Marc Andrew Steyer
- License
- S6022
- Structural engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up S6022 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Tipping Structural Engineers
- Based in
- Berkeley
- On San Francisco permits
- Aug 2016 to Oct 2026
42 permits since 2000 (engineer on 42 permits): 28 completed, 11 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Principal Builders Inc. (8), Bcci Construction Company (5), Field Construction Inc. (3), Gci, Inc (3), Plant Construction Co, Lp (3), Bai Construction (2), C & J Contracting Inc (2), D & H Construction (2), Skyline Construction (2), Young & Burton Inc (2), Alvarado & Son Construction Inc, B-Side Inc., Gil Construction & Assoc Inc., H C L Construction Inc., Hillhouse Construction Company Inc, Junoworks, Novo Construction Inc, Prima Acquire Inc Dba Lahue And Associat, Sevan Multi-Site Solutions Inc
- Architects
- Luda Hoe (6), Christopher Hall (3), Jonas Kellner (3), Adam Murphy (2), Christopher Duncan (2), Michael R. Downey (2), Scott E Clement (2), Seth Hanley (2), Teresa Emery (2), Austin Riley, Brian Collins-Friedrichs, Craig Scott, Jason Sayner, John L Thiele, Kenneth A Lowney, Michael Castro
- Engineers
- Amit Wadhwa (2), Clifford Dias (2), John Griffiths (2), Rey T. Solidum (2), Stephen Shafeer (2), Viktar Kuzmichou (2), Edward Robinson, Levi G. Abarte, Raymond Keane, Rudolfo P Bustos Iii, Susanna M. See, Vanessa Connor, Wayne Gaw
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 28, 2026 | In progress filed Oct 2026, not yet issued | 590 Van Ness Av | g/f ti: halls, restroom, conference rooms, mep included.Details
g/f ti: halls, restroom, conference rooms, mep included. | $1,613,200 | |
| Oct 21, 2026 | In progress issued Nov 2026 | 720 California St | Novo Construction Inc | this project is limited to the slab infill of two communicating stairs between level 1+2 and level 3+4. work includes selective demolition of stairs, railing, and guards and new ceiling, light fixtures, and finishes.Details
this project is limited to the slab infill of two communicating stairs between level 1+2 and level 3+4. work includes selective demolition of stairs, railing, and guards and new ceiling, light fixtures, and finishes. | $330,000 |
| Sep 16, 2026 | In progress issued Oct 2026 | 1455 Market St | Bcci Construction Company | floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electricDetails
floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric | $85,000 |
| Sep 16, 2026 | In progress issued Oct 2026 | 1455 Market St | Bcci Construction Company | floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.Details
floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed. | $225,000 |
| Aug 4, 2026 | In progress issued Sep 2026 | 590 Van Ness Av | Gci, Inc | 1st fl - structural reinforcement of existing floor. new columns and footings on basement levelDetails
1st fl - structural reinforcement of existing floor. new columns and footings on basement level | $181,068 |
| Jul 24, 2026 | In progress issued Sep 2026 | 590 Van Ness Av | Gci, Inc | 2/f: office t.i. including offices, breakroom, confereence rooms. includes mep.Details
2/f: office t.i. including offices, breakroom, confereence rooms. includes mep. | $1,591,400 |
| Feb 23, 2026 | In progress issued Mar 2026 | 201 03rd St | Prima Acquire Inc Dba Lahue And Associat | install a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd streetDetails
install a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd street | $70,000 |
| Dec 22, 2025 | In progress issued Mar 2026 | 555 California St | Bcci Construction Company | l45-46 interconnecting stair. new finishes & banquette platform landingDetails
l45-46 interconnecting stair. new finishes & banquette platform landing | $125,000 |
| Dec 1, 2025 | In progress issued Dec 2025 | 555 California St | Bcci Construction Company | 45th fl - tenant improvement partitions, ceiing & finishesDetails
45th fl - tenant improvement partitions, ceiing & finishes | $5,314,000 |
| Sep 3, 2025 | Completed final sign-off Apr 2026 | 376 Green St | H C L Construction Inc. | replacement of (e) dry-rot wooden rear egress stair in kind per sfbc 1011.12.3 as discussed at july 21, 2024 pre application plan review(option 1)Details
replacement of (e) dry-rot wooden rear egress stair in kind per sfbc 1011.12.3 as discussed at july 21, 2024 pre application plan review(option 1) | $130,000 |
| Jul 29, 2025 | Completed final sign-off Apr 2026 | 300 California St | Gci, Inc | 2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical.Details
2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical. | $800,000 |
| May 16, 2025 | In progress issued Nov 2025 | 2675 Geary Bl | Sevan Multi-Site Solutions Inc | l3- core "n" shell upgrade to vacant space. hvac, electrical, plumbing upgrades. structural strengthening space to remain vacant until future t.i.Details
