Block 4232, lot 010
601 23rd St
- City’s use
- Industrial
- Built
- 1923
- Stories
- 3
- Units
- 6
- Rooms
- 9 bathrooms
- Building
- 279,450 sq ft
- Lot
- 476,324 sq ft
- Zoning
- PDR1G
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
66 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 28, 2025 | In progress filed Aug 2025, not yet issued | 601 23rd St | erect a one story, type 5b, storage building. see plans for more details.Details
erect a one story, type 5b, storage building. see plans for more details. | $500,000 | |
| Aug 4, 2025 | In progress filed Aug 2025, not yet issued | 601 23rd St | partial site demolition of a portion of a vacant lot including the removal of various asphalt concrete and portland cement concrete pavements and foundations, installation and load testing of (2) piles, and testing of ground improvement activities in 2 locations.Details
partial site demolition of a portion of a vacant lot including the removal of various asphalt concrete and portland cement concrete pavements and foundations, installation and load testing of (2) piles, and testing of ground improvement activities in 2 locations. | $95,000 | |
| Nov 3, 2023 | Completed final sign-off Jan 2024 | 501 23rd St | Cosco Fire Protection Inc. | revision to the previously approval permit 202209212882. to change address on plans to 501 23rd st. sf ca. also adding more abort switches and replace exterior stobe with horn/strobesDetails
revision to the previously approval permit 202209212882. to change address on plans to 501 23rd st. sf ca. also adding more abort switches and replace exterior stobe with horn/strobes | $100,000 |
| Aug 31, 2023 | Never finaled issued Aug 2023, no final | 601 23rd St | Siemens Industry, Inc. | fire only work to monitor the pre-action system in the spare parts building; additions are a 4-input/output modules and the replacement of fire alarm panel cards for an upgrade to it.Details
fire only work to monitor the pre-action system in the spare parts building; additions are a 4-input/output modules and the replacement of fire alarm panel cards for an upgrade to it. | $2,400 |
| Sep 21, 2022 | Completed final sign-off Jan 2024 | 501 23rd St | Cosco Fire Protection Inc. | install new novel 1230 clean agent system to protect the spare parts enclosure buildingDetails
install new novel 1230 clean agent system to protect the spare parts enclosure building | $136,800 |
| Sep 21, 2022 | Never finaled issued Sep 2022, no final | 501 23rd St | Cosco Fire Protection Inc. | install new novel 1230 clen agent detection system to protect the spare parts enclosure buildingDetails
install new novel 1230 clen agent detection system to protect the spare parts enclosure building | $100,000 |
| Jun 21, 2022 | Expired or cancelled cancelled Jan 2026 | 555 23rd St | transbay cable proposes to install a 14'w x 54'l x 14.5'h pre-engineered metal garage as part of thier ac/dc converted station located at 555 23rd st sf. the garage post will be open on all sides for euip. storage the structure will be installed on a 14'w x 54'l x 24" thick reinforeced concrete founDetails
transbay cable proposes to install a 14'w x 54'l x 14.5'h pre-engineered metal garage as part of thier ac/dc converted station located at 555 23rd st sf. the garage post will be open on all sides for euip. storage the structure will be installed on a 14'w x 54'l x 24" thick reinforeced concrete foun | $389,000 | |
| Oct 1, 2021 | Completed final sign-off Oct 2021 | 435 23rd St | Sabah International Incorporated | as built for #202107194610. added (3) horn strobes on the 1st floor loading dock. added (5) strobes & (5) horn/strobes on the basement floor.Details
as built for #202107194610. added (3) horn strobes on the 1st floor loading dock. added (5) strobes & (5) horn/strobes on the basement floor. | |
| Aug 18, 2021 | Never finaled issued Aug 2021, no final | 435 23rd St | City Graphics Solutions Llc | installation of new led exterior sign for amazon distribution centerDetails
installation of new led exterior sign for amazon distribution center | $10,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 435 23rd St | Sabah International Incorporated | 1/f: provide a new fire alarm system on the ground floor only. ref t.i. pa202006048124. maher n/a.Details
