Permit GraphShortlistSan Francisco building permits since 2000

Rod Heisler Construction

Contractor license
992421
State license record
Based in
Oakland
On San Francisco permits
Nov 2010 to Sep 2026
Last 24 months
13 permits filed

156 permits since 2000: 86 completed, 13 in progress, 39 never finaled, 18 expired or cancelled.

Of the 39 never-finaled permits, 9 are 3 to 5 years old, 11 are 5 to 10 years old, 19 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Kitchen remodel permits

AllRoof deck 1Deck 3Stairs 12Kitchen remodel 9Bathroom remodel 17

9 kitchen remodel permits: 5 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 31 days from filing to permit and 399 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 26, 2026In progress
issued Sep 2026
195 San Leandro Wypool removal & interior remodel to (e) second kitchen.
Details
Permit
202608267185
Permit issued
Sep 23, 2026

pool removal & interior remodel to (e) second kitchen.

Open the permit page

$70,000
Dec 14, 2021Expired or cancelled
cancelled Jan 2026
1835 Franklin Stextg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind into
Details
Permit
202112144393

extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind into

Open the permit page

$350,000
Sep 30, 2020Expired or cancelled
cancelled Apr 2025
3240 Divisadero Stvertical addition and remodel of unit 3942, remodel and expansion of unit 3240 in garage level. renovation of all kitchens and baths. add baths and bedrooms. add elevator and replace stairs. replace windows, gate, garage door.
Details
Permit
202009305580
Permit issued
Feb 27, 2024

vertical addition and remodel of unit 3942, remodel and expansion of unit 3240 in garage level. renovation of all kitchens and baths. add baths and bedrooms. add elevator and replace stairs. replace windows, gate, garage door.

Open the permit page

$550,000
Oct 17, 2018Completed
final sign-off Sep 2019
217 Chestnut Stremodel (e) kitchen & bathrooms in (e) units. replace (e) single pane windows with double pane. addition of conditioned space in garage. replace (e) siding on rear elevation with stucco.
Details
Permit
201810173425
Permit issued
Nov 14, 2018
Final sign-off
Sep 9, 2019

remodel (e) kitchen & bathrooms in (e) units. replace (e) single pane windows with double pane. addition of conditioned space in garage. replace (e) siding on rear elevation with stucco.

Open the permit page

$100,000
Feb 1, 2018Completed
final sign-off Aug 2018
2341 Chestnut St#104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom.
Details
Permit
201802010124
Permit issued
Feb 1, 2018
Final sign-off
Aug 22, 2018

#104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom.

Open the permit page

$15,000
Nov 2, 2016Completed
final sign-off May 2018
2970 Jackson Staddition of living space within 1st flr -to include new guest rm suite, family rm, off & new interior stairs to 2nd flr. &garage. reconfigure 2nd flr kitchen & 3rd flr master bedrm. exterior work - new doors & windows in (e) breezeway. basement level foundation approved under pa# 201606079 maher na
Details
Permit
201611021775
Permit issued
Nov 22, 2016
Final sign-off
May 2, 2018

addition of living space within 1st flr -to include new guest rm suite, family rm, off & new interior stairs to 2nd flr. &garage. reconfigure 2nd flr kitchen & 3rd flr master bedrm. exterior work - new doors & windows in (e) breezeway. basement level foundation approved under pa# 201606079 maher na

Open the permit page

$331,879
Apr 21, 2016Completed
final sign-off Aug 2018
2341 Chestnut Stunit legalization ord 43-14. upgrade(e)g/f dwg unit #17a into legalized dwg unit.new fire rated walls, new interior partitions, new doors, new window, new kitchen, new bath, new cabinets, fixtures, appliances, new electrical, plumbing under separate permit.(maher ord-extended n/a)
Details
Permit
201604215342
Permit issued
Jun 29, 2017
Final sign-off
Aug 3, 2018

unit legalization ord 43-14. upgrade(e)g/f dwg unit #17a into legalized dwg unit.new fire rated walls, new interior partitions, new doors, new window, new kitchen, new bath, new cabinets, fixtures, appliances, new electrical, plumbing under separate permit.(maher ord-extended n/a)

Open the permit page

$44,000
Nov 16, 2015Completed
final sign-off Aug 2018
2341 Chestnut Stpursuant to sf planning code section 207, the project proposes to upgrade 2 of 3 (e) ground floor units to legalized accessory dwelling units. the work includes new fire rated walls, doors, windows, along with new interior partitions, kitchens & baths. ** maher: n/a ** sprinkler deferred
Details
Permit
201511162762
Permit issued
Jun 30, 2017
Final sign-off
Aug 3, 2018

pursuant to sf planning code section 207, the project proposes to upgrade 2 of 3 (e) ground floor units to legalized accessory dwelling units. the work includes new fire rated walls, doors, windows, along with new interior partitions, kitchens & baths. ** maher: n/a ** sprinkler deferred

Open the permit page

$45,000
Jun 4, 2014Never finaled
issued Jul 2014, no final
2331 Jackson Stscope of work includes upgdated foundation and excavation in lower level. renovate e kitchen, baths, bedrooms, master suite. new and replacement windows and doors and new garden court at front of house to replace e 2nd driveway.
Details
Permit
201406047448
Permit issued
Jul 8, 2014

scope of work includes upgdated foundation and excavation in lower level. renovate e kitchen, baths, bedrooms, master suite. new and replacement windows and doors and new garden court at front of house to replace e 2nd driveway.

Open the permit page

$343,140