l3- core "n" shell upgrade to vacant space. hvac, electrical, plumbing upgrades. structural strengthening space to remain vacant until future t.i. | $960,000 |
| May 9, 2025 | In progress issued Aug 2025 | 555 California St | Bcci Construction Company | 52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mepDetails
52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep | $4,360,000 |
| Sep 23, 2024 | Completed final sign-off Feb 2025 | 162 Randall St | Young & Burton Inc | revision to permit 202209122271 to update required special inspections, removing special inspection on 6 and 18 bc as they are not required.Details
revision to permit 202209122271 to update required special inspections, removing special inspection on 6 and 18 bc as they are not required. | |
| Mar 28, 2024 | Completed final sign-off Jan 2025 | 535 Mission St | Skyline Construction | 24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit.Details
24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit. | $1,500,000 |
| Mar 20, 2024 | Completed final sign-off Jan 2025 | 535 Mission St | Skyline Construction | 25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permitDetails
25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permit | $1,500,000 |
| Sep 12, 2023 | Completed final sign-off Oct 2024 | 2300 Harrison St | Field Construction Inc. | roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibilityDetails
roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibility | $600,000 |
| Jun 16, 2023 | Completed final sign-off Dec 2023 | 220 Montgomery St | Principal Builders Inc. | revision to pa# 202212198630, to incoporate the following changes- removal of items from t.i. scope and added to deffered submittals: 6.steel shelving @ axon & media wall, 7.steel framed structure @ reception hut. added typical anchorage details.Details
revision to pa# 202212198630, to incoporate the following changes- removal of items from t.i. scope and added to deffered submittals: 6.steel shelving @ axon & media wall, 7.steel framed structure @ reception hut. added typical anchorage details. | |
| May 15, 2023 | Never finaled issued Aug 2023, no final | 100 Channel | Junoworks | install artwork in front of buildingDetails
install artwork in front of building | $50,000 |
| Dec 20, 2022 | Completed final sign-off Jul 2023 | 220 Montgomery St | Field Construction Inc. | mechanical, new energy recovery ventilator, 1 sound trap, 6 vrv condenser units. new electrical plumbing, new roof receptor for vrv. structural support for hvac equipDetails
mechanical, new energy recovery ventilator, 1 sound trap, 6 vrv condenser units. new electrical plumbing, new roof receptor for vrv. structural support for hvac equip | $700,000 |
| Dec 19, 2022 | Completed final sign-off Jan 2024 | 220 Montgomery St | Principal Builders Inc. | 2nd floor t.i. non structural partitions, structural elements, ceilings, fixtures and finishes. mep deferred.Details
2nd floor t.i. non structural partitions, structural elements, ceilings, fixtures and finishes. mep deferred. | $2,600,000 |
| Oct 27, 2022 | Never finaled issued Nov 2022, no final | 1 Sansome St | Field Construction Inc. | revision to ref#2022-0718-8654. structural revision for operable partition on 15th flr. also known as nana wall support.Details
revision to ref#2022-0718-8654. structural revision for operable partition on 15th flr. also known as nana wall support. | |
| Sep 12, 2022 | Completed final sign-off Feb 2025 | 162 Randall St | Young & Burton Inc | complete remodel of the interiors of an e 3 story wood framed, 2 unit house. replace select exterior windows and doors, removing a balcony at rear of building. all work to be done within the existing boundary of the building.Details
complete remodel of the interiors of an e 3 story wood framed, 2 unit house. replace select exterior windows and doors, removing a balcony at rear of building. all work to be done within the existing boundary of the building. | $1,000,000 |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk.Details
minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk. | $30,000 |
| May 26, 2022 | Completed final sign-off Feb 2023 | 1960 Bryant St | Principal Builders Inc. | change of use from light manufacturing (pdr) to arts activity space. work includes tenant improvement work - walls, partitions, millwork, lighting, mep.Details
change of use from light manufacturing (pdr) to arts activity space. work includes tenant improvement work - walls, partitions, millwork, lighting, mep. | $465,000 |
| Apr 27, 2022 | Completed final sign-off Jan 2023 | 1960 Bryant St | Principal Builders Inc. | 1/f: partial demo of common interior walls as well as a connection between buildings at 575 florida st & 1960 bryant st. roll-up fire door on 1960 side. no egress through this connection.Details
