Block 6520, lot 039
3111 24th St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 5
- Rooms
- 6 bedrooms, 4 bathrooms
- Building
- 5,550 sq ft
- Lot
- 2,500 sq ft
- Zoning
- 24MISS
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
25 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2025 | Completed final sign-off Mar 2026 | 3111 24th St | Lee's Signs | install (1) led illuminated individual channel letters single faced wall sign: "bir kitchen" (sign a)Details
install (1) led illuminated individual channel letters single faced wall sign: "bir kitchen" (sign a) | $4,500 |
| Jun 25, 2025 | Completed final sign-off Mar 2026 | 3111 24th St | Lee's Signs | refacing double-sided blade sign: "bir kitchen logo" (sign b)Details
refacing double-sided blade sign: "bir kitchen logo" (sign b) | $150 |
| May 20, 2025 | Completed final sign-off Jun 2025 | 3111 24th St | Impact Restoration & Construction | to install new tondoor oven by replacing for burners range at same location to same (e) gasline.Details
to install new tondoor oven by replacing for burners range at same location to same (e) gasline. | $1,500 |
| Mar 8, 2024 | Completed final sign-off Mar 2024 | 3111 24th St | Flying Colors | at airwell on the east side of the building. dry rot repairs to existing roof at bottom of airwell. install new plywood decking, roofing material, and drain. reconfigure or re-route plumbing and electrical as needed. work being completed to comply with nov 202185816.Details
at airwell on the east side of the building. dry rot repairs to existing roof at bottom of airwell. install new plywood decking, roofing material, and drain. reconfigure or re-route plumbing and electrical as needed. work being completed to comply with nov 202185816. | $10,000 |
| Jan 17, 2024 | Completed final sign-off Jan 2024 | 3111 24th St | Flying Colors | replace siding at rear in kind. replace windows at rear with vinyl units. no change to openings not visible from the streetDetails
replace siding at rear in kind. replace windows at rear with vinyl units. no change to openings not visible from the street | $30,000 |
| Apr 21, 2023 | Completed final sign-off Mar 2025 | 3111 24th St | Meryl & Miller Llc | commencement of work not started under previously approved permit application pa#: 201908088250.Details
commencement of work not started under previously approved permit application pa#: 201908088250. | $5,000 |
| Feb 9, 2023 | Completed final sign-off May 2023 | 3111 24th St | Meryl & Miller Llc | repair (e) non-conforming stairway with some loose treads and minor dry rot that we will be addressing. repairs are less than 50% of entire stairway. all work in kind.Details
repair (e) non-conforming stairway with some loose treads and minor dry rot that we will be addressing. repairs are less than 50% of entire stairway. all work in kind. | $5,000 |
| Nov 18, 2021 | Completed final sign-off Oct 2022 | 3111 24th St | Aura Fire Safety Inc | install 1 fire sprinkler at the trash area per nfpa 13 on 2nd and 3rd fl from connection tap point at 1st fl. per noticed of violation 200557230.Details
install 1 fire sprinkler at the trash area per nfpa 13 on 2nd and 3rd fl from connection tap point at 1st fl. per noticed of violation 200557230. | $19,850 |
| Jun 11, 2021 | Never finaled filed Jun 2021, never issued | 3111 24th St | Pye-Barker Fire & Safety | design & install new fire sprinkler in trash room @ top floor only.Details
design & install new fire sprinkler in trash room @ top floor only. | $4,900 |
| Mar 19, 2021 | Completed final sign-off Jan 2022 | 3111 24th St | Meryl & Miller Llc | apt b: one kitchen and one bath remodel in kind. replace lights. no new wall and no (e) wall relocation. new plumbing fixtures remain at same location.Details
apt b: one kitchen and one bath remodel in kind. replace lights. no new wall and no (e) wall relocation. new plumbing fixtures remain at same location. | $30,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 3111 24th St | Meryl & Miller Llc | to comply with nov 201796681, item 3 - reconfigure closet wall and doors to create a code compliant trash enclosure for common tenant usage @ 3rd floor landingDetails
to comply with nov 201796681, item 3 - reconfigure closet wall and doors to create a code compliant trash enclosure for common tenant usage @ 3rd floor landing | $1,000 |
| Aug 2, 2018 | Completed final sign-off Sep 2018 | 3111 24th St | Meryl & Miller Llc | one bathroom & one kitchen remodel: replace bathroom floor, toilet. replace kitchen counters, sink, faucet & appliances. no new wall & no exist'g wall relocation. new lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & (k)5.Details
