Metro General Construction Inc
- Based in
- Novato
- On San Francisco permits
- Mar 2016 to Mar 2023
- Last 24 months
- 0 permits filed
44 permits since 2000: 25 completed, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 8 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2023 | Expired or cancelled cancelled Jan 2026 | 1468 Clay St | two kitchen remodels: remove & replace in-kind kitchen cabinets, countertop, and fixtures & flooring in both units. some new applicances.Details
two kitchen remodels: remove & replace in-kind kitchen cabinets, countertop, and fixtures & flooring in both units. some new applicances. | $50,000 |
| Mar 16, 2023 | Expired or cancelled cancelled Jan 2026 | 1468 Clay St | to obtain final inspection for work approved under pa# 2019-0612-3224Details
to obtain final inspection for work approved under pa# 2019-0612-3224 | |
| Mar 1, 2023 | Expired or cancelled expired Jan 2026 | 133 Vicksburg St | revision to 202205315315. bathroom configuration change. structural revision to steel beam location.Details
revision to 202205315315. bathroom configuration change. structural revision to steel beam location. | |
| Jan 5, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #1: remodel kitchen and bathroom. all work to be remove and replace in kind.Details
unit #1: remodel kitchen and bathroom. all work to be remove and replace in kind. | $15,000 |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #j: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind.Details
unit #j: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind. | $45,000 |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #6: remodel of unit to include kitchen and bathroom. no windows to be replaced.Details
unit #6: remodel of unit to include kitchen and bathroom. no windows to be replaced. | $45,000 |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #2: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind.Details
unit #2: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind. | $45,000 |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #3: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind.Details
unit #3: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind. | $45,000 |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #5: remodel of unit to include kitchen and bathroom. all work is remove and replace in kind.Details
unit #5: remodel of unit to include kitchen and bathroom. all work is remove and replace in kind. | $40,000 |
| Jan 3, 2023 | Never finaled issued Jan 2023, no final | 242 Divisadero St | unit #4: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind.Details
unit #4: remodel of unit to include kitchen and bathroom. all work to be remove and replace in kind. | $45,000 |
| Aug 25, 2022 | Completed final sign-off Mar 2023 | 535 Taylor St | apt 601: interior renovation: convert (e) living room into one bedroom, remodel kitchen. replace shower. total of 2 bedrooms.Details
apt 601: interior renovation: convert (e) living room into one bedroom, remodel kitchen. replace shower. total of 2 bedrooms. | $45,000 |
| Jul 18, 2022 | Completed final sign-off Jul 2022 | 778 41st Av | to comply with nov#202064531 item #102: in kind replacement of siding between properties.Details
to comply with nov#202064531 item #102: in kind replacement of siding between properties. | $500 |
| Jul 13, 2022 | Completed final sign-off Mar 2023 | 535 Taylor St | unit # 507: reconfigure interior layout with 1 bedroom, 1 -bath, kitchen, and living rmDetails
unit # 507: reconfigure interior layout with 1 bedroom, 1 -bath, kitchen, and living rm | $40,000 |
| May 31, 2022 | Expired or cancelled expired Jan 2026 | 133 Vicksburg St | (n) 706 sf rooms down additio. (n) interior stairs from second floor to room-down. all new windows and ext door on lower floor change direction of rear deck stairs.Details
(n) 706 sf rooms down additio. (n) interior stairs from second floor to room-down. all new windows and ext door on lower floor change direction of rear deck stairs. | $260,000 |
| May 11, 2022 | Completed final sign-off Jul 2022 | 191 Henry St | unit #a: remodel one kitchen: remove and replace in kind kitchen cabinets. apply new paint to walls. remodel one bathroom in kind. install new lvt flooring over existing flooring.Details
unit #a: remodel one kitchen: remove and replace in kind kitchen cabinets. apply new paint to walls. remodel one bathroom in kind. install new lvt flooring over existing flooring. | $20,000 |
| Apr 21, 2022 | Completed final sign-off Nov 2022 | 140 Duboce Av | revision to pa# 201809140223. revise shear wall location along grid c. add grade beam along grid 3.75. revise shear wall length along grid a.Details
revision to pa# 201809140223. revise shear wall location along grid c. add grade beam along grid 3.75. revise shear wall length along grid a. | $2,000 |
| Feb 25, 2021 | Never finaled issued Jun 2021, no final | 486 Funston Av | revision to pa# 201907246824. reconfigure kitchen layout in unit 001 & 002. change patio door style at bedroom in unit 002. add windows at bedroom & living room in unit 003.Details
