinance #155-13Details
structural revision to pa#201602028654 & pa#201505055376. change in garage floor grading & replace of (e) beam. no exterior work. n/a ordinance #155-13 | |
| Oct 27, 2016 | Completed final sign-off Nov 2017 | 268 Mallorca Wy | Citywest Construction Inc. | (n) roof deck over existing building, no increase in building envelope, no increase in building height; maher n/a10/31/16. structural submission required for roof opening & glazed guard.Details
(n) roof deck over existing building, no increase in building envelope, no increase in building height; maher n/a10/31/16. structural submission required for roof opening & glazed guard. | $10,000 |
| Oct 18, 2016 | Completed final sign-off Nov 2016 | 157 28th Av | Adamas Builders Inc | revision to 201509036086 to comply with complaint 201641162: 585 sq ft of new conditioned space converted from garage. extension to (e) deck in rear. new retaining wall for planter in rear.Details
revision to 201509036086 to comply with complaint 201641162: 585 sq ft of new conditioned space converted from garage. extension to (e) deck in rear. new retaining wall for planter in rear. | $5,000 |
| Jul 19, 2016 | Expired or cancelled cancelled Nov 2022 | 355 Green St | horizontal expansion towards rear of property, horinzontal roof deck expansion, interior reconfiguration of all floors.Details
horizontal expansion towards rear of property, horinzontal roof deck expansion, interior reconfiguration of all floors. | $725,000 | |
| Jun 24, 2016 | Completed final sign-off Nov 2016 | 37 Walnut St | Coulter Construction | remove (e) damaged water proofing on front porch, repair and replace as necessary, install new water proofing, patch stucco as necessary. n/a ordinance #155-13Details
remove (e) damaged water proofing on front porch, repair and replace as necessary, install new water proofing, patch stucco as necessary. n/a ordinance #155-13 | $11,000 |
| May 24, 2016 | Never finaled issued Mar 2017, no final | 3337 Buchanan St | Citywest Construction Inc. | level 1: no work. level 2: (n) windows @ front facade. level 3: upper unit #3337 interior remodel. level 4: upper unit 3337 (n) floor addition w/ (n) roof deck & decks @ front & rear.Details
level 1: no work. level 2: (n) windows @ front facade. level 3: upper unit #3337 interior remodel. level 4: upper unit 3337 (n) floor addition w/ (n) roof deck & decks @ front & rear. | $150,000 |
| Apr 1, 2016 | Never finaled issued Oct 2016, no final | 1831 Union St | erect non electric wall (door/window) sign for "mac"Details
erect non electric wall (door/window) sign for "mac" | $200 | |
| Apr 1, 2016 | Never finaled issued Oct 2016, no final | 1831 Union St | erect non electric projecting double faced sign for "mac"Details
erect non electric projecting double faced sign for "mac" | $200 | |
| Mar 11, 2016 | Never finaled issued Apr 2016, no final | 2444 Van Ness Av | Pascual Diaz Construction | #4 - deferred permit to show details of approved roof deck planters & waterproofing. refer to pa #201512215650.Details
#4 - deferred permit to show details of approved roof deck planters & waterproofing. refer to pa #201512215650. | |
| Feb 16, 2016 | Completed final sign-off May 2016 | 40 Annapolis Tr | Nafius Construction Services Inc. | intedrior remodel of first & second floors, no changes to front facade or upper unit, infill of interior lightwell & (n) skylight.Details
intedrior remodel of first & second floors, no changes to front facade or upper unit, infill of interior lightwell & (n) skylight. | $25,000 |
| Jan 20, 2016 | Completed final sign-off Sep 2017 | 2028 Leavenworth St | Libin Zhang | revision to pa#201410148857, adjust roof deck location per neighbor request, reconfigure skylights, remove approved bath from 1/f & relocate to basement. roof deck to be 4'8" from front property line.Details
revision to pa#201410148857, adjust roof deck location per neighbor request, reconfigure skylights, remove approved bath from 1/f & relocate to basement. roof deck to be 4'8" from front property line. | |
| Jan 5, 2016 | Completed final sign-off Mar 2017 | 157 28th Av | revision to appl #201509036086 to inlcude revised roof pitch to reflect existing condition, add one new skylight, one dormer & window wells at fron facade.Details
revision to appl #201509036086 to inlcude revised roof pitch to reflect existing condition, add one new skylight, one dormer & window wells at fron facade. | $50,000 | |
