Westport Construction
- Based in
- Lagunitas
- On San Francisco permits
- Aug 2011 to Oct 2025
- Last 24 months
- 4 permits filed
20 permits since 2000: 12 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2025 | In progress issued Jan 2026 | 231 West Portal Av | no-plans, non-structural demolition of a vacant tenant space per ab-017. reference p/a 2025-1017-7580 for similar p/a in another tenant space in the building.Details
no-plans, non-structural demolition of a vacant tenant space per ab-017. reference p/a 2025-1017-7580 for similar p/a in another tenant space in the building. | |
| Sep 11, 2025 | In progress issued Sep 2025 | 231 West Portal Av | demo existing non-structural partitions and non-structural ceiling joists. ab-17Details
demo existing non-structural partitions and non-structural ceiling joists. ab-17 | $20,000 |
| Jul 9, 2025 | In progress issued Jul 2025 | 2105 Buchanan St | kitchen remodel with layout changes, master bathroom remodel with fixture reocation, master bathroom-new electric floor heating system. main bathroom remodel, new laundry closet, new subpanel, replace existing fas fireplace with new gas fireplace insertDetails
kitchen remodel with layout changes, master bathroom remodel with fixture reocation, master bathroom-new electric floor heating system. main bathroom remodel, new laundry closet, new subpanel, replace existing fas fireplace with new gas fireplace insert | $220,000 |
| Dec 3, 2024 | Completed final sign-off Dec 2025 | 3927 Moraga St | interior stair reconfiguration on single family dwelling. convert e family room to bedroom 1st fl. add foyer at 1st fl no windows or facade changesDetails
interior stair reconfiguration on single family dwelling. convert e family room to bedroom 1st fl. add foyer at 1st fl no windows or facade changes | $40,000 |
| Jan 25, 2024 | Completed final sign-off Jun 2024 | 4042 24th St | deferred electrical and lighting permit for restaurant remodel associated with ti permit# 202310319898 (ref permit)Details
deferred electrical and lighting permit for restaurant remodel associated with ti permit# 202310319898 (ref permit) | $10,000 |
| Oct 31, 2023 | Completed final sign-off Jun 2024 | 4042 24th St | new operator taking over existing restaurant work to include: remodel kitchen & dining area; new type 1 hood/hotline, new pizza oven. no alteration to (e) egress; entry path of travel; ada unise bathrooms contracted under pa 2010-0915-0928Details
new operator taking over existing restaurant work to include: remodel kitchen & dining area; new type 1 hood/hotline, new pizza oven. no alteration to (e) egress; entry path of travel; ada unise bathrooms contracted under pa 2010-0915-0928 | $340,000 |
| Sep 29, 2023 | In progress issued Aug 2024 | 5901 Geary Bl | prop h: tenant improvement of 1942 sf to combine two tenant spaces (5901 and 5909 geary) for new bakery. change of occupancy from a-2 restaurant to b occupancy bakery no change to the other occupant spaces of bldg.Details
prop h: tenant improvement of 1942 sf to combine two tenant spaces (5901 and 5909 geary) for new bakery. change of occupancy from a-2 restaurant to b occupancy bakery no change to the other occupant spaces of bldg. | $350,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 490 Post St | 12/f suite 1230: tenant improvement. remodeling consists of an ada toilet, new conference room and storage, new treatment room. no exterior work to be done.Details
12/f suite 1230: tenant improvement. remodeling consists of an ada toilet, new conference room and storage, new treatment room. no exterior work to be done. | $20,000 |
| Jan 26, 2023 | Completed final sign-off Jun 2023 | 2845 18th St | bar/prep kitchen, moving electrical, adding fixtures/outlets, additional plumbing, adding hvacDetails
bar/prep kitchen, moving electrical, adding fixtures/outlets, additional plumbing, adding hvac | $150,000 |
| Dec 28, 2022 | Expired or cancelled cancelled Jan 2026 | 1318 18th St | install ada compliant electric door opener on 3/0 entry door abe 201901094125Details
install ada compliant electric door opener on 3/0 entry door abe 201901094125 | $4,800 |
| Oct 25, 2022 | Never finaled issued Nov 2022, no final | 490 Post St | interior soft demo of interiorDetails
interior soft demo of interior | $64,320 |
| Aug 17, 2022 | Completed final sign-off Oct 2022 | 70 Skyview Wy | replace 8 windows in kind 4 at front, 1 on side, 2 on rear, 1 on other sideDetails
replace 8 windows in kind 4 at front, 1 on side, 2 on rear, 1 on other side | $4,000 |
| Mar 31, 2021 | Completed final sign-off Sep 2021 | 229 Ellis St | evacuation signage permit submission.Details
evacuation signage permit submission. | $3,600 |
| Feb 19, 2020 | Completed final sign-off Sep 2021 | 229 Ellis St | revision to 201804277608: changes to basement floor room layout to accomodate new fire pump room and relocate elec room.Details
revision to 201804277608: changes to basement floor room layout to accomodate new fire pump room and relocate elec room. | $8,200 |
| Jan 17, 2020 | Never finaled issued Jan 2020, no final | 229 Ellis St | street spaceDetails
street space | |
| Mar 20, 2019 | Completed final sign-off Sep 2021 | 229 Ellis St | revision to app#201804277608. addition of blocking rated partition head details for ease of constuction.Details
revision to app#201804277608. addition of blocking rated partition head details for ease of constuction. | |
| May 4, 2018 | Expired or cancelled expired Nov 2025 | 229 Ellis St | fifty five group housing rooms are proposed along with the addition of a new 5th floor.Details
fifty five group housing rooms are proposed along with the addition of a new 5th floor. | $3,000,000 |
| May 8, 2017 | Completed final sign-off Sep 2021 | 229 Ellis St | structural only demo & seismic upgrade project in an (e) unoccupied residential bldgDetails
structural only demo & seismic upgrade project in an (e) unoccupied residential bldg | $1,300,000 |
| Feb 9, 2017 | Completed final sign-off Oct 2021 | 229 Ellis St | demo of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017.Details
demo of interior non load bearing partitions, plumbing, finishes, lighting and non structural components. ab-017. | $20,000 |
| Aug 9, 2011 | Completed final sign-off Oct 2012 | 203 Fairmount St | new deck at second floor at rear of property not within req'd rear yardDetails
new deck at second floor at rear of property not within req'd rear yard | $9,000 |