1/f: provide a new fire alarm system on the ground floor only. ref t.i. pa202006048124. maher n/a. | $31,650 |
| Jul 8, 2021 | Completed final sign-off Sep 2021 | 435 23rd St | Ayoob & Peery Plumbing Co Inc | 1st fl - relocate 27 per ti; 3rd floor change out 540 per ti ref pa 2020-0914-4159Details
1st fl - relocate 27 per ti; 3rd floor change out 540 per ti ref pa 2020-0914-4159 | $76,720 |
| Jun 15, 2021 | Never finaled issued Aug 2021, no final | 435 23rd St | U D Construction Llc | installation of fixed shelving unitsDetails
installation of fixed shelving units | $39,000 |
| Oct 24, 2020 | Expired or cancelled withdrawn May 2021 | 501 23rd St | Total Telco Specialists Inc | install new 60' tall monopole supporting mw dish antennas, new 2 bay cabinet, step down transformer bollards and conduits for power and fiber. install radio rack inside existing building.Details
install new 60' tall monopole supporting mw dish antennas, new 2 bay cabinet, step down transformer bollards and conduits for power and fiber. install radio rack inside existing building. | $75,000 |
| Sep 14, 2020 | Completed final sign-off Feb 2022 | 435 23rd St | Dome Construction Corp | tenant improvement of shell warehouse building: new office & support core, new mechanical equipment, high speed overhead doors, additional site signage, high volume fans & associated electrical work. mhe system shown for reference only and no high-pile storage is proposed in this scope of work.Details
tenant improvement of shell warehouse building: new office & support core, new mechanical equipment, high speed overhead doors, additional site signage, high volume fans & associated electrical work. mhe system shown for reference only and no high-pile storage is proposed in this scope of work. | $4,750,300 |
| Jun 4, 2020 | Completed final sign-off Feb 2022 | 435 23rd St | Dome Construction Corp | demo for new office 2010 sf and support core per ab-017 and site erosion control.Details
demo for new office 2010 sf and support core per ab-017 and site erosion control. | $39,790 |
| Nov 14, 2019 | Never finaled issued Nov 2019, no final | 555 23rd St | street spaceDetails
street space | ||
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 601 23rd St | street spaceDetails
street space | ||
| Dec 8, 2015 | Never finaled issued Dec 2015, no final | 601 23rd St | Siemens Industry, Inc. | 1st floor: fire alarm for the generator project, additions are 3 monitor modules to send generator status points into the fire alarm system. n/a for maher. ref permit app #201503130827Details
1st floor: fire alarm for the generator project, additions are 3 monitor modules to send generator status points into the fire alarm system. n/a for maher. ref permit app #201503130827 | $1,500 |
| Mar 13, 2015 | Never finaled issued Oct 2015, no final | 601 23rd St | Cupertino Electric Inc. | install 480 v feeders in trench between existing auxilary generators and new section of switchgear. install three backup disesel generators and associated electrical interconnecting equipment. verification of as built condition. maher requiredDetails
install 480 v feeders in trench between existing auxilary generators and new section of switchgear. install three backup disesel generators and associated electrical interconnecting equipment. verification of as built condition. maher required | $1,600,000 |
| Oct 17, 2014 | Completed final sign-off Jun 2015 | 435 23rd St | at&t proposes a temporary cellsite on a cell block foundation w/ (1) (n) gps antenna; (11) one 62'-8" monopolo w/ 9 panel antennas, (12) remote radio units.from date of permit issuance permit is valid for 6 months. n/a maher ordinance # 155-13Details
at&t proposes a temporary cellsite on a cell block foundation w/ (1) (n) gps antenna; (11) one 62'-8" monopolo w/ 9 panel antennas, (12) remote radio units.from date of permit issuance permit is valid for 6 months. n/a maher ordinance # 155-13 | $45,000 | |
| Oct 15, 2014 | Completed final sign-off Jun 2015 | 1301 Illinois St | Centric Construction Inc | new deck for existing prefabricated structure. deck to include ramp and handrails. new shed, new wetland, new insulation on foundation, new minor repairs, ref. 201409116038; maher n/aDetails