| Dec 30, 2015 | Never finaled issued May 2017, no final | 3156 Clay St | new roof deck&elevator.unit 3156:reconfigure interior spaces,new bath, lounge area, new rear patio, excavation of 19.44 cu yards,landscape& skylights. unit 3158: reconfigure lving spaces,new deck, new bath. unit 3160 reconfig interior space, new skylights.ref 20150804 /201508134171.Details
new roof deck&elevator.unit 3156:reconfigure interior spaces,new bath, lounge area, new rear patio, excavation of 19.44 cu yards,landscape& skylights. unit 3158: reconfigure lving spaces,new deck, new bath. unit 3160 reconfig interior space, new skylights.ref 20150804 /201508134171. | $150,000 | |
| Nov 9, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | convert extg office space to residential storage space by removing (e) restroom.Details
convert extg office space to residential storage space by removing (e) restroom. | $2,000 | |
| Nov 6, 2015 | Completed final sign-off Aug 2020 | 435 Marina Bl | Citywest Construction Inc. | ~encrypt&horizontal & vertical addition of 1 story & roof deck. new interior layout, new electrical, new plumbing, finish part of garage level into conditioned space, addition of bedrooms & bathrooms. n/a for maher ordinance no.155-13.Details
~encrypt&horizontal & vertical addition of 1 story & roof deck. new interior layout, new electrical, new plumbing, finish part of garage level into conditioned space, addition of bedrooms & bathrooms. n/a for maher ordinance no.155-13. | $249,000 |
| Nov 5, 2015 | Completed final sign-off Jul 2017 | 10 Miller Pl | Flmc Development Corp Dba Adamo Campagna | abatement of asbestos in all drywall & popcorn ceiling, replace in kind 4 bathrooms and 1 kitchen, reframe as necessary. frame soffits for electrical, rework hydronic heating, replace any necessary plumbing, rewire apt. and install 80 lights.Details
abatement of asbestos in all drywall & popcorn ceiling, replace in kind 4 bathrooms and 1 kitchen, reframe as necessary. frame soffits for electrical, rework hydronic heating, replace any necessary plumbing, rewire apt. and install 80 lights. | $10,000 |
| Oct 22, 2015 | Expired or cancelled withdrawn Jan 2025 | 585 Marina Bl | revision to 201505227067 and 2015 0213 8313: interior remodel of level 1: reconfig 2 bathrooms and laundry room level 2: kitchen remodel and new windows in rear. level 3 new bath and bath remodel in rear. level 3 new bath. no work at front facade. new skylightsDetails
revision to 201505227067 and 2015 0213 8313: interior remodel of level 1: reconfig 2 bathrooms and laundry room level 2: kitchen remodel and new windows in rear. level 3 new bath and bath remodel in rear. level 3 new bath. no work at front facade. new skylights | $100,000 | |
| Sep 3, 2015 | Completed final sign-off Mar 2017 | 157 28th Av | revision to permit 2015 0717 1783 - include interior remodel, new dormers and decks. new landscape to comply with complaint 2015 67032Details
revision to permit 2015 0717 1783 - include interior remodel, new dormers and decks. new landscape to comply with complaint 2015 67032 | $75,000 | |
| Aug 28, 2015 | Completed final sign-off Jun 2016 | 44 Mallorca Wy | revision appl. 2015.0402.2633 & 2014.0522.6493. front elevation revise finish style, enlarge front windows and change style per plan. enlarge garage door. revise door swing at front entry. maher n/a.Details
revision appl. 2015.0402.2633 & 2014.0522.6493. front elevation revise finish style, enlarge front windows and change style per plan. enlarge garage door. revise door swing at front entry. maher n/a. | ||
| Aug 20, 2015 | Completed final sign-off Feb 2016 | 3282 Jackson St | revision to issued permit 201507010449; add rear deck @ level 1. no change to front facade.Details
revision to issued permit 201507010449; add rear deck @ level 1. no change to front facade. | $10,000 | |
| Aug 13, 2015 | Expired or cancelled expired Oct 2019 | 3156 Clay St | new garage and reinforced foundation, re-configuration of interior storage spaces at basement level. second exit is routed through garage per ab-020. new back patio under separate application. entire basement to be fully sprinkered per nfpa 13. sprinkler system installation under separate appl.Details
new garage and reinforced foundation, re-configuration of interior storage spaces at basement level. second exit is routed through garage per ab-020. new back patio under separate application. entire basement to be fully sprinkered per nfpa 13. sprinkler system installation under separate appl. | $50,000 | |
