Steele Properties
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jul 2026
- Last 24 months
- 22 permits filed
81 permits since 2000: 67 completed, 11 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | Completed final sign-off Jul 2026 | 1051 De Haro St | repair only less then 50% front and rear deck and stairs in kind. comply with nov# 202656096.Details
repair only less then 50% front and rear deck and stairs in kind. comply with nov# 202656096. | $5,000 |
| Jun 16, 2026 | In progress issued Jun 2026 | 129 Fair Oaks St | front building. unit# 2. kitchen remodel in kind. no structural. 110 sq. ft.Details
front building. unit# 2. kitchen remodel in kind. no structural. 110 sq. ft. | $20,000 |
| Jun 16, 2026 | Completed final sign-off Jul 2026 | 1132 Pacific Av | rear stair repair less than 50%. like for likeDetails
rear stair repair less than 50%. like for like | $6,000 |
| May 26, 2026 | In progress issued May 2026 | 26 Farnum St | voluntary strengthening: foundation bolting - install 5/8" epoxy-set anchor bolts with 3"x3" plate washer @ 32" o.c. min embedment 12" into existing concrete foundation per sfdbi standard details.Details
voluntary strengthening: foundation bolting - install 5/8" epoxy-set anchor bolts with 3"x3" plate washer @ 32" o.c. min embedment 12" into existing concrete foundation per sfdbi standard details. | $14,000 |
| May 26, 2026 | Completed final sign-off Jun 2026 | 3469 Jackson St | repair side stairs and rear deck on 2nd floor, less than 50% repairs.Details
repair side stairs and rear deck on 2nd floor, less than 50% repairs. | $8,000 |
| May 5, 2026 | In progress issued May 2026 | 129 Fair Oaks St | unit #2 (front building): bathroom remodel in kind, no structural.Details
unit #2 (front building): bathroom remodel in kind, no structural. | $15,000 |
| May 5, 2026 | In progress issued May 2026 | 26 Farnum St | kitchen and bathrooms remodel in kind, no structural.Details
kitchen and bathrooms remodel in kind, no structural. | $55,000 |
| Jan 29, 2026 | In progress issued Mar 2026 | 17 Jordan Av | revision to permit 202501309370. create (1) new dormer at roof.Details
revision to permit 202501309370. create (1) new dormer at roof. | $25,000 |
| Oct 29, 2025 | Completed final sign-off Jun 2026 | 3721 Webster St | revision to 202509175489: grade beam added at #6 & #10Details
revision to 202509175489: grade beam added at #6 & #10 | $10,000 |
| Oct 29, 2025 | In progress filed Oct 2025, not yet issued | 295 19th Av | commencement of work not started under previously approved permit pa# 202405222722 (repair dryrot in rear staircase less than 50%. replace mailbox in kind.)Details
commencement of work not started under previously approved permit pa# 202405222722 (repair dryrot in rear staircase less than 50%. replace mailbox in kind.) | $500 |
| Sep 17, 2025 | Completed final sign-off Jun 2026 | 3721 Webster St | remodel (e) ground floor bathroom and wet bar in kind. no wall removal or layout changeDetails
remodel (e) ground floor bathroom and wet bar in kind. no wall removal or layout change | $45,000 |
| Sep 17, 2025 | Completed final sign-off Jun 2026 | 3721 Webster St | structural stregthning of (e) conditions at the 1st floor level. not a gravity design or seismic design of the property . no change to front elevationDetails
structural stregthning of (e) conditions at the 1st floor level. not a gravity design or seismic design of the property . no change to front elevation | $60,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 259 Clinton Pk | remodel kitchen in kind.Details
remodel kitchen in kind. | $25,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 1231 02nd Av | remodel kitchen, bath, powder in kind.Details
remodel kitchen, bath, powder in kind. | $60,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 1229 02nd Av | remodel kitchen, bath, powder in kind.Details
remodel kitchen, bath, powder in kind. | $60,000 |
| Mar 26, 2025 | Completed final sign-off Jul 2025 | 259 Clinton Pk | repair rear deck and firewall in kind. (existing) less than 50% repairDetails
repair rear deck and firewall in kind. (existing) less than 50% repair | $10,000 |
| Mar 3, 2025 | In progress issued Jun 2025 | 17 Jordan Av | connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition..Details
connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition.. | $1,000,000 |