revision to pa# 201907246824. reconfigure kitchen layout in unit 001 & 002. change patio door style at bedroom in unit 002. add windows at bedroom & living room in unit 003. | $25,000 |
| Jan 29, 2021 | Expired or cancelled cancelled Jan 2026 | 1700 Page St | mandatory soft story retrofit per sfebc chapter 4d.Details
mandatory soft story retrofit per sfebc chapter 4d. | $120,000 |
| Aug 15, 2020 | Never finaled issued Jun 2021, no final | 1064 Dolores St | revision to bpa #201612225670.work includes kitchen layout change, additional storage & security closets in garage, fenced in patio area for two adu's.Details
revision to bpa #201612225670.work includes kitchen layout change, additional storage & security closets in garage, fenced in patio area for two adu's. | $5,000 |
| Mar 11, 2020 | Completed final sign-off Dec 2023 | 140 Duboce Av | convert (e) 2 car garage into (4) adu's per ordiance 162-16. for a building total of 19 units.Details
convert (e) 2 car garage into (4) adu's per ordiance 162-16. for a building total of 19 units. | $200,000 |
| Jan 30, 2020 | Completed final sign-off Jul 2020 | 2070 Fell St | unit #7: remodel kitchen and bathroom in kind. upgrade electrical throughout apartment to be code compliant. no movement of walls. no change to egress. no work in common area. no work on fire alarm or sprinklers.Details
unit #7: remodel kitchen and bathroom in kind. upgrade electrical throughout apartment to be code compliant. no movement of walls. no change to egress. no work in common area. no work on fire alarm or sprinklers. | $36,000 |
| Jan 28, 2020 | Never finaled issued Jan 2020, no final | 4740 Balboa St | unit 503 - revision to pa #201912109137, remove partial walls non-load bearing close existing openings & relocate. expand kitchen into closet. no structural workDetails
unit 503 - revision to pa #201912109137, remove partial walls non-load bearing close existing openings & relocate. expand kitchen into closet. no structural work | |
| Jan 9, 2020 | Completed final sign-off Aug 2021 | 1424 Valencia St | new slab on grade, new raised floor framing, new footing, new headers to accomodate addition of adus at gr lvel. arch plans under sep 201809261485Details
new slab on grade, new raised floor framing, new footing, new headers to accomodate addition of adus at gr lvel. arch plans under sep 201809261485 | $20,000 |
| Dec 10, 2019 | Completed final sign-off Mar 2020 | 4740 Balboa St | unit 503 to include kitchen bathroom and living space no movement of interior walls new dry wall adding insulation new flooring cabinets tile replace in kind tub toilet and vanity. no wall layout change. w/ cec150(k) 3 and cec 150(k) 5 remodel in kind.Details
unit 503 to include kitchen bathroom and living space no movement of interior walls new dry wall adding insulation new flooring cabinets tile replace in kind tub toilet and vanity. no wall layout change. w/ cec150(k) 3 and cec 150(k) 5 remodel in kind. | $49,000 |
| Dec 10, 2019 | Never finaled issued Dec 2019, no final | 4740 Balboa St | unit 402 remodel interior to include kitchen and bath, living space, no movement of interor walls dry wall patching and insulation new flooring cabinets tile replace in kind toilet tub and vanity. remodel in kind. no wall layout change. comply w/ cec 150(k)3 and cec 150(k)5Details
unit 402 remodel interior to include kitchen and bath, living space, no movement of interor walls dry wall patching and insulation new flooring cabinets tile replace in kind toilet tub and vanity. remodel in kind. no wall layout change. comply w/ cec 150(k)3 and cec 150(k)5 | $49,000 |
| Sep 3, 2019 | Completed final sign-off Nov 2019 | 4740 Balboa St | unit 302: not residential guest room. remodel bathroom, kitchen & living space. no wall removal, finishes only.Details
unit 302: not residential guest room. remodel bathroom, kitchen & living space. no wall removal, finishes only. | $50,000 |
| Aug 16, 2019 | Completed final sign-off Nov 2019 | 4740 Balboa St | remove and replace in kind (high quality wood grain simulated hardee plank siding) exterior siding on entire west elevation of building (side elevation, visible from street)Details
remove and replace in kind (high quality wood grain simulated hardee plank siding) exterior siding on entire west elevation of building (side elevation, visible from street) | $100,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2021 | 486 Funston Av | convert(1)(e)garage/storage 1st fl to(3)dwelling units. unit #001:(1)kitchen,(1)3-fixture bath,(1)office, living rm, sleeping area. unit #002:(1)kitchen,(1)3-fixture bath,(1)office, living/dining,(2)bed. unit #003:(1)kitchen,(1)3-fixture bath,(1)office, living/dining,(1)bed. covert storage to laundrDetails
convert(1)(e)garage/storage 1st fl to(3)dwelling units. unit #001:(1)kitchen,(1)3-fixture bath,(1)office, living rm, sleeping area. unit #002:(1)kitchen,(1)3-fixture bath,(1)office, living/dining,(2)bed. unit #003:(1)kitchen,(1)3-fixture bath,(1)office, living/dining,(1)bed. covert storage to laundr | $200,000 |