| Aug 7, 2015 | Completed final sign-off Oct 2024 | 653 Fell St | remove 1-story garden tool room attached to rear of house. and 1-story garage to comply with variance approval and lot subdivision case 2013.0712s & 20130712v approved 3/26/14. removal of 1-story garage under 2015-01-29-7026. pls route to dcp plan checker max setyadiputra.Details
remove 1-story garden tool room attached to rear of house. and 1-story garage to comply with variance approval and lot subdivision case 2013.0712s & 20130712v approved 3/26/14. removal of 1-story garage under 2015-01-29-7026. pls route to dcp plan checker max setyadiputra. | $2,000 | |
| Aug 3, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | unit #3 - interior remodel, infill of southwest lightwells, reconfiguration of spaces including addition of one bedroom & one bath. replace winodws as shown. ** maher: n/a **Details
unit #3 - interior remodel, infill of southwest lightwells, reconfiguration of spaces including addition of one bedroom & one bath. replace winodws as shown. ** maher: n/a ** | $175,000 | |
| Aug 3, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | unit #1 - interior remodel, infill of southwest lightwell, reconfiguration of spaces including addition of 1 bedroom & 1 bath. replace windows as shown on plans. ** maher: n/a **Details
unit #1 - interior remodel, infill of southwest lightwell, reconfiguration of spaces including addition of 1 bedroom & 1 bath. replace windows as shown on plans. ** maher: n/a ** | $175,000 | |
| Aug 3, 2015 | Completed final sign-off Jul 2020 | 2444 Van Ness Av | unit #2 - interior remodel including addition of one bedroom & one bath. replace windows as shown on plans. n/a maher ordinanceDetails
unit #2 - interior remodel including addition of one bedroom & one bath. replace windows as shown on plans. n/a maher ordinance | $17,000 | |
| Jul 29, 2015 | Completed final sign-off Aug 2017 | 2424 Green St | V & J Construction | revision to 201503171031. remodel interior of lower level only. replace e stair. convert unfinished basement area to finished spaceDetails
revision to 201503171031. remodel interior of lower level only. replace e stair. convert unfinished basement area to finished space | $50,000 |
| Jul 1, 2015 | Completed final sign-off May 2016 | 3284 Jackson St | unit 1/level 1- interior remodel, unit2/level 2- minor interior remodel, no work on unit 2, no work at front facade.Details
unit 1/level 1- interior remodel, unit2/level 2- minor interior remodel, no work on unit 2, no work at front facade. | $125,000 | |
| May 22, 2015 | Expired or cancelled cancelled Aug 2017 | 585 Marina Bl | Citywest Construction Inc. | revision to 2015 0213 8313 - interior remodel of lower level including the addition of 2 bathrooms & laundry room. new landscape & patio in rear. sprinkler under separate permit. maher naDetails
revision to 2015 0213 8313 - interior remodel of lower level including the addition of 2 bathrooms & laundry room. new landscape & patio in rear. sprinkler under separate permit. maher na | $20,000 |
| May 8, 2015 | Completed final sign-off Nov 2019 | 3936 26th St | Foley Construction | interior remodel to all floors and all units - minimal changes to elevations. addition of roof deck. no changes to front facade.Details
interior remodel to all floors and all units - minimal changes to elevations. addition of roof deck. no changes to front facade. | $200,000 |
| Apr 9, 2015 | Expired or cancelled withdrawn Aug 2016 | 2809 Polk St | revision to pa 201504093235 for facade remodel revision.Details
revision to pa 201504093235 for facade remodel revision. | $50,000 | |
| Apr 2, 2015 | Completed final sign-off Jun 2016 | 44 Mallorca Wy | Adamas Builders Inc | facade remodel bay window. n/a for the maherDetails
facade remodel bay window. n/a for the maher | $50,000 |
| Mar 27, 2015 | Completed final sign-off Oct 2017 | 428 Collingwood St | Paul Power Construction, Extol Construction | horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage levelDetails
horizontal addition, vertical addition of one story, additional 3 bedrooms and 3 baths on level 3, new interior layout on all floors, new electrical, new plumbing, new roof deck, minor excavation and finishing of garage level | $190,000 |
| Mar 24, 2015 | Completed final sign-off Jun 2018 | 37 Orben Pl | Foley Construction, Citywest Construction Inc. | 1st flr horizontal expansion. 1st & 2nd flr interior remodel. 3rd & 4th flr addition new automatic full sprinler system should be install throught the entire building. n/a for maher ordinance.Details
1st flr horizontal expansion. 1st & 2nd flr interior remodel. 3rd & 4th flr addition new automatic full sprinler system should be install throught the entire building. n/a for maher ordinance. | $190,000 |