| Jan 27, 2025 | Completed final sign-off Feb 2025 | 38 Belvedere St | to obtain final inspection for work approved under pa# 201811276716. all work is complete.Details
to obtain final inspection for work approved under pa# 201811276716. all work is complete. | |
| Jan 27, 2025 | Completed final sign-off Feb 2025 | 38 Belvedere St | to obtain final inspection for work approved under pa# 201904248834. all work is complete.Details
to obtain final inspection for work approved under pa# 201904248834. all work is complete. | |
| Jan 8, 2025 | Completed final sign-off Apr 2025 | 735 10th Av | repair rear deck less than 50%Details
repair rear deck less than 50% | $4,000 |
| Nov 22, 2024 | Completed final sign-off Sep 2025 | 263 Clinton Pk | kitchen and bathroom remodel in kindDetails
kitchen and bathroom remodel in kind | $65,000 |
| Nov 22, 2024 | Completed final sign-off Mar 2025 | 263 Clinton Pk | replace rear staircase less than 50%Details
replace rear staircase less than 50% | $4,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes.Details
unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes. | $120,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | unit 220: expand existing catwalk by 2' 1"Details
unit 220: expand existing catwalk by 2' 1" | $10,000 |
| Jul 26, 2024 | Completed final sign-off Jan 2025 | 1134 Pacific Av | remodel kitchen & bath no structural.Details
remodel kitchen & bath no structural. | $65,000 |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 38 Belvedere St | unit 1: remodel kitchen and bath. no structuralDetails
unit 1: remodel kitchen and bath. no structural | $45,000 |
| May 22, 2024 | In progress issued May 2024 | 295 19th Av | repair dryrot in rear staircase less than 50%. replace mailbox in kind.Details
repair dryrot in rear staircase less than 50%. replace mailbox in kind. | $6,000 |
| Apr 23, 2024 | In progress issued Dec 2024 | 2586 32nd Av | interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e)Details
interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e) | $250,000 |
| Apr 12, 2024 | Completed final sign-off Mar 2025 | 129 Fair Oaks St | unit #5 - replace bathtub & vanity only. no structural alteration.Details
unit #5 - replace bathtub & vanity only. no structural alteration. | $6,000 |
| Mar 1, 2024 | Completed final sign-off Apr 2024 | 1211 38th Av | to comply with nov# 202289119: repair dryrot on rear deck as needed. 50% of deck. no alterations.Details
to comply with nov# 202289119: repair dryrot on rear deck as needed. 50% of deck. no alterations. | $6,000 |
| Nov 6, 2023 | Completed final sign-off Jan 2025 | 1804 Clement St | replace one front door with 36" door in kind. no structural.Details
replace one front door with 36" door in kind. no structural. | $6,000 |
| Nov 6, 2023 | Completed final sign-off Sep 2024 | 38 Belvedere St | unit 5 bath remodel. add to 202304034944. replace furnace in kindDetails
unit 5 bath remodel. add to 202304034944. replace furnace in kind | $15,000 |
| Apr 3, 2023 | Completed final sign-off Feb 2025 | 1901 Golden Gate Av | kitchen bath remodel: no structural alterations in kindDetails
kitchen bath remodel: no structural alterations in kind | $40,000 |
| Apr 3, 2023 | Completed final sign-off Sep 2024 | 38 Belvedere St | unit 5: kitchen remodel: no structural alterationsDetails
unit 5: kitchen remodel: no structural alterations | $25,000 |
| Jan 20, 2023 | Completed final sign-off May 2024 | 129 Fair Oaks St | unit 4: kitchen & bath remodel; correction notice 202302010 no structural alterationDetails
unit 4: kitchen & bath remodel; correction notice 202302010 no structural alteration | $30,000 |
| Apr 5, 2022 | Completed final sign-off Feb 2023 | 125 Fair Oaks St | (unit 125 fair oaks rear building) replace kitchen cabinets with same layoutDetails
(unit 125 fair oaks rear building) replace kitchen cabinets with same layout | $10,000 |
| Jan 19, 2022 | Completed final sign-off Feb 2022 | 178 28th St | sheetrock over existing interior finish, all rooms, cosmetic only with permit #202108257143.Details
sheetrock over existing interior finish, all rooms, cosmetic only with permit #202108257143. | $5,000 |
| Aug 25, 2021 | Completed final sign-off Feb 2022 | 178 28th St | remodel kitchen and install new furnace in 178 28th stDetails
remodel kitchen and install new furnace in 178 28th st | $35,000 |
