Erica Ross
- License
- M36527
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M36527 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Pae
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Aug 2023
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Anderson Eric F Inc, Novo Construction Inc
- Architects
- Christen Soares, Larry J Smith
- Engineers
- Benjamin Noggle, Debbie Greieves, Grant Craig, Kevin Treat, Sam Cantrell
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2023 | Completed final sign-off Mar 2024 | 555 California St | Novo Construction Inc | 49th fl consists of demolition of (e) non-structural partitions, doors, finishes, ceiling grid & tiles, lighting and power. construction of new non-structural partitions, glazing, doors, ceilings, lighting, finishes and power.Details
49th fl consists of demolition of (e) non-structural partitions, doors, finishes, ceiling grid & tiles, lighting and power. construction of new non-structural partitions, glazing, doors, ceilings, lighting, finishes and power. | $936,556 |
| Jul 20, 2020 | Completed final sign-off Apr 2022 | 1185 Market St | Eric F Anderson Incorporated | first time tenant improvement for a new whole foods to occupy existing shell space. walls, fixtures, mech, elec, plumbing, lighting, structural, refrigeration - reach-ins & walk-ins, restrooms, equipment support platforms, concrete topping slab.Details
first time tenant improvement for a new whole foods to occupy existing shell space. walls, fixtures, mech, elec, plumbing, lighting, structural, refrigeration - reach-ins & walk-ins, restrooms, equipment support platforms, concrete topping slab. | $12,000,000 |