| Mar 17, 2015 | Completed final sign-off Aug 2017 | 2424 Green St | 1st floor: convert storage to habitable space, including new living room, office, bathroom & wet bar. 2nd floor: provide new laundry. 3rd floor: relocate master bath & closet, new windows.Details
1st floor: convert storage to habitable space, including new living room, office, bathroom & wet bar. 2nd floor: provide new laundry. 3rd floor: relocate master bath & closet, new windows. | $115,000 | |
| Mar 11, 2015 | Expired or cancelled cancelled Jan 2024 | 2850 Filbert St | Citywest Construction Inc. | horizontal addition to single family residence. new elevator, roof deck, interior remodel, minal facade adjustment. ** maher: compliance with ordinance no# 155-13 not required **Details
horizontal addition to single family residence. new elevator, roof deck, interior remodel, minal facade adjustment. ** maher: compliance with ordinance no# 155-13 not required ** | $190,000 |
| Mar 2, 2015 | Never finaled issued Mar 2016, no final | 1228 Leavenworth St | vertical addition of one story. new elevator, new interior layout,new electrical,new plumbing, new sprinkler system. reconfiguration of lower unit to 3 levels, 4 beds, 5 1/2 baths, remodel kitchen. upper unit to 2 levels, 3 beds, 2 1/2baths, remodel kitchen. excavation & finisher of basement level.Details
vertical addition of one story. new elevator, new interior layout,new electrical,new plumbing, new sprinkler system. reconfiguration of lower unit to 3 levels, 4 beds, 5 1/2 baths, remodel kitchen. upper unit to 2 levels, 3 beds, 2 1/2baths, remodel kitchen. excavation & finisher of basement level. | $190,000 | |
| Feb 11, 2015 | Expired or cancelled cancelled Aug 2017 | 585 Marina Bl | Citywest Construction Inc. | expansion of garage by 2'6" underneath existing overhanging structure, replace 8" cladding in kind on front facade, replace windows in kind - wood, new garage door, revise roof line, no additional height, new freestanding planters. n/a ordinance #155-13Details
expansion of garage by 2'6" underneath existing overhanging structure, replace 8" cladding in kind on front facade, replace windows in kind - wood, new garage door, revise roof line, no additional height, new freestanding planters. n/a ordinance #155-13 | $25,000 |
| Jan 29, 2015 | Expired or cancelled expired Mar 2022 | 522 Hickory St | construct (n) 3-story single family residential building.Details
construct (n) 3-story single family residential building. | $250,000 | |
| Jan 29, 2015 | Never finaled issued Jan 2017, no final | 524 Hickory St | demolish 1-story garageDetails
demolish 1-story garage | $20,000 | |
| Jan 23, 2015 | Completed final sign-off Oct 2024 | 653 Fell St | unit 1:bsmt level-new fl to incl garage &study rm.level 1-remodel fl to incl kitchen/liv/dining/1bed/1bath. unit 2:level 2-remodel incl kitchen/liv/dining/1 bed/1 bath/deck. level 3-remodel incl 1 bed/1 bath/deck.Details
unit 1:bsmt level-new fl to incl garage &study rm.level 1-remodel fl to incl kitchen/liv/dining/1bed/1bath. unit 2:level 2-remodel incl kitchen/liv/dining/1 bed/1 bath/deck. level 3-remodel incl 1 bed/1 bath/deck. | $190,000 | |
| Jan 20, 2015 | Completed final sign-off Mar 2023 | 3880 19th St | Citywest Construction Inc. | lev 1: relocate 1st unit from lev 2 to lev 1. horizontal expansion to align w/neighboring home. lev 2: horizontal expansion to allign w/neighboring home. reconfigure fl to kitchen/living/family area. lev 3: reconfigure fl to bedrm/office area. lev 4: addition of(n)level w/10'0" setback. (n)nfpa13Details
lev 1: relocate 1st unit from lev 2 to lev 1. horizontal expansion to align w/neighboring home. lev 2: horizontal expansion to allign w/neighboring home. reconfigure fl to kitchen/living/family area. lev 3: reconfigure fl to bedrm/office area. lev 4: addition of(n)level w/10'0" setback. (n)nfpa13 | $250,000 |
| Dec 5, 2014 | Completed final sign-off Oct 2017 | 935 North Point St | facade remodel: to comply with notice of violation 201243544Details
facade remodel: to comply with notice of violation 201243544 | $20,000 | |
| Oct 14, 2014 | Completed final sign-off Sep 2017 | 2028 Leavenworth St | Libin Zhang | lwr living area:reloc unit 1.create addtl sq ft fr garage area.infill litewell.1/flr:new layout,new wndws except frt facade.2/fl:new int layout,new wndws except frt facade,partially raise fl leve.general:new elevator, remove stairs on deck, new sprinkler sys.new roof deck,replace frt wndws in kindDetails
