Block 7532, lot 003
279 Topaz Way
- City’s use
- Single Family Residential
- Built
- 1973
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,075 sq ft
- Lot
- 3,300 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 22, 2023 | In progress issued Nov 2023 | 279 Topaz Wy | Bay Building Structures Inc | excave crawlspace to become home gym, add window remodel (e) bath to add sauna, remove post, add steel beam, change (e) rear window to sliding door, add exterior railing.Details
excave crawlspace to become home gym, add window remodel (e) bath to add sauna, remove post, add steel beam, change (e) rear window to sliding door, add exterior railing. | $122,000 |
| Apr 7, 2023 | Never finaled issued Apr 2023, no final | 279 Topaz Wy | Bay Building Structures Inc | remodel of master bathroom, guest bathroom, powder roomDetails
remodel of master bathroom, guest bathroom, powder room | $30,000 |
| Jul 22, 2022 | Never finaled issued Jul 2022, no final | 279 Topaz Wy | Luminous Fire Alarm | install 9n) automatic fire sprinkler monitoring system f/a wire for circuits shall be class b. manual pull station located near facu or approval location. ceiling smoke detector located near facu. fire sprinkler riser included 2 butterfly valves.Details
install 9n) automatic fire sprinkler monitoring system f/a wire for circuits shall be class b. manual pull station located near facu or approval location. ceiling smoke detector located near facu. fire sprinkler riser included 2 butterfly valves. | $8,500 |
| Jul 22, 2022 | Completed final sign-off Apr 2023 | 279 Topaz Wy | Aura Fire Safety Inc | proposed overhead automatic fire sprinker ststem to be installed at second floor parking garage per approved plans. proposed 2" underground dedicated fire service to be installed per approved plans. 2" steel riser transitions to exposed 1 1/4 steel pipe below ceiling in garage transitioning to 1" brDetails
proposed overhead automatic fire sprinker ststem to be installed at second floor parking garage per approved plans. proposed 2" underground dedicated fire service to be installed per approved plans. 2" steel riser transitions to exposed 1 1/4 steel pipe below ceiling in garage transitioning to 1" br | $28,850 |
| Jul 8, 2021 | Expired or cancelled cancelled Jul 2024 | 279 Topaz Wy | Tesla Energy Operations | install/mount 27kwh energy storage system battery (2 powerwalls in garage; 28 kwh total energy); fire detection on separate permitDetails
install/mount 27kwh energy storage system battery (2 powerwalls in garage; 28 kwh total energy); fire detection on separate permit | $19,000 |
| Oct 31, 2018 | Completed final sign-off Jan 2019 | 279 Topaz Wy | Jemico Llc Dba Renewal By Andersen Of Sf | non visible from street: remove and replace 5 windows -fibrex-. same size same location. max ufactor .32Details
non visible from street: remove and replace 5 windows -fibrex-. same size same location. max ufactor .32 | $24,171 |
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 279 Topaz Wy | Caruzo's Roofing Company | reroofingDetails
reroofing | $5,500 |
| Nov 15, 2012 | Completed final sign-off Dec 2012 | 279 Topaz Wy | Bay Area Overhead Door Co. | garage door replacement in kind - metal construction.Details
garage door replacement in kind - metal construction. | $2,500 |
| Oct 5, 2012 | Completed final sign-off Nov 2012 | 279 Topaz Wy | Keen Construction Incorporated | front siding replacement approx 700 sq.ft.Details
front siding replacement approx 700 sq.ft. | $7,000 |
| May 7, 2012 | Completed final sign-off Jul 2012 | 279 Topaz Wy | Keen Construction Incorporated | kitchen and bath remodel: kitchen: replace cabinets, sink, appliances, flooring. bath: replace tile, toilet, shower fixtures & vanity. no wall reconfiguration.Details
kitchen and bath remodel: kitchen: replace cabinets, sink, appliances, flooring. bath: replace tile, toilet, shower fixtures & vanity. no wall reconfiguration. | $25,000 |
| Jun 21, 2011 | Completed final sign-off Aug 2011 | 279 Topaz Wy | American Home Renewal Inc | install hardi siding to back wall, not visable from the street. no structural changes, 1200 sq ft.Details
install hardi siding to back wall, not visable from the street. no structural changes, 1200 sq ft. | $18,000 |
| May 21, 2010 | Completed final sign-off Aug 2011 | 279 Topaz Wy | Allround Construction | new deck cantilevered 4' @ 2nd floor on (e) rear facade, accessed by sliding glass door. replacing windows 1 @ 2nd floor, 2 @ 1st floor. new bath & storage @ (e) 1st floor.Details
new deck cantilevered 4' @ 2nd floor on (e) rear facade, accessed by sliding glass door. replacing windows 1 @ 2nd floor, 2 @ 1st floor. new bath & storage @ (e) 1st floor. | $25,000 |
| Jan 14, 2010 | Completed final sign-off Mar 2010 | 279 Topaz Wy | Ybc Construction | voluntary lateral stiffening.Details
voluntary lateral stiffening. | $7,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Building Structures Inc (2), Keen Construction Incorporated (2), Allround Construction, American Home Renewal Inc, Aura Fire Safety Inc, Bay Area Overhead Door Co., Caruzo's Roofing Company, Jemico Llc Dba Renewal By Andersen Of Sf, Luminous Fire Alarm, Tesla Energy Operations, Ybc Construction
- Architects
- Troy Kashanipour
- Engineers
- Andy Forrest, Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.