Opi Commercial Builders
- Based in
- San Jose
- On San Francisco permits
- Nov 2013 to Jul 2025
- Last 24 months
- 6 permits filed
48 permits since 2000: 40 completed, 2 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 9 completed, 2 in progress, 1 never finaled. Typically 54 days from filing to permit and 377 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2025 | Completed final sign-off Jul 2025 | 2000 Mckinnon Av | bldg 427: revision to pa# 202411215509: removal of utility rm, exterior stair, & associated work from scope of work. update various detail & dimensions. no new fixtures.Details
bldg 427: revision to pa# 202411215509: removal of utility rm, exterior stair, & associated work from scope of work. update various detail & dimensions. no new fixtures. | |
| Nov 21, 2024 | In progress issued Jan 2025 | 2000 Mckinnon Av | construct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room.Details
construct exterior, on-grade concrete stairs and wood/steel frame protective canopy at a location on the south side of building 427, remodel 2 toilet rooms, install new high/low drinking fountain, construct new/future transformer room. | $180,000 |
| Dec 1, 2023 | In progress issued Jan 2024 | 2000 Mckinnon Av | revision to pa# 202208291437, changes include: construction 2 accessible entry elements consisting of an accessible ramp, stair, associated parking & striping and wood canopy, 3 new exit stairs, show existing walls, no longer being removed per pa# 202311271423.Details
revision to pa# 202208291437, changes include: construction 2 accessible entry elements consisting of an accessible ramp, stair, associated parking & striping and wood canopy, 3 new exit stairs, show existing walls, no longer being removed per pa# 202311271423. | |
| Nov 27, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | revision to 202207158554 and 202309146596. change includes existinng interior demising wall to remain along grid line 110. existing stairs and ramps to remain, sheet notes revisedDetails
revision to 202207158554 and 202309146596. change includes existinng interior demising wall to remain along grid line 110. existing stairs and ramps to remain, sheet notes revised | |
| Nov 27, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | bldg 428: revision 202207158556 and 202304196060. changes include existing stairs and ramp to remain. sheet notes revised. extent of asphalt being removed updated. ab-017Details
bldg 428: revision 202207158556 and 202304196060. changes include existing stairs and ramp to remain. sheet notes revised. extent of asphalt being removed updated. ab-017 | |
| Apr 19, 2023 | Completed final sign-off Dec 2024 | 2000 Mckinnon Av | revision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy.Details
revision to 202208291441. reduce scope to 1 new accessible entry element, consisting of accessible ramp, stair, asociated accessible parking and striping, wood canopy. | |
| Aug 29, 2022 | Never finaled issued Jun 2023, no final | 2000 Mckinnon Av | bldg 427: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades.Details
bldg 427: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades. | $450,000 |
| Aug 29, 2022 | Completed final sign-off Mar 2025 | 2000 Mckinnon Av | bldg 428: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. four (4) new exit stairs will be constructed. structural upgrades.Details
bldg 428: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. four (4) new exit stairs will be constructed. structural upgrades. | $450,000 |
| Apr 1, 2022 | Completed final sign-off May 2023 | 2142 Jerrold Av | interior core & shell- new non-load bearing partitions, new mezzanine, and internal stairs. new ceiling, light fixtures, and restrooms. ti under seperate permit.Details
interior core & shell- new non-load bearing partitions, new mezzanine, and internal stairs. new ceiling, light fixtures, and restrooms. ti under seperate permit. | $1,000,000 |
| Aug 27, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgradesDetails
building 417: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. two (2) new exit stairs will be constructed. structural upgrades | $450,000 |
| Aug 27, 2020 | Completed final sign-off Aug 2022 | 749 Toland St | building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and stripDetails
building 418: construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and striping, and wood canopy. construction of one (1) new accessible entry element, consisting of accessible ramp, stair, associated accessible parking and strip | $450,000 |
| Oct 6, 2016 | Completed final sign-off Oct 2019 | 295 Bay St | revision to pa#201602119416, add exterior metal canopies at retail entry & drop-off location, extend (e) covered exterior hallway along side of bldg. enclouse (e) stair between g/f retail & 2/f office, add new (111) door between lobby & office. n/a ordinance #155-13Details
revision to pa#201602119416, add exterior metal canopies at retail entry & drop-off location, extend (e) covered exterior hallway along side of bldg. enclouse (e) stair between g/f retail & 2/f office, add new (111) door between lobby & office. n/a ordinance #155-13 | $38,000 |