lwr living area:reloc unit 1.create addtl sq ft fr garage area.infill litewell.1/flr:new layout,new wndws except frt facade.2/fl:new int layout,new wndws except frt facade,partially raise fl leve.general:new elevator, remove stairs on deck, new sprinkler sys.new roof deck,replace frt wndws in kind | $250,000 |
| Jul 31, 2014 | Expired or cancelled withdrawn Jul 2015 | 475 22nd Av | horizontal expansion to include: level 1: 1 bed/bath. level 2: kitchen remodel + powder room. level 3: 3 bedroom/2 bath. no change to front facade.Details
horizontal expansion to include: level 1: 1 bed/bath. level 2: kitchen remodel + powder room. level 3: 3 bedroom/2 bath. no change to front facade. | $125,000 | |
| Jul 30, 2014 | Expired or cancelled withdrawn Mar 2017 | 156 27th Av | vertical expansion of a new floor with master bedroom/bath. horizontal expansion towards rear property line, new electrical, new plumbing, new sprinkler system, new landscapingDetails
vertical expansion of a new floor with master bedroom/bath. horizontal expansion towards rear property line, new electrical, new plumbing, new sprinkler system, new landscaping | $195,000 | |
| Jul 30, 2014 | Expired or cancelled withdrawn Oct 2015 | 930 Baker St | erect 3-story, 4 dwelling units with 1 basement, type 5, building.Details
erect 3-story, 4 dwelling units with 1 basement, type 5, building. | $495,000 | |
| Jul 30, 2014 | Expired or cancelled withdrawn Oct 2015 | 930 Baker St | to demolish 2 dwelling units, type 5, building.Details
to demolish 2 dwelling units, type 5, building. | $20,000 | |
| Jun 27, 2014 | Never finaled issued Jun 2018, no final | 2261 Filbert St | horizontal & vertical addition to add 2 story to convert a 2 story 1 unit residence to a 4 story 2 unit residence. roof deck access from 4th floor. expanding garage from 1 car to 4 car garage. 1st & 2nd floor: (n) unit #1 3rd & 4th: (n) unit #2 fully sprinkleredDetails
horizontal & vertical addition to add 2 story to convert a 2 story 1 unit residence to a 4 story 2 unit residence. roof deck access from 4th floor. expanding garage from 1 car to 4 car garage. 1st & 2nd floor: (n) unit #1 3rd & 4th: (n) unit #2 fully sprinklered | $300,000 | |
| May 22, 2014 | Completed final sign-off Jun 2016 | 44 Mallorca Wy | vertical addition of 3rd floor over garage w/ addition of roof deck. horizontal addition to lower floor w/ 1 bedroom/1 bath. minimum infill of (e) lightwells.Details
vertical addition of 3rd floor over garage w/ addition of roof deck. horizontal addition to lower floor w/ 1 bedroom/1 bath. minimum infill of (e) lightwells. | $190,000 | |
| Apr 14, 2014 | Completed final sign-off Jun 2018 | 1372 Francisco St | Citywest Construction Inc. | (add 3rd floor: 1 bedroom/1 bathroom); rear horizontal expansion, kitchen and bathrooms remodel, interior layout reconfiguration, new electrical and new plumbingDetails
(add 3rd floor: 1 bedroom/1 bathroom); rear horizontal expansion, kitchen and bathrooms remodel, interior layout reconfiguration, new electrical and new plumbing | $195,000 |
| Feb 28, 2014 | Completed final sign-off May 2021 | 2809 Polk St | 3rd floor master bedroom addition.Details
3rd floor master bedroom addition. | $110,000 | |
| Feb 3, 2014 | Expired or cancelled expired Jun 2020 | 2319 Webster St | Blake Sanford Construction | addition of basement with storage and hobby room, minor modification of existing wall openings. infill of overhung @ kitchen area. no modification to front facade. retention of all existing architectural featuresDetails
addition of basement with storage and hobby room, minor modification of existing wall openings. infill of overhung @ kitchen area. no modification to front facade. retention of all existing architectural features | $90,000 |
| Jan 7, 2014 | Never finaled issued Mar 2015, no final | 1650 Bay St | reconfigure interior space at gr floor. expand garage into light well and add bedroom. new deck at grd level. enlarge garage door replace with new wood panel door. 2nd fl new pantry at kitchen. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
reconfigure interior space at gr floor. expand garage into light well and add bedroom. new deck at grd level. enlarge garage door replace with new wood panel door. 2nd fl new pantry at kitchen. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $45,000 | |
| Dec 30, 2013 | Completed final sign-off Oct 2017 | 935 North Point St | horizontal & vertical addition with bathroom & kitchen, reconfiguration of all floor; landscaping.Details
horizontal & vertical addition with bathroom & kitchen, reconfiguration of all floor; landscaping. | $170,000 | |