new deck for existing prefabricated structure. deck to include ramp and handrails. new shed, new wetland, new insulation on foundation, new minor repairs, ref. 201409116038; maher n/a | $202,600 |
| Jun 17, 2014 | Completed final sign-off Jul 2014 | 401 23rd St | E.A.Davidovits &Co.,Inc. | revision to app#201402208889. add 2 light well to the original permit.Details
revision to app#201402208889. add 2 light well to the original permit. | $1,000 |
| May 6, 2014 | Completed final sign-off Jul 2014 | 401 23rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | fire sprinkler contactor is to relocate 2 pendent heads, add 8 uprights and 8 pendent heads in 2nd floor extension. ref app#201402208889. n/a for the maher ordinance.Details
fire sprinkler contactor is to relocate 2 pendent heads, add 8 uprights and 8 pendent heads in 2nd floor extension. ref app#201402208889. n/a for the maher ordinance. | $3,000 |
| Apr 15, 2014 | Never finaled issued Apr 2014, no final | 555 23rd St | new inertia pads for bifuel generators. n/a for maher ordinance #155-13Details
new inertia pads for bifuel generators. n/a for maher ordinance #155-13 | $50,000 | |
| Mar 13, 2014 | Never finaled issued Mar 2014, no final | 555 23rd St | new foundation to support a voltage transformer. yes for the maher ordinance #155-13Details
new foundation to support a voltage transformer. yes for the maher ordinance #155-13 | $50,000 | |
| Feb 20, 2014 | Completed final sign-off Jul 2014 | 401 23rd St | E.A.Davidovits &Co.,Inc. | enclose the extg interior deck and create new interior windows/partitions/doors. add one new restroom, add new carpet/countertop and cabinet. rewire electrical/data, and new t-bar ceiling.n/a for the maher ordinance #155-13Details
enclose the extg interior deck and create new interior windows/partitions/doors. add one new restroom, add new carpet/countertop and cabinet. rewire electrical/data, and new t-bar ceiling.n/a for the maher ordinance #155-13 | $175,000 |
| Aug 16, 2013 | Never finaled issued Aug 2013, no final | 555 23rd St | Siemens Industry, Inc. | addition of 20 monitor modules for individual upsets from existing uv and i/r detectors located at the converter hall. all devices connect onto fire alarm systemDetails
addition of 20 monitor modules for individual upsets from existing uv and i/r detectors located at the converter hall. all devices connect onto fire alarm system | $10,000 |
| Apr 3, 2013 | Never finaled issued Apr 2013, no final | 601 23rd St | street spaceDetails
street space | ||
| May 16, 2012 | Completed final sign-off Jun 2012 | 555 23rd St | Siemens Industry, Inc. | addition of 2 pull stations, 1 smoke detector & 2 horn/strobes onto the (e) suppression control system for the converter building.Details
addition of 2 pull stations, 1 smoke detector & 2 horn/strobes onto the (e) suppression control system for the converter building. | $2,500 |
| Jun 16, 2009 | Never finaled issued Jun 2009, no final | 401 23rd St | Qse Construction | connect (e) elevated truck dock to warehouse floor, new concrete ramp (16ft to grade) on grade is to be provided all in the hopes of making it easier for heavy crate movement, refer to pa's# 2008-0611-4189 & 2007-0214-4164 (for ada compliance)Details
connect (e) elevated truck dock to warehouse floor, new concrete ramp (16ft to grade) on grade is to be provided all in the hopes of making it easier for heavy crate movement, refer to pa's# 2008-0611-4189 & 2007-0214-4164 (for ada compliance) | $21,566 |
| Apr 29, 2009 | Completed final sign-off Jan 2010 | 555 23rd St | Superior Automatic Sprinkler | design and install deluxe fire sprinkler system (overhead and underground pipe)Details
design and install deluxe fire sprinkler system (overhead and underground pipe) | $20,000 |
| Apr 2, 2009 | Completed final sign-off Jul 2009 | 401 23rd St | Flo Stor Engineering Inc | modifications to (e) conveyor systemDetails
modifications to (e) conveyor system | $40,000 |
| Mar 26, 2009 | Never finaled issued Mar 2009, no final | 401 23rd St | Lifeguard Fire Protection | add 32 new fire sprinkler .Details
add 32 new fire sprinkler . | $5,200 |
| Feb 24, 2009 | Never finaled issued Feb 2009, no final | 601 23rd St | Superior Automatic Sprinkler | install new (36) head sprinkler system per nfpa 13 throughout. underground seperate permit.Details