| Dec 5, 2019 | Completed final sign-off Jun 2020 | 1295 47th Av | unit # 7: remodel kitchen and bathroom. no structural work under this permit.Details
unit # 7: remodel kitchen and bathroom. no structural work under this permit. | $40,000 |
| Jun 17, 2019 | Completed final sign-off Jun 2020 | 1295 47th Av | rev to pa201805118890: partition layout changes at first floor units (9/10/11). change in window type from aluminium clad to aluminum. add bedrooms for units 9/10/11.Details
rev to pa201805118890: partition layout changes at first floor units (9/10/11). change in window type from aluminium clad to aluminum. add bedrooms for units 9/10/11. | |
| Jun 17, 2019 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | rev to pa#201703091131: partition wall layout revisions. change of 2 (two) hour rated passageway to 1 (one) hour rated passageway for egress.Details
rev to pa#201703091131: partition wall layout revisions. change of 2 (two) hour rated passageway to 1 (one) hour rated passageway for egress. | |
| May 16, 2019 | Completed final sign-off Nov 2019 | 1295 47th Av | unit 1 - replacing cabinets (kitchen); retiling bathroomDetails
unit 1 - replacing cabinets (kitchen); retiling bathroom | $20,000 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 38 Belvedere St | kitchen remodel only. replace kitchen cabinets and counter tops. all work unit number 6.Details
kitchen remodel only. replace kitchen cabinets and counter tops. all work unit number 6. | $25,000 |
| Nov 27, 2018 | Completed final sign-off May 2019 | 1674 Filbert St | remove partial deck per nov #201898451. remove roof deckDetails
remove partial deck per nov #201898451. remove roof deck | $3,000 |
| Nov 7, 2018 | Completed final sign-off Jul 2019 | 1031 Scott St | revision to pa 201707313393. details on lightwells, stairs and retaining wallDetails
revision to pa 201707313393. details on lightwells, stairs and retaining wall | |
| Oct 25, 2018 | Completed final sign-off Nov 2019 | 1295 47th Av | unit 8: replace kitchen cabinets and counters onlyDetails
unit 8: replace kitchen cabinets and counters only | $10,000 |
| Oct 25, 2018 | Completed final sign-off Jun 2019 | 1039 Scott St | unit b: replace kitchen cabinets and counters onlyDetails
unit b: replace kitchen cabinets and counters only | $10,000 |
| May 11, 2018 | Completed final sign-off Jun 2020 | 1295 47th Av | additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces.Details
additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces. | $175,000 |
| Aug 24, 2017 | Never finaled issued Dec 2018, no final | 1913 Golden Gate Av | add unit per ord #162-16. convert single car garage to 2 bedroom, 1 bath dwelling unit and roof deck.Details
add unit per ord #162-16. convert single car garage to 2 bedroom, 1 bath dwelling unit and roof deck. | $75,000 |
| Jul 31, 2017 | Completed final sign-off May 2019 | 1337 Page St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $60,000 |
| Jul 31, 2017 | Completed final sign-off Jul 2019 | 1031 Scott St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $60,000 |
| Jun 28, 2017 | Completed final sign-off Jul 2019 | 1031 Scott St | add (3) units at 1st floor per ord. 162-16. add doors & windows at front and rear. sprinklers per nfpa 13. ** maher: n/a **Details
add (3) units at 1st floor per ord. 162-16. add doors & windows at front and rear. sprinklers per nfpa 13. ** maher: n/a ** | $175,000 |
| Jun 23, 2017 | Completed final sign-off Jun 2019 | 1031 Scott St | unit #a: replace cabinets in kitchen, do not open walls.Details
unit #a: replace cabinets in kitchen, do not open walls. | $15,000 |
| Mar 29, 2017 | Completed final sign-off Oct 2018 | 38 Belvedere St | revision to 201605167509: as built condition drawings per field reqDetails
revision to 201605167509: as built condition drawings per field req | |
| Mar 9, 2017 | Completed final sign-off Jul 2019 | 129 Fair Oaks St | seismic retrofit of 1st fl to comply with mandatory seismic retrofit program for wood frame building ordinance using iebc chapter a4Details
seismic retrofit of 1st fl to comply with mandatory seismic retrofit program for wood frame building ordinance using iebc chapter a4 | $60,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122.Details
convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122. | $150,000 |