| Oct 10, 2013 | Completed final sign-off Dec 2013 | 221 Main St | Commercial Interior Builders Inc | relocation of new entry. mech, elec, life safety, sprinkler modifications not includedDetails
relocation of new entry. mech, elec, life safety, sprinkler modifications not included | $5,000 |
| Sep 5, 2013 | Completed final sign-off Dec 2014 | 444 De Haro St | Premier Structures Inc | replace existing ground floor property line windows along sidewalk with steel sash to match existing on 2/f.Details
replace existing ground floor property line windows along sidewalk with steel sash to match existing on 2/f. | $610,000 |
| Jul 26, 2013 | Completed final sign-off Aug 2013 | 221 Main St | Cci Com'l Constr & Improv**See 985808*** | 2nd floor-demo of partitons, millwork, electrical, plumbing & ceiling work. architectural, mechanical, sprinkler & life safety are under seperate permits, per ab-017Details
2nd floor-demo of partitons, millwork, electrical, plumbing & ceiling work. architectural, mechanical, sprinkler & life safety are under seperate permits, per ab-017 | $27,500 |
| Jul 24, 2013 | Completed final sign-off Dec 2013 | 240 Stockton St | Howard S. Wright Constructors Lp | 8th floor: revision to permit #201211305228. restroom accessibility upgrades. revision consists of relocation of door hinge and change the swing of the new 90 min fire rated door and frame. floor is currently unoccupied. mep and life safety under seperate permit.Details
8th floor: revision to permit #201211305228. restroom accessibility upgrades. revision consists of relocation of door hinge and change the swing of the new 90 min fire rated door and frame. floor is currently unoccupied. mep and life safety under seperate permit. | |
| Jul 12, 2013 | Expired or cancelled expired Apr 2016 | 425 California St | Cahill Const Service Inc | demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permitDetails
demolition of non structural interior walls. remodel 4th fl restrooms consisting of new fixtures, ceilings, finishes, minor remodel of suite 410 related to restroom modifications. create a new rated elevator lobby. mep, f/a and sprinklers separate permit | $100,000 |
| Mar 22, 2013 | Completed final sign-off Jun 2013 | 49 Stevenson St | Principal Builders Inc. | 3rd floor-office improvements including selective demo of interior partitions, construction of new partitions, installation of new millwork & upgrades to (e) ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit.Details
3rd floor-office improvements including selective demo of interior partitions, construction of new partitions, installation of new millwork & upgrades to (e) ceilings. new finishes & furniture. f/a & sprinklers under seperate permit, mechanical, electrical & plumbing under seperate permit. | $380,000 |
| Feb 11, 2013 | Never finaled issued Mar 2013, no final | 33 New Montgomery St | R.M.R. Construction Company | ada barrier removal. upgrading urinals and toilet. add (1) one toilet plumbing modification is under separate permit.Details
ada barrier removal. upgrading urinals and toilet. add (1) one toilet plumbing modification is under separate permit. | $20,000 |
| Dec 11, 2012 | Completed final sign-off Feb 2013 | 400 Montgomery St | 11/f- demo of select interior partitions, construction of interior non load-bearing partitions in an un-occupied suite. mech, elec, life safety and sprinkler modification are not included under this permit.Details
11/f- demo of select interior partitions, construction of interior non load-bearing partitions in an un-occupied suite. mech, elec, life safety and sprinkler modification are not included under this permit. | $35,500 | |
| Dec 5, 2012 | Completed final sign-off Dec 2012 | 143 08th St | Charles Pankow Builders Ltd | project consists of demolition of 2nd floor ceiling plaster finish. no structural, no mech, plumb. elect, no life safety modifications.Details
project consists of demolition of 2nd floor ceiling plaster finish. no structural, no mech, plumb. elect, no life safety modifications. | $5,000 |
| Nov 27, 2012 | Completed final sign-off Dec 2012 | 343 Sansome St | Field Construction Inc. | project consists of a tenant improvement/expansion on an existing multiple tenant floor. construction of demising partition. existing tenant space is currently occupied. expansion tenant space is unoccupied.Details
project consists of a tenant improvement/expansion on an existing multiple tenant floor. construction of demising partition. existing tenant space is currently occupied. expansion tenant space is unoccupied. | $6,000 |
