Block 6552, lot 013
3936 26th St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 3
- Units
- 4
- Rooms
- 10 bedrooms, 7 bathrooms
- Building
- 6,124 sq ft
- Lot
- 3,227 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2019 | Never finaled issued Sep 2019, no final | 3936 26th St | street spaceDetails
street space | ||
| May 7, 2019 | Never finaled issued May 2019, no final | 3936 26th St | street spaceDetails
street space | ||
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 3936 26th St | street spaceDetails
street space | ||
| Feb 28, 2019 | Completed final sign-off Nov 2019 | 3936 26th St | Metro General Construction Inc | revision to pa 2015-0508-5826 - level 1 - add washer/dryer under stair 2/hr enclosure; level 2 - reconfigure bathroom layout & window config @ window type/lightwell/change non conforming bedrm to office; level 3 - add stackable washer/dyer, add powder rom w/window type roof/skylightsDetails
revision to pa 2015-0508-5826 - level 1 - add washer/dryer under stair 2/hr enclosure; level 2 - reconfigure bathroom layout & window config @ window type/lightwell/change non conforming bedrm to office; level 3 - add stackable washer/dyer, add powder rom w/window type roof/skylights | $10,000 |
| Feb 15, 2019 | Never finaled issued Feb 2019, no final | 3936 26th St | street spaceDetails
street space | ||
| Jan 7, 2019 | Never finaled issued Jan 2019, no final | 3936 26th St | street spaceDetails
street space | ||
| Dec 5, 2018 | Never finaled issued Dec 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Oct 30, 2018 | Never finaled issued Oct 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Oct 23, 2018 | Completed final sign-off Oct 2019 | 3936 26th St | Crime Watch Security Sys Llc | installation of new sprinkler monitoring system. ref 201505085826, ref 201803193978Details
installation of new sprinkler monitoring system. ref 201505085826, ref 201803193978 | $5,000 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Aug 13, 2018 | Completed final sign-off Nov 2019 | 3936 26th St | Metro General Construction Inc | revision to app#20150585826. comply with nov#201831241. replace dryrot at rear, frame to code as neccessary for safty reason. per 1 hr assembly to not exceed existing envelope.Details
revision to app#20150585826. comply with nov#201831241. replace dryrot at rear, frame to code as neccessary for safty reason. per 1 hr assembly to not exceed existing envelope. | $10,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2019 | 3936 26th St | Metro General Construction Inc | revision to 201505085876, to comply with complaint #201853788. comply w/planning enforcement # 2018-000786enf. revision to correct existing roof conditions and reduce roof deck sq ft. railing to be reduced from roof edge.Details
revision to 201505085876, to comply with complaint #201853788. comply w/planning enforcement # 2018-000786enf. revision to correct existing roof conditions and reduce roof deck sq ft. railing to be reduced from roof edge. | |
| Jul 16, 2018 | Never finaled issued Jul 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| May 7, 2018 | Never finaled issued May 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Apr 5, 2018 | Never finaled issued Apr 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Mar 19, 2018 | Completed final sign-off Oct 2019 | 3936 26th St | All Star Fire Protection Llc | install new fire sprinkler system nfpa 13 throughout building including new 2" underground service. ref pa 2015-0508-5826Details
install new fire sprinkler system nfpa 13 throughout building including new 2" underground service. ref pa 2015-0508-5826 | $7,500 |
| Mar 7, 2018 | Never finaled issued Mar 2018, no final | 3936 26th St | street space permit - renewal of permit #m885348Details
street space permit - renewal of permit #m885348 | ||
| Feb 5, 2018 | Never finaled issued Feb 2018, no final | 3936 26th St | street spaceDetails
street space | ||
| Jan 4, 2018 | Completed final sign-off Nov 2019 | 3936 26th St | Metro General Construction | reduce scope of work on foundation, east side - revision to 201505085826Details
reduce scope of work on foundation, east side - revision to 201505085826 | |
| Jan 2, 2018 | Never finaled issued Jan 2018, no final | 3936 26th St | streetspaceDetails
streetspace | ||
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 3936 26th St | street space permitDetails
street space permit | ||
| Oct 25, 2017 | Never finaled issued Oct 2017, no final | 3936 26th St | street spaceDetails
street space | ||
| Sep 29, 2017 | Expired or cancelled withdrawn Aug 2018 | 3936 26th St | revision to pa #201505085826. modify bathroom plans to include new half bath & window, & modify closet at level 3. and modify footings and walls.Details
revision to pa #201505085826. modify bathroom plans to include new half bath & window, & modify closet at level 3. and modify footings and walls. | $12,000 | |
| Aug 31, 2017 | Completed final sign-off Nov 2019 | 3936 26th St | Metro General Construction | facade restoration - revision to pa 2015-0508-5826 to remove asbestos siding and restore wood siding from original design to clear planning enforcement violation 2017009915enf and 201797171 no structural work. no new fenestration, no change in envelope.Details
facade restoration - revision to pa 2015-0508-5826 to remove asbestos siding and restore wood siding from original design to clear planning enforcement violation 2017009915enf and 201797171 no structural work. no new fenestration, no change in envelope. | $100,000 |
| May 8, 2015 | Completed final sign-off Nov 2019 | 3936 26th St | Foley Construction | interior remodel to all floors and all units - minimal changes to elevations. addition of roof deck. no changes to front facade.Details
interior remodel to all floors and all units - minimal changes to elevations. addition of roof deck. no changes to front facade. | $200,000 |