one bathroom & one kitchen remodel: replace bathroom floor, toilet. replace kitchen counters, sink, faucet & appliances. no new wall & no exist'g wall relocation. new lighting in kitchen & bathroom remodel shall comply w/cec 150.0(k)3 & (k)5. | $20,000 |
| Mar 1, 2010 | Completed final sign-off Mar 2010 | 3111 24th St | Aaa Restaurant Fire Control/Dba Aaa Fire | furnish & install (1) ansul r-102 fire system in the main kitchen area at ground floor.Details
furnish & install (1) ansul r-102 fire system in the main kitchen area at ground floor. | $4,000 |
| Feb 26, 2010 | Completed final sign-off Mar 2010 | 3111 24th St | Sterling Design | mechanical duct & hood. ref. appl. 200911181570. change of use under appl. 201002226889Details
mechanical duct & hood. ref. appl. 200911181570. change of use under appl. 201002226889 | $23,000 |
| Feb 22, 2010 | Expired or cancelled cancelled Jan 2026 | 3111 24th St | mechanical ducting and hood. ref. appl.#200911181570.Details
mechanical ducting and hood. ref. appl.#200911181570. | $23,000 | |
| Feb 22, 2010 | Completed final sign-off Apr 2010 | 3111 24th St | Sterling Design | reduce scope of work: p.a# 200911151570. mirrored plumbing for bathrooms. revision to storage area. non-load bearing wall removed in bakery area.Details
reduce scope of work: p.a# 200911151570. mirrored plumbing for bathrooms. revision to storage area. non-load bearing wall removed in bakery area. | |
| Nov 18, 2009 | Completed final sign-off Apr 2010 | 3111 24th St | Sterling Design | t.i.renovation of (e) ground floor retail grocery to retail butcher specialty groceries with new commrcial kitch. remove(e) store front dr/wdw and replace w/new store front system. upgrade entry and restroom to comply w/ ada compliance. reconfigure walls to accomodate refrigeration and kitchen.Details
t.i.renovation of (e) ground floor retail grocery to retail butcher specialty groceries with new commrcial kitch. remove(e) store front dr/wdw and replace w/new store front system. upgrade entry and restroom to comply w/ ada compliance. reconfigure walls to accomodate refrigeration and kitchen. | $110,000 |
| Nov 3, 2009 | Never finaled filed Nov 2009, never issued | 3111 24th St | Details
| $110,000 | |
| Jun 11, 2009 | Completed final sign-off Jul 2009 | 3111 24th St | Kinstan Home Solutions Inc. | reroofing.to comply with his nov# 200557230, dated 02/09/2005.Details
reroofing.to comply with his nov# 200557230, dated 02/09/2005. | $3,000 |
| Apr 11, 2008 | Completed final sign-off Apr 2008 | 3111 24th St | renew pa#200706154048 for final inspection.Details
renew pa#200706154048 for final inspection. | ||
| Jun 15, 2007 | Expired or cancelled expired Apr 2008 | 3111 24th St | sheetrock posting and painting, tile and general cleaning. replace damage gypsum ceiling with new, 2 layers. light fixture replacementDetails
sheetrock posting and painting, tile and general cleaning. replace damage gypsum ceiling with new, 2 layers. light fixture replacement | $8,000 | |
| Dec 7, 2005 | Completed final sign-off Dec 2005 | 3111 24th St | Archtech Design/Build | renew permit app no 200506286275 for final inspectionDetails
renew permit app no 200506286275 for final inspection | |
| Jun 28, 2005 | Never finaled issued Jun 2005, no final | 3111 24th St | Archtech Design/Build | remove & reinstall sheet rock in 6x8 storage per housing inspector write up.install new central heatDetails
remove & reinstall sheet rock in 6x8 storage per housing inspector write up.install new central heat | $3,000 |
| Mar 7, 2005 | Completed final sign-off Mar 2005 | 3111 24th St | Cal State Roofing Co Inc | reroofingDetails
reroofing | $9,000 |
| Jun 21, 2000 | Completed final sign-off Aug 2000 | 3111 24th St | repair back stair, remove & replace board,minor repair in kind, non structuralDetails
repair back stair, remove & replace board,minor repair in kind, non structural | $100 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Meryl & Miller Llc (5), Sterling Design (3), Archtech Design/Build (2), Flying Colors (2), Lee's Signs (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Aura Fire Safety Inc, Cal State Roofing Co Inc, Impact Restoration & Construction, Kinstan Home Solutions Inc., Pye-Barker Fire & Safety
- Architects
- Michael Baushke
- Designers
- Lee's Signs (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.