| Nov 19, 2012 | Completed final sign-off Apr 2014 | 222 Kearny St | Bcci Construction Company | provide new control descent aparatus (davit) and associated safety/structural as required. revise non operable window to operable/access window. provide new access doors. 6th, 8th, 10th flDetails
provide new control descent aparatus (davit) and associated safety/structural as required. revise non operable window to operable/access window. provide new access doors. 6th, 8th, 10th fl | $65,000 |
| Nov 1, 2012 | Completed final sign-off Dec 2012 | 221 Main St | Gci, Inc | 9th floor - demo of interior partitions, flooring, ceiling grid & tiles & light fixtures. arhc, mech, elec, life safety & sprinkelr modifications are not included (ab-017). space remain vacant.Details
9th floor - demo of interior partitions, flooring, ceiling grid & tiles & light fixtures. arhc, mech, elec, life safety & sprinkelr modifications are not included (ab-017). space remain vacant. | $23,000 |
| Oct 29, 2012 | Never finaled issued Nov 2012, no final | 555 Mission St | Rudolph Commercial Interiors Inc, Rci | ti on new partial floor tenant construction of new partitions, doors, power/data and finishes. mep and life safety under separate permitDetails
ti on new partial floor tenant construction of new partitions, doors, power/data and finishes. mep and life safety under separate permit | $200,000 |
| Oct 23, 2012 | Completed final sign-off Feb 2013 | 250 Montgomery St | Peacock Construction Inc | suite 1410:project consists of demolition of extg ceiling ht partitions and associated power/data, new full ht glasing in conference room.new millwork, finishes throughout. space b currently vacant. me and sprinkler under seperate permit.Details
suite 1410:project consists of demolition of extg ceiling ht partitions and associated power/data, new full ht glasing in conference room.new millwork, finishes throughout. space b currently vacant. me and sprinkler under seperate permit. | $113,000 |
| Sep 13, 2012 | Completed final sign-off Dec 2012 | 143 08th St | Charles Pankow Builders Ltd | construction of new offices, new breakroom, new finishes, new lighting, office partitoin walls, workstations. replacement of existing non-conforming stair with new installation of new ada elevator under separate permit from 1st floor to roof deck. mep is under seperate permit.Details
construction of new offices, new breakroom, new finishes, new lighting, office partitoin walls, workstations. replacement of existing non-conforming stair with new installation of new ada elevator under separate permit from 1st floor to roof deck. mep is under seperate permit. | $210,000 |
| Sep 5, 2012 | Completed final sign-off Dec 2012 | 88 Stevenson St | Novo Construction Inc | 2nd/3rd floors-t. work includes new partitions, doors, fixtures, lighting. mechanical, plumbing & fire protection under seperate permits. no exterior workDetails
2nd/3rd floors-t. work includes new partitions, doors, fixtures, lighting. mechanical, plumbing & fire protection under seperate permits. no exterior work | $60,000 |
| Aug 28, 2012 | Completed final sign-off Feb 2013 | 250 Montgomery St | Peacock Construction Inc | 6th floor - build out of new storage/copy room + phone closet in a currently unoccupied space with associated power, ceiling, lighting & finishes. new t.i. under separate permit.Details
6th floor - build out of new storage/copy room + phone closet in a currently unoccupied space with associated power, ceiling, lighting & finishes. new t.i. under separate permit. | $95,000 |
| Aug 20, 2012 | Completed final sign-off Dec 2012 | 143 08th St | Charles Pankow Builders Ltd | project consists of demolition of select (e) interior partitions, finishes & light fixtures. per ab-017, space remain vacant. mep,life safety & sprinkler under separate permit.Details
project consists of demolition of select (e) interior partitions, finishes & light fixtures. per ab-017, space remain vacant. mep,life safety & sprinkler under separate permit. | $10,000 |
| Aug 16, 2012 | Completed final sign-off Jan 2013 | 221 Main St | Commercial Interior Builders Inc | 13th floor - project consists of construction of 1 new conference room & 3 offices & break room. the suite is currently unoccupied. mechanical, electrical, life safety & sprinkler system modification are not included under this permit.Details
13th floor - project consists of construction of 1 new conference room & 3 offices & break room. the suite is currently unoccupied. mechanical, electrical, life safety & sprinkler system modification are not included under this permit. | $110,000 |