| Jun 12, 2019 | Never finaled issued Jul 2019, no final | 1468 Clay St | remodel 2 (e) baths, add 2 (n) baths, remove door between units and infill w/ wall.Details
remodel 2 (e) baths, add 2 (n) baths, remove door between units and infill w/ wall. | $45,000 |
| Mar 12, 2019 | Completed final sign-off Aug 2021 | 1424 Valencia St | rev to pa# 201709127727; revise shear wall length, holdown size footing along lengh grid d 3.5Details
rev to pa# 201709127727; revise shear wall length, holdown size footing along lengh grid d 3.5 | |
| Feb 28, 2019 | Completed final sign-off Nov 2019 | 3936 26th St | revision to pa 2015-0508-5826 - level 1 - add washer/dryer under stair 2/hr enclosure; level 2 - reconfigure bathroom layout & window config @ window type/lightwell/change non conforming bedrm to office; level 3 - add stackable washer/dyer, add powder rom w/window type roof/skylightsDetails
revision to pa 2015-0508-5826 - level 1 - add washer/dryer under stair 2/hr enclosure; level 2 - reconfigure bathroom layout & window config @ window type/lightwell/change non conforming bedrm to office; level 3 - add stackable washer/dyer, add powder rom w/window type roof/skylights | $10,000 |
| Oct 22, 2018 | Completed final sign-off Apr 2019 | 184 Valley St | recommencement and completion of work approved under pa# 201603162267Details
recommencement and completion of work approved under pa# 201603162267 | |
| Oct 22, 2018 | Completed final sign-off Nov 2018 | 186 Valley St | recommencement and completion of work approved under pa# 201708286150Details
recommencement and completion of work approved under pa# 201708286150 | |
| Sep 26, 2018 | Completed final sign-off Aug 2021 | 1424 Valencia St | add units per ordinance# 162-16. convert 3 parking spaces into 3 new accessory dwelling units (1 bedroom & 1 bath layout for all new units. structural deferred under separate permit: no cfc.Details
add units per ordinance# 162-16. convert 3 parking spaces into 3 new accessory dwelling units (1 bedroom & 1 bath layout for all new units. structural deferred under separate permit: no cfc. | $80,000 |
| Sep 14, 2018 | Completed final sign-off Nov 2022 | 140 Duboce Av | soft story retrofit using iebc a4Details
soft story retrofit using iebc a4 | $85,000 |
| Aug 13, 2018 | Completed final sign-off Nov 2019 | 3936 26th St | revision to app#20150585826. comply with nov#201831241. replace dryrot at rear, frame to code as neccessary for safty reason. per 1 hr assembly to not exceed existing envelope.Details
revision to app#20150585826. comply with nov#201831241. replace dryrot at rear, frame to code as neccessary for safty reason. per 1 hr assembly to not exceed existing envelope. | $10,000 |
| Aug 7, 2018 | Completed final sign-off Nov 2019 | 3936 26th St | revision to 201505085876, to comply with complaint #201853788. comply w/planning enforcement # 2018-000786enf. revision to correct existing roof conditions and reduce roof deck sq ft. railing to be reduced from roof edge.Details
revision to 201505085876, to comply with complaint #201853788. comply w/planning enforcement # 2018-000786enf. revision to correct existing roof conditions and reduce roof deck sq ft. railing to be reduced from roof edge. | |
| Apr 18, 2018 | Completed final sign-off Apr 2019 | 184 Valley St | revised floor plan to permit app#201603162267 to relocate bathroom and electrical meters. add new study.Details
revised floor plan to permit app#201603162267 to relocate bathroom and electrical meters. add new study. | |
| Apr 6, 2018 | Completed final sign-off Aug 2018 | 186 Valley St | replace (e) concrete slab, including excavation and walk way (partial)Details
replace (e) concrete slab, including excavation and walk way (partial) | $10,000 |
| Sep 15, 2017 | Never finaled issued Jan 2022, no final | 1860 Turk St | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. comply with nov #201990442Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. comply with nov #201990442 | $75,000 |
| Sep 12, 2017 | Completed final sign-off Aug 2021 | 1424 Valencia St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $60,000 |
| Aug 28, 2017 | Expired or cancelled expired Nov 2018 | 186 Valley St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. adu per #201603162267Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. adu per #201603162267 | $40,000 |
| Dec 22, 2016 | Completed final sign-off Dec 2021 | 1064 Dolores St | addition of (2) dwelling units within the (e) building envelope per ordinance# 162-16. single exit. sprinklers required per 13r for units, fire alarm to meet sffc 1103.7.6.1 under separate permitDetails
addition of (2) dwelling units within the (e) building envelope per ordinance# 162-16. single exit. sprinklers required per 13r for units, fire alarm to meet sffc 1103.7.6.1 under separate permit | $429,034 |
| Mar 16, 2016 | Completed final sign-off Apr 2019 | 186 Valley St | create new dwelling unit per ordinance 161-15.Details
create new dwelling unit per ordinance 161-15. | $50,000 |