| Aug 22, 2016 | Completed final sign-off Aug 2017 | 38 Belvedere St | install 2 furnaces(gas) in unit 3 and unit 4 including duct and vent. replacing old system.Details
install 2 furnaces(gas) in unit 3 and unit 4 including duct and vent. replacing old system. | $24,000 |
| Aug 22, 2016 | Completed final sign-off Sep 2018 | 38 Belvedere St | repair to stairs in lightwell, less than 50% or lessDetails
repair to stairs in lightwell, less than 50% or less | $5,000 |
| Jun 3, 2016 | Completed final sign-off Jun 2018 | 1674 Filbert St | add stairs to roof, extend (e) stairs to parapet.Details
add stairs to roof, extend (e) stairs to parapet. | $15,000 |
| May 17, 2016 | Completed final sign-off Sep 2018 | 1696 Page St | kitchen & bath remodel at 1696 page st. no walls removed or added.Details
kitchen & bath remodel at 1696 page st. no walls removed or added. | $45,000 |
| May 17, 2016 | Completed final sign-off Dec 2016 | 38 Belvedere St | kitchen & bath remodel. unit 3 & 4. no walls removal or added.Details
kitchen & bath remodel. unit 3 & 4. no walls removal or added. | $70,000 |
| May 16, 2016 | Completed final sign-off Oct 2018 | 38 Belvedere St | soft story strengthening fo ground/storage level for iebc 2012 appendix a-4 per sfbc chapter 34b.Details
soft story strengthening fo ground/storage level for iebc 2012 appendix a-4 per sfbc chapter 34b. | $30,000 |
| May 13, 2016 | Completed final sign-off Oct 2018 | 38 Belvedere St | per ordinances 30-15. 1st floor unit addition/alteration, demo storage space, provide one studio apartment, and one 2 bedrooms apartment. work done in conjunction w/ seismic strengthening separate permit under pa# 2016/05/16/7509.Details
per ordinances 30-15. 1st floor unit addition/alteration, demo storage space, provide one studio apartment, and one 2 bedrooms apartment. work done in conjunction w/ seismic strengthening separate permit under pa# 2016/05/16/7509. | $350,000 |
| Aug 7, 2015 | Completed final sign-off Jul 2016 | 1674 Filbert St | revision to permit appn. 201407282259; work shown qualifies under chapter 34b for mandatory earthquake retrofit of wood framed buildings, cost of soft story $54000 cost of unit renovation $181,000.00; (soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4)Details
revision to permit appn. 201407282259; work shown qualifies under chapter 34b for mandatory earthquake retrofit of wood framed buildings, cost of soft story $54000 cost of unit renovation $181,000.00; (soft story retrofit per sfbc ch 34b; 2012 iebc appendix a-4) | |
| Jun 1, 2015 | Completed final sign-off Jul 2016 | 1674 Filbert St | add single three bedroom dwelling unit at first floor. additrional dwelling unit under ordinance 30-15. seismic work per cbc section 34b under permit #201504214255.Details
add single three bedroom dwelling unit at first floor. additrional dwelling unit under ordinance 30-15. seismic work per cbc section 34b under permit #201504214255. | $150,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2016 | 1674 Filbert St | revision to 201407282259 to reduce scope of work. modify as approved drawings at units 1,4,5. modify gr level to lateral structural work only. modify bathrooms above and retain orig walls at bedroom and dining room. elimated proposed 2nd bathroom.Details
revision to 201407282259 to reduce scope of work. modify as approved drawings at units 1,4,5. modify gr level to lateral structural work only. modify bathrooms above and retain orig walls at bedroom and dining room. elimated proposed 2nd bathroom. | |
| Jul 22, 2014 | Completed final sign-off Nov 2014 | 295 19th Av | at unit #5, remodel kitchen & bathroom.Details
at unit #5, remodel kitchen & bathroom. | $25,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2015 | 1903 Golden Gate Av | kitchen & bath remodel in unit 1903 golden gate ave.Details
kitchen & bath remodel in unit 1903 golden gate ave. | $30,000 |
| Sep 12, 2013 | Completed final sign-off Aug 2015 | 1132 Pacific Av | units 1132 & 1136: remodel kitchens & bathrooms, repairs as neededDetails
units 1132 & 1136: remodel kitchens & bathrooms, repairs as needed | $65,000 |
| Feb 15, 2013 | Completed final sign-off Apr 2013 | 548 Broderick St | provide proper weather protection for walls exposed to exterior at passage way to rear yard. subit as built drawings per permit #2010-07-07-6120 for garage level #548. see inspection cc-7221Details