| Aug 15, 2012 | Expired or cancelled cancelled Jan 2026 | 240 Stockton St | 7th floor - demo to shell in tenant suite including partitions, doors, ceiling grid & lights, finishes per ab-017. space remain unoccupancy.Details
7th floor - demo to shell in tenant suite including partitions, doors, ceiling grid & lights, finishes per ab-017. space remain unoccupancy. | $20,000 | |
| Aug 15, 2012 | Completed final sign-off Oct 2012 | 250 Montgomery St | Peacock Construction Inc | 2nd floor project consists of demolition of existing ceiling height partitions & associated power/data. new full height glazing in conf room, finishes thru-out. mep, sprinklesr and fire alarm under separate permit. space is currently vacant.Details
2nd floor project consists of demolition of existing ceiling height partitions & associated power/data. new full height glazing in conf room, finishes thru-out. mep, sprinklesr and fire alarm under separate permit. space is currently vacant. | $93,000 |
| Jul 24, 2012 | Completed final sign-off Mar 2014 | 444 De Haro St | Peacock Construction Inc | suites #104/110/201 & 211-minor demo of non-structural partitions, ramps, millwork & associated electrical, plumbing & ceiling work. demo only per ab-017.Details
suites #104/110/201 & 211-minor demo of non-structural partitions, ramps, millwork & associated electrical, plumbing & ceiling work. demo only per ab-017. | $15,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 901 Market St | Commercial Interior Builders Inc | 5th floor - demo of select partitions to join two existing suites & construction of three new offices. elec, mech , life safety & sprinkler modifications under separte permitDetails
5th floor - demo of select partitions to join two existing suites & construction of three new offices. elec, mech , life safety & sprinkler modifications under separte permit | $100,000 |
| Jul 9, 2012 | Completed final sign-off Jan 2013 | 2800 Leavenworth St | Richlen Construction | 3rd floor - new restrooms, demised suites, new hallway to existing elevator, mech & elec under separate permit, demo under permit pa #2012.0625.3359.Details
3rd floor - new restrooms, demised suites, new hallway to existing elevator, mech & elec under separate permit, demo under permit pa #2012.0625.3359. | $163,000 |
| Jun 27, 2012 | Completed final sign-off Oct 2012 | 343 Sansome St | Field Construction Inc. | ti on existing multi tenant floor. demo partitions, doors, millwork, finishes, power data, plumbing. construction of new partition, doors, power data and finishes. mep and life safety under separate permitDetails
ti on existing multi tenant floor. demo partitions, doors, millwork, finishes, power data, plumbing. construction of new partition, doors, power data and finishes. mep and life safety under separate permit | $300,000 |
| Jun 27, 2012 | Completed final sign-off Nov 2012 | 33 New Montgomery St | R.M.R. Construction Company | 12th floor: ti demolition and construction of new paritions, millwork, and finishes. mep life safety under separate permitDetails
12th floor: ti demolition and construction of new paritions, millwork, and finishes. mep life safety under separate permit | $80,000 |
| Jun 27, 2012 | Expired or cancelled cancelled Apr 2013 | 699 08th St | Novo Construction Inc | ti 6th fl southeast consists of minor demolition of new non load bearing walls, doors, frames, light fixutres and finishes. mep. lifesafety under seperate permit.Details
ti 6th fl southeast consists of minor demolition of new non load bearing walls, doors, frames, light fixutres and finishes. mep. lifesafety under seperate permit. | $200,000 |
| Jun 26, 2012 | Completed final sign-off Oct 2012 | 250 Montgomery St | Peacock Construction Inc | 12th floor #1200 - demolition of (1) partition & associated power/data, finishes throughout. mep & sprinkler system under separate permit.Details
12th floor #1200 - demolition of (1) partition & associated power/data, finishes throughout. mep & sprinkler system under separate permit. | $30,000 |
| Jun 15, 2012 | Completed final sign-off Jun 2013 | 110 Sutter St | Bevilacqua & Sons | 1st floor - relocation of power & data, new barber station with sink, new dressing room with partial height wall & new finishes. mep, sprinklers & life safety under separate permit.Details
1st floor - relocation of power & data, new barber station with sink, new dressing room with partial height wall & new finishes. mep, sprinklers & life safety under separate permit. | $50,000 |