Back to bathroom remodel contractors
Rod Heisler Construction
- Based in
- Oakland
- On San Francisco permits
- Nov 2010 to Sep 2026
- Last 24 months
- 13 permits filed
155 permits since 2000: 84 completed, 16 in progress, 37 never finaled, 18 expired or cancelled.
Of the 37 never-finaled permits, 7 are 3 to 5 years old, 12 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 10 completed, 3 in progress, 2 never finaled, 2 expired or cancelled. Typically 34 days from filing to permit and 250 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2026 | In progress issued Jul 2026 | 2331 Jackson St | rev 202405142066: g/f bathroom remodel with new sauna.replace (e) rear deck tile and rails.new tile at g/f entry. remove from scope: 122sf horiz addition at 2/f w/i (e). lower driveway elevation by excavaationg 18cy,replace (e) juliet balcony. add new 30x36in roof hatch.Details
rev 202405142066: g/f bathroom remodel with new sauna.replace (e) rear deck tile and rails.new tile at g/f entry. remove from scope: 122sf horiz addition at 2/f w/i (e). lower driveway elevation by excavaationg 18cy,replace (e) juliet balcony. add new 30x36in roof hatch. | |
| Apr 22, 2025 | In progress issued Apr 2026 | 3001 Pacific Av | interior remodel(e)5-story sfr w/10-bedrooms, 6-full baths and 8-half baths w/new roof terrace @(e)roof lvl, horizontal addition of new single story w/roof terrace. interior remodel to(e) 1-story detached garage to include new interior pool. new count to be 7-bedrooms, 8-full baths and 4-half baths.Details
interior remodel(e)5-story sfr w/10-bedrooms, 6-full baths and 8-half baths w/new roof terrace @(e)roof lvl, horizontal addition of new single story w/roof terrace. interior remodel to(e) 1-story detached garage to include new interior pool. new count to be 7-bedrooms, 8-full baths and 4-half baths. | $2,500,000 |
| Jun 12, 2024 | In progress issued Feb 2025 | 2331 Jackson St | 122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch.Details
122-sqft horizontal addition @ 2/f within (e) roof outline, lower driveway elevation by excavating 18-cu yards, ground flr bathroom remodel, replace (e) rear deck tile and guardrails, reaplce (e) rear juliet balcony, add new 30x36 roof hatch. | $415,000 |
| Dec 14, 2021 | Expired or cancelled cancelled Jan 2026 | 1835 Franklin St | extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind intoDetails
extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind into | $350,000 |
| Nov 22, 2021 | Completed final sign-off May 2022 | 4 Clarence Pl | remodel (3) bathrooms in kind on 1st and 2nd floors in kind replacement of light fixtures. carpet installation at conference room.Details
remodel (3) bathrooms in kind on 1st and 2nd floors in kind replacement of light fixtures. carpet installation at conference room. | $65,000 |
| Apr 16, 2021 | Completed final sign-off Oct 2021 | 1534 35th Av | bathroom in garage storage area. all work inside building foot print.Details
bathroom in garage storage area. all work inside building foot print. | $25,000 |
| Sep 30, 2020 | Expired or cancelled cancelled Apr 2025 | 3240 Divisadero St | vertical addition and remodel of unit 3942, remodel and expansion of unit 3240 in garage level. renovation of all kitchens and baths. add baths and bedrooms. add elevator and replace stairs. replace windows, gate, garage door.Details
vertical addition and remodel of unit 3942, remodel and expansion of unit 3240 in garage level. renovation of all kitchens and baths. add baths and bedrooms. add elevator and replace stairs. replace windows, gate, garage door. | $550,000 |
| Mar 11, 2020 | Completed final sign-off Dec 2021 | 1412 Van Ness Av | 9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services.Details
9459 sq ft interior only. t.i @ 1st floor only. ada comliant bathrooms and changing rooms, modification of existing lighting mechanical, electrical, and plumbing interior finishes. chnage of use from design school back to retail space and services. | $650,000 |
| Oct 17, 2018 | Completed final sign-off Sep 2019 | 217 Chestnut St | remodel (e) kitchen & bathrooms in (e) units. replace (e) single pane windows with double pane. addition of conditioned space in garage. replace (e) siding on rear elevation with stucco.Details
