Block 0100, lot 044
850 Union St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 2
- Units
- 5
- Rooms
- 3 bathrooms
- Building
- 5,348 sq ft
- Lot
- 6,337 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 6, 2024 | Completed final sign-off Apr 2024 | 850 Union St | Apollo Building & Roofing Group Inc. | reroofingDetails
reroofing | $19,000 |
| Nov 9, 2018 | Completed final sign-off Dec 2018 | 850 Union St | Cal C A D E Construction Inc | to obtain final inspection for work approved under pa 201104133986Details
to obtain final inspection for work approved under pa 201104133986 | |
| Sep 28, 2018 | Completed final sign-off Dec 2018 | 850 Union St | Cal C A D E Construction Inc | to obtain final inspection for work approved under pa#s: 2011-05-31-7081, & 2011-08-01-1449. all work is completeDetails
to obtain final inspection for work approved under pa#s: 2011-05-31-7081, & 2011-08-01-1449. all work is complete | |
| Sep 28, 2018 | Expired or cancelled cancelled Dec 2018 | 850 Union St | Cal C A D E Construction Inc | to obtain final inspection for work approved under pa#s: 2009-02-12-2024, 2011-04-13-3986 & 2009-05-05-7662. all work is completeDetails
to obtain final inspection for work approved under pa#s: 2009-02-12-2024, 2011-04-13-3986 & 2009-05-05-7662. all work is complete | |
| Aug 1, 2011 | Expired or cancelled expired Jan 2013 | 850 Union St | Cal C A D E Construction Inc | revision to pa# 2011-0413-3986-no change to scope of work, changes to technical drawings only.Details
revision to pa# 2011-0413-3986-no change to scope of work, changes to technical drawings only. | $1,500 |
| Jul 25, 2011 | Never finaled issued Jul 2011, no final | 850 Union St | street space permitDetails
street space permit | ||
| May 31, 2011 | Expired or cancelled expired Dec 2018 | 850 Union St | Cal C A D E Construction Inc | exterior remodel of e rear elevation including new doors, windows, wood deck at +6" above gradeDetails
exterior remodel of e rear elevation including new doors, windows, wood deck at +6" above grade | $15,000 |
| Apr 13, 2011 | Expired or cancelled expired Dec 2018 | 850 Union St | Cal C A D E Construction Inc | interior floor alterations (localized), new beam, posts & footings added to the back end of the bldg.Details
interior floor alterations (localized), new beam, posts & footings added to the back end of the bldg. | $40,000 |
| May 5, 2009 | Expired or cancelled cancelled Nov 2018 | 850 Union St | exterior changes to (e) building. (1) modify or remove some (e) windows & doors, (2) new windows & doors. (3) (n) dormers @ (e) pitched roof. 4) (n) skylights @ pitched roof. 5) (e) chimney to be removed. reference application 200902122024 for floor plans, structural, mech & fire.Details
exterior changes to (e) building. (1) modify or remove some (e) windows & doors, (2) new windows & doors. (3) (n) dormers @ (e) pitched roof. 4) (n) skylights @ pitched roof. 5) (e) chimney to be removed. reference application 200902122024 for floor plans, structural, mech & fire. | $60,000 | |
| Feb 12, 2009 | Expired or cancelled cancelled Dec 2018 | 850 Union St | (n)windws,reloc(e)window openings,reloc(e)entry doors.remodel 4 (e)dus.expand(e)unit @(e)3rd fl into attic space,(e)unconditioned attic space becomes(n)4th fl of r-2 occup. (n)dormers(n)elevator.spklrs under sep permit.notes:exterior wk incldormers&windows approv under #200905057662 reviewed by dcp.Details
(n)windws,reloc(e)window openings,reloc(e)entry doors.remodel 4 (e)dus.expand(e)unit @(e)3rd fl into attic space,(e)unconditioned attic space becomes(n)4th fl of r-2 occup. (n)dormers(n)elevator.spklrs under sep permit.notes:exterior wk incldormers&windows approv under #200905057662 reviewed by dcp. | $120,000 | |
| Jun 8, 2005 | Expired or cancelled expired Aug 2011 | 846 Union St | remove interior non-loadbearing partitions. install kitchen counter & appliances two units. add partDetails
remove interior non-loadbearing partitions. install kitchen counter & appliances two units. add part | $20,000 | |
| Oct 22, 2004 | Never finaled issued Oct 2004, no final | 846 Union St | street spaceDetails
street space | ||
| Aug 23, 2004 | Never finaled issued Aug 2004, no final | 850 Union St | street space permitDetails
street space permit | ||
| Jun 24, 2004 | Never finaled issued Jun 2004, no final | 850 Union St | street spaceDetails
street space | ||
| May 3, 2004 | Never finaled issued May 2004, no final | 850 Union St | street space permitDetails
street space permit | ||
| Mar 8, 2004 | Completed final sign-off Jul 2004 | 846 Union St | Solstice Enterprises Inc. | install new kchn cbnts/clear lingruen assoc. pest report/repair back stairsDetails
install new kchn cbnts/clear lingruen assoc. pest report/repair back stairs | $26,500 |
| Feb 18, 2004 | Completed final sign-off Jun 2004 | 850 Union St | Solstice Enterprises Inc. | replace ext rear 6x6 wndw with new double pane 8x6 wndw/ install new header/new trim around wndwDetails
replace ext rear 6x6 wndw with new double pane 8x6 wndw/ install new header/new trim around wndw | $4,950 |
| Jan 7, 2004 | Completed final sign-off Jan 2004 | 846 Union St | Safeway Roofing & Siding Co. | reroofingDetails
reroofing | $3,650 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cal C A D E Construction Inc (6), Solstice Enterprises Inc. (2), Apollo Building & Roofing Group Inc., Safeway Roofing & Siding Co.
- Architects
- Suheil Shatara (2), Harvey Hacher, Justin Martinkovic
- Engineers
- Fareed Himmati
- Authorized agent-otherss
- Jayne Francisco
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.