Ryan Golenberg
- License
- C42564
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Dialogue Studio
- On San Francisco permits
- Jul 2026 to Nov 2026
4 permits since 2000 (architect on 4 permits): 4 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Barrett Karber Built Llc (2), Lindquist Custom Construction Inc, Perez Construction Co
- Engineers
- Dustin Muhn (2), Dustin Muhn Parker
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 20, 2026 | In progress filed Nov 2026, not yet issued | 2001 Pacific Av | Barrett Karber Built Llc | revision to pa# 202608136518: revisions limited to 1/f stair & 2/f ceiling framing.Details
revision to pa# 202608136518: revisions limited to 1/f stair & 2/f ceiling framing. | $40,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 320 San Leandro Wy | Perez Construction Co | converting (e) space at garage level to creat a new adu. new door and in-kind window replacement in front; new balcony and window in rear; new foundations, structural framing and shear design. project is subject to ab112 all-electric ordinance.Details
converting (e) space at garage level to creat a new adu. new door and in-kind window replacement in front; new balcony and window in rear; new foundations, structural framing and shear design. project is subject to ab112 all-electric ordinance. | $755,000 |
| Aug 13, 2026 | In progress issued Aug 2026 | 2001 Pacific Av | Barrett Karber Built Llc | interior remodel within e) building footprint, including limited structural work, exterior window, door replancement, and n) kitchen & bathroom fixtures and layoutDetails
interior remodel within e) building footprint, including limited structural work, exterior window, door replancement, and n) kitchen & bathroom fixtures and layout | $400,000 |
| Jul 17, 2026 | In progress issued Sep 2026 | 169 Brompton Av | Lindquist Custom Construction Inc | interior remodel within (e) building. no exterior scope. includes limited structural for voluntary strengthening upgrades.Details
interior remodel within (e) building. no exterior scope. includes limited structural for voluntary strengthening upgrades. | $200,000 |