Back to bathroom remodel contractors
Steele Properties
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jul 2026
- Last 24 months
- 22 permits filed
81 permits since 2000: 67 completed, 11 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 23 completed, 5 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 285 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2026 | In progress issued May 2026 | 129 Fair Oaks St | unit #2 (front building): bathroom remodel in kind, no structural.Details
unit #2 (front building): bathroom remodel in kind, no structural. | $15,000 |
| May 5, 2026 | In progress issued May 2026 | 26 Farnum St | kitchen and bathrooms remodel in kind, no structural.Details
kitchen and bathrooms remodel in kind, no structural. | $55,000 |
| Sep 17, 2025 | Completed final sign-off Jun 2026 | 3721 Webster St | remodel (e) ground floor bathroom and wet bar in kind. no wall removal or layout changeDetails
remodel (e) ground floor bathroom and wet bar in kind. no wall removal or layout change | $45,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 1231 02nd Av | remodel kitchen, bath, powder in kind.Details
remodel kitchen, bath, powder in kind. | $60,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 1229 02nd Av | remodel kitchen, bath, powder in kind.Details
remodel kitchen, bath, powder in kind. | $60,000 |
| Mar 3, 2025 | In progress issued Jun 2025 | 17 Jordan Av | connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition..Details
connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition.. | $1,000,000 |
| Nov 22, 2024 | Completed final sign-off Sep 2025 | 263 Clinton Pk | kitchen and bathroom remodel in kindDetails
kitchen and bathroom remodel in kind | $65,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes.Details
unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes. | $120,000 |
| Jul 26, 2024 | Completed final sign-off Jan 2025 | 1134 Pacific Av | remodel kitchen & bath no structural.Details
remodel kitchen & bath no structural. | $65,000 |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 38 Belvedere St | unit 1: remodel kitchen and bath. no structuralDetails
unit 1: remodel kitchen and bath. no structural | $45,000 |
| Apr 23, 2024 | In progress issued Dec 2024 | 2586 32nd Av | interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e)Details
interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e) | $250,000 |
| Nov 6, 2023 | Completed final sign-off Sep 2024 | 38 Belvedere St | unit 5 bath remodel. add to 202304034944. replace furnace in kindDetails
unit 5 bath remodel. add to 202304034944. replace furnace in kind | $15,000 |
| Apr 3, 2023 | Completed final sign-off Feb 2025 | 1901 Golden Gate Av | kitchen bath remodel: no structural alterations in kindDetails
kitchen bath remodel: no structural alterations in kind | $40,000 |
| Jan 20, 2023 | Completed final sign-off May 2024 | 129 Fair Oaks St | unit 4: kitchen & bath remodel; correction notice 202302010 no structural alterationDetails
unit 4: kitchen & bath remodel; correction notice 202302010 no structural alteration | $30,000 |
| Dec 5, 2019 | Completed final sign-off Jun 2020 | 1295 47th Av | unit # 7: remodel kitchen and bathroom. no structural work under this permit.Details
unit # 7: remodel kitchen and bathroom. no structural work under this permit. | $40,000 |
| May 16, 2019 | Completed final sign-off Nov 2019 | 1295 47th Av | unit 1 - replacing cabinets (kitchen); retiling bathroomDetails
unit 1 - replacing cabinets (kitchen); retiling bathroom | $20,000 |
| May 11, 2018 | Completed final sign-off Jun 2020 | 1295 47th Av | additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces.Details
additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces. | $175,000 |
| Aug 24, 2017 | Never finaled issued Dec 2018, no final | 1913 Golden Gate Av | add unit per ord #162-16. convert single car garage to 2 bedroom, 1 bath dwelling unit and roof deck.Details
