J. Jarrell Conner
- Listed as
- architect, authorized agent-others
- Firm
- Tierney Conner Design Studio
- Based in
- Oakland
- On San Francisco permits
- Jan 2006 to Mar 2026
15 permits since 2000 (architect on 13 permits, authorized agent-others on 2 permits): 8 completed, 3 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2026 | In progress issued Aug 2026 | 1596 Post St | Cal C A D E Construction Inc | revision to 202405091826 & reference 202601153915 new fire rated wall detail at property line wall due to siding change approved in permit ending 3915. new gas utility & meters installed on west exterior wall. (n) fire rated door between garage and hallway. new door between office and loading dockDetails
revision to 202405091826 & reference 202601153915 new fire rated wall detail at property line wall due to siding change approved in permit ending 3915. new gas utility & meters installed on west exterior wall. (n) fire rated door between garage and hallway. new door between office and loading dock | |
| May 28, 2025 | In progress filed May 2025, not yet issued | 1596 Post St | Cal C A D E Construction Inc | demo interior of 1st fl and partial basement. vacant building. demolition per sfdbi ab-017. refer to pa# 202405091826Details
demo interior of 1st fl and partial basement. vacant building. demolition per sfdbi ab-017. refer to pa# 202405091826 | $8,000 |
| Oct 29, 2024 | Completed final sign-off Aug 2026 | 304 Gold Mine Dr | Sky Trust Builder | new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck.Details
new cantilevered upper deck to replace (e) upper deck replace door that connects to upper deck. (n) windows in (e) location on front facade. (n) hardie plank siding on front, rear & side facades of resdience. (n) exterior stairs from (e) lower deck to rear yard (n) quardril and (e) lower deck. | $35,000 |
| Jun 24, 2024 | In progress issued Jul 2025 | 1596 Post St | Cal C A D E Construction Inc | 2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room.Details
2132 sf 3rd floor addition to existing 7125 sf 2story mixed use bldg including:3(n)beds,(2)new baths & (1)toilet,increasing bldg height from 27'3"to 38'-8.scope to create a 1048 sf garage w/(3)covered parking spaces,& 2nd fl remodeling(e)2375 sf(4)bedroom,(1)bath & (1)powder room. | $600,000 |
| Jul 28, 2021 | Completed final sign-off Mar 2023 | 334 22nd Av | Sky Trust Builder | renovate e kitchen and dining room, new stairs to garage/basement, renovate e bath, new skylight, modify 1 window not visible from street, new on demand hot water heaterDetails
renovate e kitchen and dining room, new stairs to garage/basement, renovate e bath, new skylight, modify 1 window not visible from street, new on demand hot water heater | $50,000 |
| Jul 6, 2021 | Completed final sign-off Mar 2022 | 304 Gold Mine Dr | Sky Trust Builder | first floor interior remodel: add new bathroom and wet bar within existing building footprint. no new square footage. no exterior changes, no change to building envelope.Details
first floor interior remodel: add new bathroom and wet bar within existing building footprint. no new square footage. no exterior changes, no change to building envelope. | $25,000 |
| Jul 22, 2019 | Expired or cancelled cancelled Jul 2024 | 634 Edna St | addition; 428 (n) sq.ft on lower level. 230(n) sq.ft on upper level; interior renovations including (n) bathrooms, renovated kitchen, (n) bedroom, (n) bedroom, (n) rear deck & rear yard improvements: includes reataining walls, patios on grade.Details
addition; 428 (n) sq.ft on lower level. 230(n) sq.ft on upper level; interior renovations including (n) bathrooms, renovated kitchen, (n) bedroom, (n) bedroom, (n) rear deck & rear yard improvements: includes reataining walls, patios on grade. | $250,000 | |
| Nov 14, 2016 | Completed final sign-off Mar 2017 | 300 Gold Mine Dr | Bay Build Design Inc | minor alteration of existing bathroom - moving sink. adding pocket doors x2. new tiling & flooring, moving light fixture. creation of cubby for existing closetDetails
