Raymond Nim
- Listed as
- engineer
- On San Francisco permits
- Jan 2021 to Aug 2025
3 permits since 2000 (engineer on 3 permits): 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2025 | In progress filed Aug 2025, not yet issued | 601 23rd St | partial site demolition of a portion of a vacant lot including the removal of various asphalt concrete and portland cement concrete pavements and foundations, installation and load testing of (2) piles, and testing of ground improvement activities in 2 locations.Details
partial site demolition of a portion of a vacant lot including the removal of various asphalt concrete and portland cement concrete pavements and foundations, installation and load testing of (2) piles, and testing of ground improvement activities in 2 locations. | $95,000 | |
| Dec 8, 2022 | In progress issued Dec 2023 | 850 Turk St | Cahill Contractors Llc., Bobcomm Llc Dba Pacific Das Llc. | priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building.Details
priority processing - 100% affordable housing. to erect a 8-story, 92-dwelling units, type 1a mixed-used building. | $39,000,000 |
| Jan 4, 2021 | Never finaled issued Oct 2023, no final | 2205 Mission St | Guzman Construction Group Inc. | priority mayor ed 13-01. to erect a type 1b, 9-story, 62 residential unit bldg with commercial space.Details
priority mayor ed 13-01. to erect a type 1b, 9-story, 62 residential unit bldg with commercial space. | $28,000,000 |