add unit per ord #162-16. convert single car garage to 2 bedroom, 1 bath dwelling unit and roof deck. | $75,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122.Details
convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122. | $150,000 |
| May 17, 2016 | Completed final sign-off Sep 2018 | 1696 Page St | kitchen & bath remodel at 1696 page st. no walls removed or added.Details
kitchen & bath remodel at 1696 page st. no walls removed or added. | $45,000 |
| May 17, 2016 | Completed final sign-off Dec 2016 | 38 Belvedere St | kitchen & bath remodel. unit 3 & 4. no walls removal or added.Details
kitchen & bath remodel. unit 3 & 4. no walls removal or added. | $70,000 |
| Apr 21, 2015 | Completed final sign-off Jul 2016 | 1674 Filbert St | revision to 201407282259 to reduce scope of work. modify as approved drawings at units 1,4,5. modify gr level to lateral structural work only. modify bathrooms above and retain orig walls at bedroom and dining room. elimated proposed 2nd bathroom.Details
revision to 201407282259 to reduce scope of work. modify as approved drawings at units 1,4,5. modify gr level to lateral structural work only. modify bathrooms above and retain orig walls at bedroom and dining room. elimated proposed 2nd bathroom. | |
| Jul 22, 2014 | Completed final sign-off Nov 2014 | 295 19th Av | at unit #5, remodel kitchen & bathroom.Details
at unit #5, remodel kitchen & bathroom. | $25,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2015 | 1903 Golden Gate Av | kitchen & bath remodel in unit 1903 golden gate ave.Details
kitchen & bath remodel in unit 1903 golden gate ave. | $30,000 |
| Sep 12, 2013 | Completed final sign-off Aug 2015 | 1132 Pacific Av | units 1132 & 1136: remodel kitchens & bathrooms, repairs as neededDetails
units 1132 & 1136: remodel kitchens & bathrooms, repairs as needed | $65,000 |
| Dec 16, 2011 | Expired or cancelled expired Jan 2016 | 4141 23rd St | remodel front entry steps and garden. addition to rear of residence. add a living unit on the garden and street level while maintaining existing parking. addition of deck on living level over addition and four foot addition to the existing kitchen extension. remodel kitchens and bathrooms.Details
remodel front entry steps and garden. addition to rear of residence. add a living unit on the garden and street level while maintaining existing parking. addition of deck on living level over addition and four foot addition to the existing kitchen extension. remodel kitchens and bathrooms. | $500,000 |
| Oct 5, 2011 | Completed final sign-off May 2012 | 205 Fair Oaks St | remodel of existing bedroom no 3rd floor with addition of bathroom and dormers. replacement of heater. ( 207 fair oaks)Details
remodel of existing bedroom no 3rd floor with addition of bathroom and dormers. replacement of heater. ( 207 fair oaks) | $50,000 |
| Jul 25, 2011 | Completed final sign-off Mar 2012 | 3566 19th St | remodel of existing guestroom at gr floor. add guest bath. add separation between garage and living areaDetails
remodel of existing guestroom at gr floor. add guest bath. add separation between garage and living area | $60,000 |
| Aug 4, 2010 | Completed final sign-off Feb 2011 | 1918 Pine St | renovate 36 sq. ft. hall bathroom with new shower, vanity and toilet. move light fixture and new vanity in master bath. touch up and repairs as needed. work on 2nd floor. no wall removal.Details
renovate 36 sq. ft. hall bathroom with new shower, vanity and toilet. move light fixture and new vanity in master bath. touch up and repairs as needed. work on 2nd floor. no wall removal. | $12,000 |
| Jul 7, 2010 | Completed final sign-off May 2011 | 548 Broderick St | remodel 2 kitchens, 4 bathrooms, add 1 bedroom & 1 bathroom in rear of garage. remove wall between kitchen & dining room. move posts in garage, repairs as needed.Details
remodel 2 kitchens, 4 bathrooms, add 1 bedroom & 1 bathroom in rear of garage. remove wall between kitchen & dining room. move posts in garage, repairs as needed. | $160,000 |