Rod Heisler Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 13 permits filed
156 permits since 2000: 86 completed, 13 in progress, 39 never finaled, 18 expired or cancelled.
Of the 39 never-finaled permits, 9 are 3 to 5 years old, 11 are 5 to 10 years old, 19 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 72 days from filing to permit and 367 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2026 | Completed final sign-off Oct 2026 | 2331 Jackson St | rev 202405142066: g/f bathroom remodel with new sauna.replace (e) rear deck tile and rails.new tile at g/f entry. remove from scope: 122sf horiz addition at 2/f w/i (e). lower driveway elevation by excavaationg 18cy,replace (e) juliet balcony. add new 30x36in roof hatch.Details
rev 202405142066: g/f bathroom remodel with new sauna.replace (e) rear deck tile and rails.new tile at g/f entry. remove from scope: 122sf horiz addition at 2/f w/i (e). lower driveway elevation by excavaationg 18cy,replace (e) juliet balcony. add new 30x36in roof hatch. | |
| Jun 12, 2024 | Completed final sign-off Oct 2026 | 2331 Jackson St | 122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch.Details
122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch. | $415,000 |
| Apr 5, 2021 | Never finaled issued Jun 2021, no final | 4020 23rd St | repair dryrot and painting on the exterior. replacement of deteriorating decking and railing at rear at 2 levels. all construction is (e). no new work proposed.Details
repair dryrot and painting on the exterior. replacement of deteriorating decking and railing at rear at 2 levels. all construction is (e). no new work proposed. | $75,000 |