John Westphal

License
4575
State contractor license record
Listed as
engineer
Firm
Kpw Structural Engineers
On San Francisco permits
Aug 2012 to Jul 2024

12 permits since 2000 (engineer on 12 permits): 9 completed, 1 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 26, 2024Completed
final sign-off Jan 2025
550 Terry A Francois BlTruebeck Constructionrevision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design
Details
Permit
202407267411
Status
complete
Filed
Jul 26, 2024
Permit issued
Nov 15, 2024
Final sign-off
Jan 16, 2025
Address
550 Terry A Francois Bl

revision pa# 2023-0217-2178 changes include: reconfigure transfromer room and remove exterior & street work associated with original design

Open the permit page

Jan 30, 2023Completed
final sign-off Jan 2025
550 Terry A Francois BlTruebeck Constructionrevision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule.
Details
Permit
202301301009
Status
complete
Filed
Jan 30, 2023
Permit issued
Feb 15, 2023
Final sign-off
Jan 16, 2025
Address
550 Terry A Francois Bl

revision to permit 202210265236. changes include - revised size and floor opening and adjacent framing for the central mech shaft for floor 2-6 and roof. update beam schedule.

Open the permit page

May 23, 2017Completed
final sign-off Aug 2017
650 California StDome Construction Corp6/f, 7/f- this is an addition to permit app#201702270162. an internal stairs is being installed between the 6th and 7th floor: work includes demo of slab, install of structural steel and stair.
Details
Permit
201705237396
Status
complete
Filed
May 23, 2017
Permit issued
May 25, 2017
Final sign-off
Aug 15, 2017
Declared cost
$200,000
Address
650 California St

6/f, 7/f- this is an addition to permit app#201702270162. an internal stairs is being installed between the 6th and 7th floor: work includes demo of slab, install of structural steel and stair.

Open the permit page

$200,000
Apr 6, 2017Completed
final sign-off Oct 2018
201 Spear StDome Construction Corp5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13
Details
Permit
201704063350
Status
complete
Filed
Apr 6, 2017
Permit issued
Apr 19, 2017
Final sign-off
Oct 17, 2018
Declared cost
$100,000
Address
201 Spear St

5/f. 6/f- rev. to pa#201702018381, addition of structural stair from 5/f to 6/f. n/a ordinance #155-13

Open the permit page

$100,000
Nov 16, 2015Completed
final sign-off Jun 2016
1371 Grove StCalifornia Builders & Foundationssoft story retrofit per sfbc chapter 34b, engineering criteria fema p-807
Details
Permit
201511162651
Status
complete
Filed
Nov 16, 2015
Permit issued
Feb 2, 2016
Final sign-off
Jun 13, 2016
Declared cost
$60,000
Address
1371 Grove St

soft story retrofit per sfbc chapter 34b, engineering criteria fema p-807

Open the permit page

$60,000
Oct 22, 2015Expired or cancelled
withdrawn May 2016
1885 Mission StD.F.P.F Corp Dba Fine Line Construction(2nd floor only) new wood interior stair in (e) floor opening from 2nd to 3rd floor, new non structural interior partitions
Details
Permit
201510220508
Status
withdrawn
Filed
Oct 22, 2015
Declared cost
$50,000
Address
1885 Mission St

(2nd floor only) new wood interior stair in (e) floor opening from 2nd to 3rd floor, new non structural interior partitions

Open the permit page

$50,000
Oct 22, 2015Expired or cancelled
withdrawn May 2016
1885 Mission StD.F.P.F Corp Dba Fine Line Construction(3rd floor only) new non structural interior partitions - change of occupancy
Details
Permit
201510220509
Status
withdrawn
Filed
Oct 22, 2015
Declared cost
$25,000
Address
1885 Mission St

(3rd floor only) new non structural interior partitions - change of occupancy

Open the permit page

$25,000
Oct 22, 2015Completed
final sign-off Aug 2017
1885 Mission StD.F.P.F Corp Dba Fine Line Construction, Devlin/Mcnally Construction1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open.
Details
Permit
201510220503
Status
complete
Filed
Oct 22, 2015
Permit issued
Sep 30, 2016
Final sign-off
Aug 31, 2017
Declared cost
$50,000
Address
1885 Mission St

1,2&3 fls. reloc main entrance fr corner of 15 st&mission st,to be loc on mission st.new exterior garage doors,door& window on east facade.new non-stru int partions all 3 fls-new wood int stair in(e)fl opening fr 1st-2nd fl w/rated enclosure@2/fl.new stair fr 2nd-3rd fl in(e)open.

Open the permit page

$50,000
Sep 16, 2015Completed
final sign-off Aug 2017
1885 Mission StD.F.P.F Corp Dba Fine Line Construction, Devlin/Mcnally Constructioncomply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement
Details
Permit
201509167173
Status
complete
Filed
Sep 16, 2015
Permit issued
Jul 8, 2016
Final sign-off
Aug 31, 2017
Declared cost
$350,000
Address
1885 Mission St

comply w/nov 201302222, core and shell upgrade of unoccupied bldg. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement

Open the permit page

$350,000
Mar 30, 2015Completed
final sign-off May 2018
1001 California Stcommon area- repairs to existing concrete balustrade, stucco repairs, concrete rehabilitation, replacement of roof top terrace tile, new terrace guardrail
Details
Permit
201503302223
Status
complete
Filed
Mar 30, 2015
Permit issued
Jun 24, 2015
Final sign-off
May 11, 2018
Declared cost
$500,000
Address
1001 California St

common area- repairs to existing concrete balustrade, stucco repairs, concrete rehabilitation, replacement of roof top terrace tile, new terrace guardrail

Open the permit page

$500,000
Feb 2, 2015Never finaled
issued Apr 2015, no final
401 Keith StWayne E Swisher Cement Contractor Inc.2 concrete slabs, trench drains, new disabled ramp, guardrails, rated mech. room. boiler & sprinkler under separate permit. ** maher: comliance with ordinance no# 155-13 not required **
Details
Permit
201502027208
Status
issued
Filed
Feb 2, 2015
Permit issued
Apr 10, 2015
Declared cost
$72,510
Address
401 Keith St

2 concrete slabs, trench drains, new disabled ramp, guardrails, rated mech. room. boiler & sprinkler under separate permit. ** maher: comliance with ordinance no# 155-13 not required **

Open the permit page

$72,510
Aug 23, 2012Completed
final sign-off Mar 2016
2030 Fell StOn Point Constructionab-094. soft story voluntary limited seismic upgrade.
Details
Permit
201208238125
Status
complete
Filed
Aug 23, 2012
Permit issued
Aug 19, 2013
Final sign-off
Mar 3, 2016
Declared cost
$150,000
Address
2030 Fell St

ab-094. soft story voluntary limited seismic upgrade.

Open the permit page

$150,000