provide proper weather protection for walls exposed to exterior at passage way to rear yard. subit as built drawings per permit #2010-07-07-6120 for garage level #548. see inspection cc-7221 | $600 |
| May 14, 2012 | Completed final sign-off Sep 2012 | 1443 Alabama St | unit #1449: remodel kitchen and 2bathrooms no change in occupancy 50% min of kitchen light wattage high efficacy; unit #1449, repair stair landing in lightwell(repair landing dry rot approx. 4'x6')Details
unit #1449: remodel kitchen and 2bathrooms no change in occupancy 50% min of kitchen light wattage high efficacy; unit #1449, repair stair landing in lightwell(repair landing dry rot approx. 4'x6') | $28,000 |
| Dec 16, 2011 | Expired or cancelled expired Jan 2016 | 4141 23rd St | remodel front entry steps and garden. addition to rear of residence. add a living unit on the garden and street level while maintaining existing parking. addition of deck on living level over addition and four foot addition to the existing kitchen extension. remodel kitchens and bathrooms.Details
remodel front entry steps and garden. addition to rear of residence. add a living unit on the garden and street level while maintaining existing parking. addition of deck on living level over addition and four foot addition to the existing kitchen extension. remodel kitchens and bathrooms. | $500,000 |
| Oct 5, 2011 | Completed final sign-off May 2012 | 205 Fair Oaks St | remodel of existing bedroom no 3rd floor with addition of bathroom and dormers. replacement of heater. ( 207 fair oaks)Details
remodel of existing bedroom no 3rd floor with addition of bathroom and dormers. replacement of heater. ( 207 fair oaks) | $50,000 |
| Sep 21, 2011 | Completed final sign-off Oct 2011 | 205 Fair Oaks St | unit #205-install new furnace in crawl space (95% efficacy)Details
unit #205-install new furnace in crawl space (95% efficacy) | $5,000 |
| Aug 5, 2011 | Completed final sign-off Nov 2011 | 207 Fair Oaks St | re stucco 150' of existing brick foundation, install metal flashing at bottom of siding bolt with 5/8" x 16" galvanized bolts every 48" repair dry rot on foundation area as neededDetails
re stucco 150' of existing brick foundation, install metal flashing at bottom of siding bolt with 5/8" x 16" galvanized bolts every 48" repair dry rot on foundation area as needed | $6,000 |
| Jul 25, 2011 | Completed final sign-off Sep 2012 | 1901 Golden Gate Av | replace approx 30 ft of poor quality foundation with new foundationDetails
replace approx 30 ft of poor quality foundation with new foundation | $20,000 |
| Jul 25, 2011 | Completed final sign-off Mar 2012 | 3566 19th St | remodel of existing guestroom at gr floor. add guest bath. add separation between garage and living areaDetails
remodel of existing guestroom at gr floor. add guest bath. add separation between garage and living area | $60,000 |
| Aug 4, 2010 | Completed final sign-off Feb 2011 | 1918 Pine St | renovate 36 sq. ft. hall bathroom with new shower, vanity and toilet. move light fixture and new vanity in master bath. touch up and repairs as needed. work on 2nd floor. no wall removal.Details
renovate 36 sq. ft. hall bathroom with new shower, vanity and toilet. move light fixture and new vanity in master bath. touch up and repairs as needed. work on 2nd floor. no wall removal. | $12,000 |
| Jul 22, 2010 | Completed final sign-off Feb 2011 | 1918 Pine St | all work interior. renovate entry remove panelling, new sheetrock & paint. restore trim. remove lath & plaster on west wall & insulate w/ mineral wool r13Details
all work interior. renovate entry remove panelling, new sheetrock & paint. restore trim. remove lath & plaster on west wall & insulate w/ mineral wool r13 | $10,000 |
| Jul 7, 2010 | Completed final sign-off May 2011 | 548 Broderick St | remodel 2 kitchens, 4 bathrooms, add 1 bedroom & 1 bathroom in rear of garage. remove wall between kitchen & dining room. move posts in garage, repairs as needed.Details
remodel 2 kitchens, 4 bathrooms, add 1 bedroom & 1 bathroom in rear of garage. remove wall between kitchen & dining room. move posts in garage, repairs as needed. | $160,000 |
| Jun 17, 2010 | Completed final sign-off May 2011 | 550 Broderick St | partial demolition of garage space/basement exploratory work to view structural.Details
partial demolition of garage space/basement exploratory work to view structural. | $20,000 |