Back to bathroom remodel contractors
Westport Construction
- Based in
- Lagunitas
- On San Francisco permits
- Aug 2011 to Oct 2025
- Last 24 months
- 4 permits filed
20 permits since 2000: 12 completed, 4 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 in progress. Typically 33 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2025 | In progress issued Jul 2025 | 2105 Buchanan St | kitchen remodel with layout changes, master bathroom remodel with fixture reocation, master bathroom-new electric floor heating system. main bathroom remodel, new laundry closet, new subpanel, replace existing fas fireplace with new gas fireplace insertDetails
kitchen remodel with layout changes, master bathroom remodel with fixture reocation, master bathroom-new electric floor heating system. main bathroom remodel, new laundry closet, new subpanel, replace existing fas fireplace with new gas fireplace insert | $220,000 |
| Oct 31, 2023 | Completed final sign-off Jun 2024 | 4042 24th St | new operator taking over existing restaurant work to include: remodel kitchen & dining area; new type 1 hood/hotline, new pizza oven. no alteration to (e) egress; entry path of travel; ada unise bathrooms contracted under pa 2010-0915-0928Details
new operator taking over existing restaurant work to include: remodel kitchen & dining area; new type 1 hood/hotline, new pizza oven. no alteration to (e) egress; entry path of travel; ada unise bathrooms contracted under pa 2010-0915-0928 | $340,000 |