minor alteration of existing bathroom - moving sink. adding pocket doors x2. new tiling & flooring, moving light fixture. creation of cubby for existing closet | $8,000 |
| May 18, 2016 | Completed final sign-off Jul 2017 | 2227 15th Av | Jack Chen Construction | renovate of (e) interior space on lower level to include (n) family rm bath, bedroom, laundry room, less than 500 sq ft living area. windows/doors in area of construction. (n) skylight, upgrade (e) stairs (non-conf) between upper & lower levels. no horizontal or vertical extension.Details
renovate of (e) interior space on lower level to include (n) family rm bath, bedroom, laundry room, less than 500 sq ft living area. windows/doors in area of construction. (n) skylight, upgrade (e) stairs (non-conf) between upper & lower levels. no horizontal or vertical extension. | $100,000 |
| Jan 25, 2016 | Completed final sign-off Jan 2017 | 535 Pennsylvania Av | Hon's Construction Inc. | remove (e) 303 sq.ft. rear deck & 255 sq.fr. rear addition, remodel 2 (e) baths, (n) closets, remodel kitchen, (n) stair to lower level storage, renovate lower level to include (n) bedroom, (n) bath, (n) laundry, (n) windows & doors, (n) garage door & brick @ garage door, (n) paint @ exterior.Details
remove (e) 303 sq.ft. rear deck & 255 sq.fr. rear addition, remodel 2 (e) baths, (n) closets, remodel kitchen, (n) stair to lower level storage, renovate lower level to include (n) bedroom, (n) bath, (n) laundry, (n) windows & doors, (n) garage door & brick @ garage door, (n) paint @ exterior. | $85,000 |
| Dec 22, 2015 | Completed final sign-off Jan 2017 | 537 Pennsylvania Av | Hon's Construction Inc. | interior renovations include 2 bathrooms upgrades, (n) closets, remodel kitchen, (n) open air stair within (e) building envelope to (n) roof deck, associated structural work.Details
interior renovations include 2 bathrooms upgrades, (n) closets, remodel kitchen, (n) open air stair within (e) building envelope to (n) roof deck, associated structural work. | $75,000 |
| Jul 10, 2014 | Expired or cancelled expired Nov 2017 | 189 06th Av | Spellbound Construction | change of use from vacant retail to limited restaurant. remodel of (e) bathroom to make it ada compliant, plumbing & electrical work. interior t.i. workDetails
change of use from vacant retail to limited restaurant. remodel of (e) bathroom to make it ada compliant, plumbing & electrical work. interior t.i. work | $40,000 |
| Feb 27, 2014 | Completed final sign-off Mar 2015 | 300 South Van Ness Av | Incom Mechanical Inc | install (n) fire sprinkler system for car dealership per nfpa #13 with 217 sprinklers. no underground work. maher ordinance not applicable, no disturbance of at least 50 cu yd of soil.Details
install (n) fire sprinkler system for car dealership per nfpa #13 with 217 sprinklers. no underground work. maher ordinance not applicable, no disturbance of at least 50 cu yd of soil. | $85,000 |
| Dec 17, 2013 | Never finaled issued Jan 2014, no final | 631 Howard St | Incom Mechanical Inc | 5th floor - install complete and aperable automatic wet f/s system through all 5th floor w/nfpa 13 2010 cbc 2010. comply w/ ordinance no. 155-13 not required. excavation <50 cu.yd.Details
5th floor - install complete and aperable automatic wet f/s system through all 5th floor w/nfpa 13 2010 cbc 2010. comply w/ ordinance no. 155-13 not required. excavation <50 cu.yd. | $25,000 |
| Jan 31, 2006 | Expired or cancelled cancelled Sep 2007 | 10 Hillway Av | remove extg exteriro stairs, extg deck and extg door/remove portion of interior wall and restructural reqr/remove 2 extg wndw in nook/replace with dbl door/ construct new wood 150 sf deck structured reinforced nook as reqrd replace extg kchn wndw with new to matchDetails
remove extg exteriro stairs, extg deck and extg door/remove portion of interior wall and restructural reqr/remove 2 extg wndw in nook/replace with dbl door/ construct new wood 150 sf deck structured reinforced nook as reqrd replace extg kchn wndw with new to match | $10,000 |