Jeffrey Ouellette
- License
- M32564
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M32564 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Jul 2019 to Aug 2026
11 permits since 2000 (engineer on 11 permits): 3 completed, 7 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Sc Builders, Inc (3), Build Group Inc., Cw Horton General Contractor, Rossi Builders Inc., Webcor Construction Lp
- Architects
- Adam Murphy (2), Michael Zelazek (2), Glen G Res, Jeffery Kovel, John Minogue, Mario Russo, Mark Cavagnero, Mark Melzer, Matthew Bens, Michelle Loeb, Paul Erikferro
- Engineers
- Benjamin Noggle (3), James Bradshaw (2), Sidhu Harjot Singh (2), Taylor Berrian (2), Andrew Hefner, Brian Cauley, Debbie Grieves, Grant Craig, Gregory Bucher, Jason Jones, Jason Ling, Jeff Brink, Joseph Mccue, Moana E Reynau, Paul Littler, Stephen Scaife, Timothy Quiring, Tyler C. Kehret
- Authorized agents
- Lawrence Smith, Simon Bowden
- Subcontractors
- Richard Pulver
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Oct 2026 | 181 Fremont St | Sc Builders, Inc | 8/fl-interior soft demo of non-bearing walls, addition of non-bearing partitions. new mechanical, electrical and new equipment.Details
8/fl-interior soft demo of non-bearing walls, addition of non-bearing partitions. new mechanical, electrical and new equipment. | $1,000,000 |
| Aug 12, 2026 | In progress issued Aug 2026 | 555 California St | Sc Builders, Inc | 17th fl tenant improvment for new demising wall to create 2 suites.Details
17th fl tenant improvment for new demising wall to create 2 suites. | $810,960 |
| Jun 24, 2026 | In progress filed Jun 2026, not yet issued | 555 Market St | 6th fl - ti of existing cafe servery to upgrade kitchen equipment and finishes w/new ceiling soffit, new serving counter.Details
6th fl - ti of existing cafe servery to upgrade kitchen equipment and finishes w/new ceiling soffit, new serving counter. | $160,000 | |
| Apr 30, 2026 | In progress issued May 2026 | 181 Fremont St | Sc Builders, Inc | parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors,new equipments,overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishesDetails
parcel b. level 12: interior only. scop includes demolition of select light fixtures, non-structural walls, mechanical ducts and equipment. addition of new non structural walls/partitions, doors,new equipments,overlead mechanical and electrical, new pantry cabinets, equipment and millwork/finishes | $3,000,000 |
| Apr 6, 2026 | Completed final sign-off Oct 2026 | 555 California St | Rossi Builders Inc. | ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.Details
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power. | $408,300 |
| Jan 15, 2026 | In progress filed Jan 2026, not yet issued | 1241 Delaware St | mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine.Details
mayor dir ed13-01: admin bldg- lvl 1- prequel park- potrero power station dev-cold shell remodel for future cafe or restaurant, new elevator, restrooms and mep area. storefront work-partial demo of exterior facade to be replace w/new storefront systems and sectional doors. partial demo of mezzanine. | $1,500,000 | |
| Feb 11, 2025 | In progress issued Nov 2025 | 1687 Market St | Build Group Inc. | mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces.Details
mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces. | $70,205,789 |
| Nov 21, 2023 | Expired or cancelled withdrawn Apr 2026 | 600 Stockton St | minor interior remodel of (e) restaurant (3528 sf) and lobby lounge (1757 sf) including hvac, plumbing, electrical.Details
minor interior remodel of (e) restaurant (3528 sf) and lobby lounge (1757 sf) including hvac, plumbing, electrical. | $900,000 | |
| Aug 15, 2023 | Completed final sign-off Mar 2025 | 300 Kansas St | Webcor Construction Lp | revision to 201812269158 addendum 7_rev3. to incorporate the following changes updated plumbing drawings to match the installed and approved fuel oil drawings. fuel oil riser to be installed at grid lines 2.1/f.Details
revision to 201812269158 addendum 7_rev3. to incorporate the following changes updated plumbing drawings to match the installed and approved fuel oil drawings. fuel oil riser to be installed at grid lines 2.1/f. | |
| Sep 27, 2022 | In progress issued Aug 2026 | 630 Octavia St | erect a type 1-a, 8-story over one basement mixed use building with 40 residential unit, retail and parking spaces.Details
erect a type 1-a, 8-story over one basement mixed use building with 40 residential unit, retail and parking spaces. | $13,500,000 | |
| Jul 9, 2019 | Completed final sign-off Oct 2021 | 181 03rd St | Cw Horton General Contractor | demo of (e) spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades.Details
demo of (e) spa & convert to guestrooms & small office use. renovation of guestrooms, corridors & elevator lobbies for 4th fl includes non-structural upgrade to interior partitions & fee upgrades. | $615,132 |