Back to kitchen remodel contractors
Steele Properties
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jul 2026
- Last 24 months
- 22 permits filed
81 permits since 2000: 67 completed, 11 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
32 kitchen remodel permits: 25 completed, 5 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 129 Fair Oaks St | front building. unit# 2. kitchen remodel in kind. no structural. 110 sq. ft.Details
front building. unit# 2. kitchen remodel in kind. no structural. 110 sq. ft. | $20,000 |
| May 5, 2026 | In progress issued May 2026 | 26 Farnum St | kitchen and bathrooms remodel in kind, no structural.Details
kitchen and bathrooms remodel in kind, no structural. | $55,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 1231 02nd Av | remodel kitchen, bath, powder in kind.Details
remodel kitchen, bath, powder in kind. | $60,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 259 Clinton Pk | remodel kitchen in kind.Details
remodel kitchen in kind. | $25,000 |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 1229 02nd Av | remodel kitchen, bath, powder in kind.Details
remodel kitchen, bath, powder in kind. | $60,000 |
| Mar 3, 2025 | In progress issued Jun 2025 | 17 Jordan Av | connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition..Details
connvert non-habitable to habitable, inter remodel all areas incl kitchen, bathrooms and living areas, demo 1-bath, add 3-baths, add 1-bedroom at 1/f. replace (e)foundation, raise house approx 18". local seismic strengthening. new dormers @ roof. new heat system. enclose 1/f area under (e)addition.. | $1,000,000 |
| Nov 22, 2024 | Completed final sign-off Sep 2025 | 263 Clinton Pk | kitchen and bathroom remodel in kindDetails
kitchen and bathroom remodel in kind | $65,000 |
| Aug 7, 2024 | In progress issued Aug 2024 | 650 Delancey St | unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes.Details
unit #220: remodel 1st floor kitchen and bathroom and 2nd floor bathroom, no structural or layout changes. | $120,000 |
| Jul 26, 2024 | Completed final sign-off Jan 2025 | 1134 Pacific Av | remodel kitchen & bath no structural.Details
remodel kitchen & bath no structural. | $65,000 |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 38 Belvedere St | unit 1: remodel kitchen and bath. no structuralDetails
unit 1: remodel kitchen and bath. no structural | $45,000 |
| Apr 23, 2024 | In progress issued Dec 2024 | 2586 32nd Av | interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e)Details
interior remodel, foundaton replacement & structural upgrade 2 stories. general remodel include 2 baths, replace (relocate) kitchen from 2/f to 1/f. replace (e) wood, vinyl, & alum. windows indicated w/ painted wood doublehung windows. create concrete terraces at rear yard. infill addition under (e) | $250,000 |
| Apr 3, 2023 | Completed final sign-off Feb 2025 | 1901 Golden Gate Av | kitchen bath remodel: no structural alterations in kindDetails
kitchen bath remodel: no structural alterations in kind | $40,000 |
| Apr 3, 2023 | Completed final sign-off Sep 2024 | 38 Belvedere St | unit 5: kitchen remodel: no structural alterationsDetails
unit 5: kitchen remodel: no structural alterations | $25,000 |
| Jan 20, 2023 | Completed final sign-off May 2024 | 129 Fair Oaks St | unit 4: kitchen & bath remodel; correction notice 202302010 no structural alterationDetails
unit 4: kitchen & bath remodel; correction notice 202302010 no structural alteration | $30,000 |
| Apr 5, 2022 | Completed final sign-off Feb 2023 | 125 Fair Oaks St | (unit 125 fair oaks rear building) replace kitchen cabinets with same layoutDetails
(unit 125 fair oaks rear building) replace kitchen cabinets with same layout | $10,000 |
| Aug 25, 2021 | Completed final sign-off Feb 2022 | 178 28th St | remodel kitchen and install new furnace in 178 28th stDetails
remodel kitchen and install new furnace in 178 28th st | $35,000 |
| Dec 5, 2019 | Completed final sign-off Jun 2020 | 1295 47th Av | unit # 7: remodel kitchen and bathroom. no structural work under this permit.Details
unit # 7: remodel kitchen and bathroom. no structural work under this permit. | $40,000 |
| May 16, 2019 | Completed final sign-off Nov 2019 | 1295 47th Av | unit 1 - replacing cabinets (kitchen); retiling bathroomDetails
