Allen Nudel
- License
- 4508
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- architect, engineer
- Firm
- Forell / Elsesser Engineers
- Based in
- San Francisco
- On San Francisco permits
- Feb 2015 to Mar 2016
2 permits since 2000 (architect on 1 permit, engineer on 1 permit): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Cahill Contractors Llc., Cannon Constructors North Inc, Dpr Construction
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 15, 2016 | Completed final sign-off Feb 2021 | 302 Silver Av | Cahill Contractors Llc., Cannon Constructors North Inc | to erect 5 stories, 2 basement, residential care for the elderly building.Details
to erect 5 stories, 2 basement, residential care for the elderly building. | $67,000,000 |
| Feb 3, 2015 | Never finaled issued Mar 2015, no final | 1275 Market St | Dpr Construction | voluntary below grade strenghthening: strenthen extg columns and floor framing for future theater bldg addition. this work affects levels b3,b2, and 1Details
voluntary below grade strenghthening: strenthen extg columns and floor framing for future theater bldg addition. this work affects levels b3,b2, and 1 | $275,000 |