install new (36) head sprinkler system per nfpa 13 throughout. underground seperate permit. | $18,000 |
| Oct 24, 2008 | Completed final sign-off Jan 2010 | 501 23rd St | revision to approved appl. 2008 0930 3040: final plans for site improvements and underground utilities associated with the transbay cable project. landscaping work to be submitted under a separate permit.Details
revision to approved appl. 2008 0930 3040: final plans for site improvements and underground utilities associated with the transbay cable project. landscaping work to be submitted under a separate permit. | ||
| Oct 8, 2008 | Completed final sign-off Nov 2008 | 401 23rd St | Bayside Mechanical Inc | install four roof top heat pump units and duct workDetails
install four roof top heat pump units and duct work | $30,000 |
| Sep 30, 2008 | Completed final sign-off Jan 2010 | 501 23rd St | transbay cable project: grading of the site, including approximately 335 cubic yards (cy) import fill, 723 cy excavated material, drainage, underground utilities, paving and related site improvements.Details
transbay cable project: grading of the site, including approximately 335 cubic yards (cy) import fill, 723 cy excavated material, drainage, underground utilities, paving and related site improvements. | $760,000 | |
| Sep 24, 2008 | Never finaled issued Oct 2008, no final | 555 23rd St | Cleveland Wrecking Company | revision to approved site permit application 2008 0428 0817: excavate for, construct electric power transmission ductbanks. backfill, repave over trenches. approximate quantity 900 lf x 3' wide x 5' deep.Details
revision to approved site permit application 2008 0428 0817: excavate for, construct electric power transmission ductbanks. backfill, repave over trenches. approximate quantity 900 lf x 3' wide x 5' deep. | $500,000 |
| Sep 19, 2008 | Completed final sign-off Nov 2008 | 401 23rd St | Aaa Restaurant Fire Control/Dba Aaa Fire | install fire sprinkler system per nfpa 13.Details
install fire sprinkler system per nfpa 13. | $28,000 |
| Jun 11, 2008 | Never finaled issued Dec 2008, no final | 401 23rd St | exterior alteration to (e) warehouse to install one (n) window on south wall and a (n) shed above the loading dock area on the west wall.Details
exterior alteration to (e) warehouse to install one (n) window on south wall and a (n) shed above the loading dock area on the west wall. | $38,000 | |
| Jun 9, 2008 | Never finaled issued Jun 2008, no final | 501 23rd St | transbay cable project: indicator pile on / for future use of trans bay cable project. no structural notification needed per hanson tom.Details
transbay cable project: indicator pile on / for future use of trans bay cable project. no structural notification needed per hanson tom. | $65,000 | |
| Apr 28, 2008 | Completed final sign-off Jan 2010 | 555 23rd St | ***premium plan check paid*** transbay cable project: coverter building, type 2b, 1 story.Details
***premium plan check paid*** transbay cable project: coverter building, type 2b, 1 story. | $5,500,000 | |
| Apr 28, 2008 | Completed final sign-off Jan 2010 | 601 23rd St | transbay cable project: erect 1-story, type ii-b building for "b" occupancy - office/administration useDetails
transbay cable project: erect 1-story, type ii-b building for "b" occupancy - office/administration use | $2,300,000 | |
| Apr 28, 2008 | Completed final sign-off Jan 2010 | 501 23rd St | transbay cable project: erect 1-story, type ii-b building for "s-2" occupancy - spare parts storage shedDetails
transbay cable project: erect 1-story, type ii-b building for "s-2" occupancy - spare parts storage shed | $500,000 | |
| Mar 20, 2008 | Never finaled issued Mar 2008, no final | 401 23rd St | revision to 200711137978. scope of work this revision to remove 2 restrooms from approved pa 200711137978 (phase 1) work includes relocating 1 entry doors on west facade. restripping accessible doors & infill onwest facade to be temporary materials only.Details
revision to 200711137978. scope of work this revision to remove 2 restrooms from approved pa 200711137978 (phase 1) work includes relocating 1 entry doors on west facade. restripping accessible doors & infill onwest facade to be temporary materials only. | ||
