Block 7255, lot 005
4210 Ocean Ave
- City’s use
- Commercial Retail
- Built
- 1993
- Stories
- 1
- Building
- 9,786 sq ft
- Lot
- 24,844 sq ft
- Zoning
- NCS
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 5, 2024 | In progress issued Oct 2024 | 4210 Ocean Av | Teracom Services Llc | ref pa# 2023-0608-9589 installation of chain link fence lid placed on top of existing trek fence enclosure and door lock upgrade to be installed on the enclosed door ref pa 202306089589Details
ref pa# 2023-0608-9589 installation of chain link fence lid placed on top of existing trek fence enclosure and door lock upgrade to be installed on the enclosed door ref pa 202306089589 | $25,000 |
| Jun 8, 2023 | Completed final sign-off Feb 2024 | 4210 Ocean Av | Teracom Services Llc | replace only(3)150kw gen3 with (2)350kw gen4.replace(2)gen 3 power cabinets with gen4 power cabinets and raise them up 6" on a proposed steel platform for the purpose of conduit management.Details
replace only(3)150kw gen3 with (2)350kw gen4.replace(2)gen 3 power cabinets with gen4 power cabinets and raise them up 6" on a proposed steel platform for the purpose of conduit management. | $83,000 |
| Apr 11, 2019 | Never finaled issued Apr 2019, no final | 4210 Ocean Av | per owner's request, add new address to block 7255, lot 005 as; 4210 ocean ave.Details
per owner's request, add new address to block 7255, lot 005 as; 4210 ocean ave. | ||
| Apr 11, 2019 | Never finaled issued Jun 2019, no final | 4210 Ocean Av | Cupertino Electric Inc. | install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete padDetails
install 1 utility transformer, 1 switch board assembly, (3) 150 kw btc power units, (3) 150 kw bic dispensers, 1 level 2 charger. equipment enclosure. concrete pad | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Teracom Services Llc (2), Cupertino Electric Inc.
- Engineers
- Gary Dean Sommerfeld, Maged Samir Henein
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.