remodel (e) kitchen & bathrooms in (e) units. replace (e) single pane windows with double pane. addition of conditioned space in garage. replace (e) siding on rear elevation with stucco. | $100,000 |
| Feb 1, 2018 | Completed final sign-off Aug 2018 | 2341 Chestnut St | #104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom.Details
#104: renovation of (e) kitchen & bathrooms, floor & paint. replacement of cabinets in kitchen & tile in bathroom. | $15,000 |
| May 2, 2017 | Completed final sign-off Aug 2017 | 2519 Pierce St | garage level (1st floor) - renovate (e) bathroom, including replace (e) toilet, relocate shower controls, replace finishes. renovate (e) laundry room to include (n) cabinetry & finishes. new tile flooring throughout, electrical & plumbing work as required.Details
garage level (1st floor) - renovate (e) bathroom, including replace (e) toilet, relocate shower controls, replace finishes. renovate (e) laundry room to include (n) cabinetry & finishes. new tile flooring throughout, electrical & plumbing work as required. | $25,000 |
| Jul 28, 2016 | Never finaled issued Aug 2016, no final | 1020 Chestnut St | 3rd flr: interior - demo (e) non bearing interior partitions; remodel (e) fireplace surround, new recessed lighting in living & dining rooms, configure guest bathroom and bathroom layout, new skylight in guest bath. exterior: replace rear windows and doors at balcony; railing to be replaced.Details
3rd flr: interior - demo (e) non bearing interior partitions; remodel (e) fireplace surround, new recessed lighting in living & dining rooms, configure guest bathroom and bathroom layout, new skylight in guest bath. exterior: replace rear windows and doors at balcony; railing to be replaced. | $41,500 |
| Apr 21, 2016 | Completed final sign-off Aug 2018 | 2341 Chestnut St | unit legalization ord 43-14. upgrade(e)g/f dwg unit #17a into legalized dwg unit.new fire rated walls, new interior partitions, new doors, new window, new kitchen, new bath, new cabinets, fixtures, appliances, new electrical, plumbing under separate permit.(maher ord-extended n/a)Details
unit legalization ord 43-14. upgrade(e)g/f dwg unit #17a into legalized dwg unit.new fire rated walls, new interior partitions, new doors, new window, new kitchen, new bath, new cabinets, fixtures, appliances, new electrical, plumbing under separate permit.(maher ord-extended n/a) | $44,000 |
| Nov 16, 2015 | Completed final sign-off Aug 2018 | 2341 Chestnut St | pursuant to sf planning code section 207, the project proposes to upgrade 2 of 3 (e) ground floor units to legalized accessory dwelling units. the work includes new fire rated walls, doors, windows, along with new interior partitions, kitchens & baths. ** maher: n/a ** sprinkler deferredDetails
pursuant to sf planning code section 207, the project proposes to upgrade 2 of 3 (e) ground floor units to legalized accessory dwelling units. the work includes new fire rated walls, doors, windows, along with new interior partitions, kitchens & baths. ** maher: n/a ** sprinkler deferred | $45,000 |
| May 12, 2015 | Completed final sign-off Nov 2016 | 2331 Jackson St | update carriage house exterior at rear yard: roof repair, remodel interior to include 1/2 bath, bar sink. window replacement with miscellaneous new window and door openings. mech, plumb, elec, deferred. maher not reqDetails
update carriage house exterior at rear yard: roof repair, remodel interior to include 1/2 bath, bar sink. window replacement with miscellaneous new window and door openings. mech, plumb, elec, deferred. maher not req | $48,349 |
| Jun 4, 2014 | Never finaled issued Jul 2014, no final | 2331 Jackson St | scope of work includes upgdated foundation and excavation in lower level. renovate e kitchen, baths, bedrooms, master suite. new and replacement windows and doors and new garden court at front of house to replace e 2nd driveway.Details
scope of work includes upgdated foundation and excavation in lower level. renovate e kitchen, baths, bedrooms, master suite. new and replacement windows and doors and new garden court at front of house to replace e 2nd driveway. | $343,140 |
| May 7, 2014 | Completed final sign-off Nov 2014 | 701 Scott St | remodel master bathroom, no structural changes, install plywood walls @ crawl space, 120 linear feet.Details
remodel master bathroom, no structural changes, install plywood walls @ crawl space, 120 linear feet. | $10,000 |