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 401 23rd St | Securitas Technology Corporation | fire alarm monitoring system. connection to 2 (e) waterflow devices, 2 temper switches, add 1 smoke detector, 1 manual pull station and 1 horn strobe.Details
fire alarm monitoring system. connection to 2 (e) waterflow devices, 2 temper switches, add 1 smoke detector, 1 manual pull station and 1 horn strobe. | $5,000 |
| Feb 5, 2008 | Never finaled issued Jun 2009, no final | 401 23rd St | Pro Ad Signs & Lighting Inc. | install non-illuminated dimensioan letters (dhl) and 2 outdoor light fixtures and extension armsDetails
install non-illuminated dimensioan letters (dhl) and 2 outdoor light fixtures and extension arms | $1,400 |
| Jan 7, 2008 | Completed final sign-off Apr 2008 | 401 23rd St | install 3 temporary trailers at construction site to supply offices & restrooms for construction. t. i for construction site under p.a. # 200712281548. m.e.p. under separate permit. all 3 structures to be removed upon construction of adjacent bldg.Details
install 3 temporary trailers at construction site to supply offices & restrooms for construction. t. i for construction site under p.a. # 200712281548. m.e.p. under separate permit. all 3 structures to be removed upon construction of adjacent bldg. | $40,000 | |
| Dec 28, 2007 | Completed final sign-off Dec 2008 | 401 23rd St | new office ti.new mezzanine.new truck dock. construct a (n) office t.i. within the (e) warehouse and a (n) office mezzanine floor above. fire protection & mep. under seperate permit.Details
new office ti.new mezzanine.new truck dock. construct a (n) office t.i. within the (e) warehouse and a (n) office mezzanine floor above. fire protection & mep. under seperate permit. | $350,000 | |
| Dec 11, 2007 | Never finaled issued Apr 2008, no final | 401 23rd St | Qse Construction | revision to pa# 2007/11/13/7978 & 2007/12/11/0293. provide final lateral strenghtening to this subject structure for complete current 2001 ca bldg code & current sfbc chapter 16 (1605.4) and chapter 34 (3403.6) lateral strenghtening. voluntary upgrade to complete current code.nov 200729349.Details
revision to pa# 2007/11/13/7978 & 2007/12/11/0293. provide final lateral strenghtening to this subject structure for complete current 2001 ca bldg code & current sfbc chapter 16 (1605.4) and chapter 34 (3403.6) lateral strenghtening. voluntary upgrade to complete current code.nov 200729349. | $88,966 |
| Nov 20, 2007 | Completed final sign-off Apr 2008 | 401 23rd St | Indoor Air Design Inc | install 4 roof mounted exhaust fans ( 38" high) with related duct work. install 8 gravity make-up air fans.Details
install 4 roof mounted exhaust fans ( 38" high) with related duct work. install 8 gravity make-up air fans. | $93,000 |
| Nov 19, 2007 | Completed final sign-off Apr 2008 | 401 23rd St | replace the extg roll up garage doors in extg bldg. no change to extg opening in kind changeDetails
replace the extg roll up garage doors in extg bldg. no change to extg opening in kind change | $15,000 | |
| Nov 13, 2007 | Completed final sign-off Apr 2008 | 401 23rd St | respnnse to complaint #200729349. exteriorwork to replace existing windows in kind/interior remodel to install accessible parking,path of travel, entry door and restrooms. new egress doors and truck doors and openings in exterior walls. mep, fire sprinklers under sep. app.Details
respnnse to complaint #200729349. exteriorwork to replace existing windows in kind/interior remodel to install accessible parking,path of travel, entry door and restrooms. new egress doors and truck doors and openings in exterior walls. mep, fire sprinklers under sep. app. | $235,765 | |
| Nov 9, 2007 | Completed final sign-off Jul 2008 | 555 23rd St | Cleveland Wrecking Company | demolish buildingDetails
demolish building | |
| Nov 9, 2007 | Completed final sign-off Jul 2008 | 555 23rd St | Cleveland Wrecking Company | grading - remove site paving entire site. install 6 ft chain link for entire perimeter. excavate 3.5 ft. cal soils. install geo-tex over entire site import clean fill. in compacted lifts. excavate (4) 40 ft x 40 ft x 20 ft deep "hot spots" has soils. excavate and backfill w/ pea gravel.Details