unit 1 - replacing cabinets (kitchen); retiling bathroom | $20,000 |
| Nov 27, 2018 | Never finaled issued Nov 2018, no final | 38 Belvedere St | kitchen remodel only. replace kitchen cabinets and counter tops. all work unit number 6.Details
kitchen remodel only. replace kitchen cabinets and counter tops. all work unit number 6. | $25,000 |
| Oct 25, 2018 | Completed final sign-off Jun 2019 | 1039 Scott St | unit b: replace kitchen cabinets and counters onlyDetails
unit b: replace kitchen cabinets and counters only | $10,000 |
| Oct 25, 2018 | Completed final sign-off Nov 2019 | 1295 47th Av | unit 8: replace kitchen cabinets and counters onlyDetails
unit 8: replace kitchen cabinets and counters only | $10,000 |
| May 11, 2018 | Completed final sign-off Jun 2020 | 1295 47th Av | additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces.Details
additional dwelling units per ord# 162-16; add (4) dwelling units @ gound fl w/ (4) kitchens, (4) bathrooms and (5) bedrooms; remove (8) (e) garage spaces. | $175,000 |
| Jun 23, 2017 | Completed final sign-off Jun 2019 | 1031 Scott St | unit #a: replace cabinets in kitchen, do not open walls.Details
unit #a: replace cabinets in kitchen, do not open walls. | $15,000 |
| Mar 9, 2017 | Completed final sign-off Apr 2021 | 129 Fair Oaks St | convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122.Details
convert (e) storage & mech rooms to habitable space. add 2 new dwelling units per ordinance# 162-16. 2 new kitchens. 2 new baths. new doors / windows @ rear & side of building. nfpa 13 sprinklers.seismic pa# 2017/03/09/1122. | $150,000 |
| May 17, 2016 | Completed final sign-off Sep 2018 | 1696 Page St | kitchen & bath remodel at 1696 page st. no walls removed or added.Details
kitchen & bath remodel at 1696 page st. no walls removed or added. | $45,000 |
| May 17, 2016 | Completed final sign-off Dec 2016 | 38 Belvedere St | kitchen & bath remodel. unit 3 & 4. no walls removal or added.Details
kitchen & bath remodel. unit 3 & 4. no walls removal or added. | $70,000 |
| Jul 22, 2014 | Completed final sign-off Nov 2014 | 295 19th Av | at unit #5, remodel kitchen & bathroom.Details
at unit #5, remodel kitchen & bathroom. | $25,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2015 | 1903 Golden Gate Av | kitchen & bath remodel in unit 1903 golden gate ave.Details
kitchen & bath remodel in unit 1903 golden gate ave. | $30,000 |
| Sep 12, 2013 | Completed final sign-off Aug 2015 | 1132 Pacific Av | units 1132 & 1136: remodel kitchens & bathrooms, repairs as neededDetails
units 1132 & 1136: remodel kitchens & bathrooms, repairs as needed | $65,000 |
| May 14, 2012 | Completed final sign-off Sep 2012 | 1443 Alabama St | unit #1449: remodel kitchen and 2bathrooms no change in occupancy 50% min of kitchen light wattage high efficacy; unit #1449, repair stair landing in lightwell(repair landing dry rot approx. 4'x6')Details
unit #1449: remodel kitchen and 2bathrooms no change in occupancy 50% min of kitchen light wattage high efficacy; unit #1449, repair stair landing in lightwell(repair landing dry rot approx. 4'x6') | $28,000 |
| Dec 16, 2011 | Expired or cancelled expired Jan 2016 | 4141 23rd St | remodel front entry steps and garden. addition to rear of residence. add a living unit on the garden and street level while maintaining existing parking. addition of deck on living level over addition and four foot addition to the existing kitchen extension. remodel kitchens and bathrooms.Details
remodel front entry steps and garden. addition to rear of residence. add a living unit on the garden and street level while maintaining existing parking. addition of deck on living level over addition and four foot addition to the existing kitchen extension. remodel kitchens and bathrooms. | $500,000 |
| Jul 7, 2010 | Completed final sign-off May 2011 | 548 Broderick St | remodel 2 kitchens, 4 bathrooms, add 1 bedroom & 1 bathroom in rear of garage. remove wall between kitchen & dining room. move posts in garage, repairs as needed.Details
remodel 2 kitchens, 4 bathrooms, add 1 bedroom & 1 bathroom in rear of garage. remove wall between kitchen & dining room. move posts in garage, repairs as needed. | $160,000 |