Eddie Tabet
- Listed as
- engineer
- Firm
- Tec Accutite
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2015 to May 2025
7 permits since 2000 (engineer on 7 permits): 4 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2025 | In progress issued Jul 2025 | 274 Brannan St | Accutite Technology Engineering | single wall ust closure in-place of a stand alone in-ground 2000gal fuel tank.Details
single wall ust closure in-place of a stand alone in-ground 2000gal fuel tank. | $5,000 |
| Mar 3, 2025 | Completed final sign-off May 2026 | 201 Spear St | Accutite Technology Engineering | remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank.Details
remove 2000-gal underground diesel fuel storage tank & install two new 300-gal above ground double wall tanks. one 300-gal double wall tank for the emergency generator, & one-300-gal double wall tank for the fire pump. install one new gravity fed remote fill system for each 300-gal tank. | $300,000 |
| Feb 10, 2025 | In progress issued Mar 2025 | 201 Spear St | Superior Automatic Sprinkler | 18/fl-ref 202412025941- modify sprinkler system as required for (n) wall and ceiling configuration at 18th floor tenant space.Details
18/fl-ref 202412025941- modify sprinkler system as required for (n) wall and ceiling configuration at 18th floor tenant space. | $10,000 |
| Mar 12, 2020 | Never finaled issued Jan 2023, no final | 101 Cargo Wy | Accutite Technology Engineering | above ground fuel tank & 500 gallon propane tank. install (1) ul-2085 ast and (1) ul-644ast. install tank top accessories and tank labels. install vehicle protection k-rails at ul-644 tank. maher naDetails
above ground fuel tank & 500 gallon propane tank. install (1) ul-2085 ast and (1) ul-644ast. install tank top accessories and tank labels. install vehicle protection k-rails at ul-644 tank. maher na | $10,000 |
| Mar 11, 2019 | Completed final sign-off Apr 2019 | 615 Bay Shore Bl | Accutite Technology Engineering | revision to pa 201902052098. install concrete footing, install (n) automotive lifts, connect to (e) electrical. (e) hvac system to remain.Details
revision to pa 201902052098. install concrete footing, install (n) automotive lifts, connect to (e) electrical. (e) hvac system to remain. | $12,000 |
| Feb 5, 2019 | Completed final sign-off Apr 2019 | 615 Bay Shore Bl | Accutite Technology Engineering | install concrete footing, relocate, reinstall (e) automotive liftsDetails
install concrete footing, relocate, reinstall (e) automotive lifts | $25,000 |
| Oct 7, 2015 | Completed final sign-off Aug 2017 | 1650 Mission St | Chiang C M Construction Inc. | installation of emergency generator & fuel tank, 4 hour rated enclosure, vestibule, exhaust duct to roof.maher ordinance - extended ordinance no.155-13 not requiredDetails
installation of emergency generator & fuel tank, 4 hour rated enclosure, vestibule, exhaust duct to roof.maher ordinance - extended ordinance no.155-13 not required |