grading - remove site paving entire site. install 6 ft chain link for entire perimeter. excavate 3.5 ft. cal soils. install geo-tex over entire site import clean fill. in compacted lifts. excavate (4) 40 ft x 40 ft x 20 ft deep "hot spots" has soils. excavate and backfill w/ pea gravel. | $2,000,000 |
| Feb 14, 2007 | Never finaled issued Apr 2007, no final | 435 23rd St | Qse Construction | voluntary parapet safety upgrade w/ repair of exterior spalled concrete. place simpson mtt28b with 3/4" 0 redhead exp.a.b. @36" o.c. all around interior wood diaphragm to exterior conc. conn.Details
voluntary parapet safety upgrade w/ repair of exterior spalled concrete. place simpson mtt28b with 3/4" 0 redhead exp.a.b. @36" o.c. all around interior wood diaphragm to exterior conc. conn. | $83,530 |
| Jan 29, 2007 | Never finaled issued Jan 2007, no final | 401 23rd St | additional address for a separate buildingDetails
additional address for a separate building | ||
| Jan 19, 2007 | Completed final sign-off Mar 2007 | 435 23rd St | State Roofing Systems Inc | reroofing.Details
reroofing. | $255,000 |
| Dec 6, 2006 | Never finaled issued Dec 2006, no final | 435 23rd St | Qse Construction | existing perimeter wood ledger against concrete walls is rotten in places. this permit allows this 6x ledger to be inspected and replaced as required with a new 6x p.t. ledger to (e) wall and 16d galv. nails to 2x roof.Details
existing perimeter wood ledger against concrete walls is rotten in places. this permit allows this 6x ledger to be inspected and replaced as required with a new 6x p.t. ledger to (e) wall and 16d galv. nails to 2x roof. | $10,000 |
| Jun 22, 2004 | Never finaled issued Jun 2004, no final | 555 23rd St | California Sign Installation | reface existing s/f cabinet sign per drawingDetails
reface existing s/f cabinet sign per drawing | $250 |
| Jun 22, 2004 | Never finaled issued Jun 2004, no final | 555 23rd St | California Sign Installation | non structural sign replace existing d/f pole sign as epr drawingDetails
non structural sign replace existing d/f pole sign as epr drawing | $800 |
| Mar 21, 2003 | Completed final sign-off Dec 2003 | 435 23rd St | Fluid Industrial | cut & excavate for new pad;install 11000 gal nitrogen tank (fire dept permit reqd)Details
cut & excavate for new pad;install 11000 gal nitrogen tank (fire dept permit reqd) | $10,000 |
| Jan 14, 2003 | Completed final sign-off Feb 2003 | 435 23rd St | delete app#200204093501. building as is no structure change/or interior changeDetails
delete app#200204093501. building as is no structure change/or interior change | $3,000 | |
| Nov 6, 2002 | Expired or cancelled cancelled Dec 2003 | 435 23rd St | fire sprinkler buildingDetails
fire sprinkler building | $10,000 | |
| Apr 9, 2002 | Completed final sign-off Feb 2003 | 435 23rd St | add show room to exist warehouse/ and covered warehouse to flamble gas sales faucility.Details
add show room to exist warehouse/ and covered warehouse to flamble gas sales faucility. | $45,000 | |
| Dec 14, 2000 | Completed final sign-off Jun 2001 | 435 23rd St | Star Roofing Co | reroofingDetails
reroofing | $62,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Qse Construction (4), Siemens Industry, Inc. (4), Cleveland Wrecking Company (3), Cosco Fire Protection Inc. (3), Aaa Restaurant Fire Control/Dba Aaa Fire (2), California Sign Installation (2), Dome Construction Corp (2), E.A.Davidovits &Co.,Inc. (2), Sabah International Incorporated (2), Superior Automatic Sprinkler (2), Ayoob & Peery Plumbing Co Inc, Bayside Mechanical Inc, Centric Construction Inc, City Graphics Solutions Llc, Cupertino Electric Inc., Flo Stor Engineering Inc, Fluid Industrial, Indoor Air Design Inc, Lifeguard Fire Protection, Pro Ad Signs & Lighting Inc., Securitas Technology Corporation, Star Roofing Co, State Roofing Systems Inc, Total Telco Specialists Inc, U D Construction Llc
- Architects
- Kelly Simcox (2), Robert P. Budetti (2), Carlton Smith, Henry Kwong, Pro Ad Signs, Urs
- Engineers
- Thomas Lutge (2), Ben Au, Christian Natalus Dalimarta, Daniel Thomas Butler, Diarmuid Mac Neill, Lan Nguyen, Maurice Yee, Rafik Gerges, Raymond Nim, Thomas H. Lutge, Urs Corp, Wilson Lee
- Authorized agent-otherss
- Behzad Khosrowmoabed (2)
- Designers
- Nash Hurley
Find contractors for work like this