1/f: partial demo of common interior walls as well as a connection between buildings at 575 florida st & 1960 bryant st. roll-up fire door on 1960 side. no egress through this connection. | $5,000 |
| Dec 22, 2021 | Completed final sign-off Nov 2022 | 226 Santa Rosa Av | Gil Construction & Assoc Inc. | to comply with nov 202044851 - replace exterior damaged stair in kindDetails
to comply with nov 202044851 - replace exterior damaged stair in kind | $5,000 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams alongDetails
revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along | |
| Oct 5, 2021 | Completed final sign-off Apr 2022 | 575 Florida St | Principal Builders Inc. | structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2.Details
structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2. | $50,000 |
| Jun 29, 2021 | Completed final sign-off Sep 2021 | 600 Battery St | Hillhouse Construction Company Inc | revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.Details
revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications. | $10,000 |
| Apr 22, 2021 | Expired or cancelled cancelled Jan 2026 | 301 Toland St | C & J Contracting Inc | renovation of an existing warehouse including new exterior openings, and new accessible entry.Details
renovation of an existing warehouse including new exterior openings, and new accessible entry. | $350,000 |
| Apr 6, 2021 | Completed final sign-off Apr 2022 | 575 Florida St | Principal Builders Inc. | revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler.Details
revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler. | |
| Feb 3, 2021 | Completed final sign-off Apr 2021 | 56 Forest View Dr | Alvarado & Son Construction Inc | repair with tributary less than 15% of the total building area consisting of supplemental floor beam and post with new spread footing.Details
repair with tributary less than 15% of the total building area consisting of supplemental floor beam and post with new spread footing. | $6,000 |
| Dec 3, 2020 | Completed final sign-off Feb 2023 | 301 Toland St | C & J Contracting Inc | construction of new structural & new non-structural partitions, ceiling, lighting, plumbing, and finishes. exterior improvements for accessibility scope of work under pa# 202011058335.Details
construction of new structural & new non-structural partitions, ceiling, lighting, plumbing, and finishes. exterior improvements for accessibility scope of work under pa# 202011058335. | $750,000 |
| Jul 13, 2020 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258).Details
additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258). | $8,000 |
| Feb 7, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | interior ti at leve 7; buildout of office with meeting space & storage, kitchenette, coffee prep, huddle rooms, phone rooms, conference rooms. one all gender restroom.Details
interior ti at leve 7; buildout of office with meeting space & storage, kitchenette, coffee prep, huddle rooms, phone rooms, conference rooms. one all gender restroom. | $3,000,000 |
| Jan 24, 2020 | Completed final sign-off Oct 2021 | 633 Folsom St | Principal Builders Inc. | 1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lightingDetails
1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lighting | $4,000,000 |
| Jan 13, 2020 | Completed final sign-off Mar 2021 | 633 Folsom St | Plant Construction Co, Lp | revision to pa 2017-0601-8184 s1 (structural); adding steel beams for voluntary floor strengthening at level 2Details
revision to pa 2017-0601-8184 s1 (structural); adding steel beams for voluntary floor strengthening at level 2 | |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replaceDetails
portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replace | $70,000 |
| Aug 16, 2018 | Completed final sign-off Mar 2021 | 633 Folsom St | Plant Construction Co, Lp | revision to s1 (structural). modifications to foundation retrofits at 11 existing foundations. 28 new micropiles were added to the plans. ref. pa#2017-06-01-8184s1.Details
revision to s1 (structural). modifications to foundation retrofits at 11 existing foundations. 28 new micropiles were added to the plans. ref. pa#2017-06-01-8184s1. | |
| Jul 3, 2018 | Completed final sign-off Apr 2021 | 633 Folsom St | Plant Construction Co, Lp | tower crane & foundation for pa# 2017/06/01/8184-s.Details
tower crane & foundation for pa# 2017/06/01/8184-s. | $200,000 |
| Aug 4, 2016 | Completed final sign-off Mar 2017 | 3501 Laguna St | B-Side Inc. | common area- provide targeted voluntary seismic strengthening to imrpove continuity of diaphragm at 1st elevated story. n/a ordinance #155-13Details
common area- provide targeted voluntary seismic strengthening to imrpove continuity of diaphragm at 1st elevated story. n/a ordinance #155-13 | $8,000 |