Block 1270, lot 037
820 Ashbury St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 4
- Units
- 7
- Rooms
- 7 bathrooms
- Building
- 5,430 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 7, 2024 | Completed final sign-off Aug 2024 | 820 Ashbury St | W C S S Dba Solid Build Construction | unit #5: installation of 2 layers of insulation in between the joists. install clip isolation system with 25g furring channel. install 2 layers of drywall with acoustical sealan around the perimeter.Details
unit #5: installation of 2 layers of insulation in between the joists. install clip isolation system with 25g furring channel. install 2 layers of drywall with acoustical sealan around the perimeter. | $9,500 |
| Mar 20, 2023 | Completed final sign-off Jun 2023 | 820 Ashbury St | Red Light Fire Alarms | installation of fire alarm system: 1 facu, 1 fire alarm annuciator, 3 pull stations, 3 smoke det, 2 hest det, 4 horn strobes, 1 water flow alarm module, 1 tamper module, 13 low freq sounders, 1 celluter communicatorDetails
installation of fire alarm system: 1 facu, 1 fire alarm annuciator, 3 pull stations, 3 smoke det, 2 hest det, 4 horn strobes, 1 water flow alarm module, 1 tamper module, 13 low freq sounders, 1 celluter communicator | $20,000 |
| Oct 2, 2017 | Never finaled issued Oct 2017, no final | 820 Ashbury St | M V Builder | repair rotten casing on windows; seal cracks on stucco and painting - visible from street. maher n/aDetails
repair rotten casing on windows; seal cracks on stucco and painting - visible from street. maher n/a | $8,800 |
| Dec 14, 2012 | Never finaled issued Dec 2012, no final | 820 Ashbury St | street space permitDetails
street space permit | ||
| Nov 20, 2012 | Completed final sign-off Feb 2013 | 820 Ashbury St | kitchen and bath remodel. provide high efficiency lighting, appliances. paint walls, cabinets, tile, wood floor, high efficiency toilet, exhaust fan, tub, sinkDetails
kitchen and bath remodel. provide high efficiency lighting, appliances. paint walls, cabinets, tile, wood floor, high efficiency toilet, exhaust fan, tub, sink | $20,000 | |
| May 13, 2010 | Never finaled issued May 2010, no final | 820 Ashbury St | street space & sidewalk repair.Details
street space & sidewalk repair. | ||
| Feb 17, 2010 | Completed final sign-off Apr 2010 | 820 Ashbury St | Peak General Contractors Inc | unit # 1. kitchen & bathroom remodel. paint refinish floor, new appliances, install new bathroom fixtures, new tile and paint kitchen cabinets.provide high effeciency lighting per t-24 residential mandatory measuresDetails
unit # 1. kitchen & bathroom remodel. paint refinish floor, new appliances, install new bathroom fixtures, new tile and paint kitchen cabinets.provide high effeciency lighting per t-24 residential mandatory measures | $34,000 |
| Jul 14, 2008 | Never finaled issued Jul 2008, no final | 820 Ashbury St | Peak General Contractors Inc | remodel (e) kitchen & bathrrom in #6 with finished plumbing fixtures, & appliances & replace closet door.Details
remodel (e) kitchen & bathrrom in #6 with finished plumbing fixtures, & appliances & replace closet door. | $45,000 |
| Apr 17, 2008 | Never finaled issued Apr 2008, no final | 820 Ashbury St | Asbetos Management Group | demo of variour areas - 3 primarily for the exclusive purposes of mold abatement and remediation. #3 areas to demo: 1. lower partition 3'x3' of livingroom wall outside tub. 2. closet corner that butts to kitchen wall in front. 3. corner adjacent to stairs.Details
demo of variour areas - 3 primarily for the exclusive purposes of mold abatement and remediation. #3 areas to demo: 1. lower partition 3'x3' of livingroom wall outside tub. 2. closet corner that butts to kitchen wall in front. 3. corner adjacent to stairs. | $5,400 |
| Mar 25, 2008 | Never finaled issued Mar 2008, no final | 820 Ashbury St | street space permit only.Details
street space permit only. | ||
| Mar 3, 2008 | Never finaled issued Mar 2008, no final | 820 Ashbury St | street spaceDetails
street space | ||
| Feb 29, 2008 | Never finaled issued Feb 2008, no final | 820 Ashbury St | Peak General Contractors Inc | updating kitchen cabinets and paint, updating toilet, sink and paint, updating heating, take out old electric baseboards-install gas, changing light fixtures to be more energy efficient heater. no change to exit, doors and windowsDetails
updating kitchen cabinets and paint, updating toilet, sink and paint, updating heating, take out old electric baseboards-install gas, changing light fixtures to be more energy efficient heater. no change to exit, doors and windows | $22,000 |
| Jul 14, 2005 | Completed final sign-off Aug 2005 | 820 Ashbury St | replace one rotten board in existing deck, replace rotten treads (steps) and/or risers on existing sDetails
replace one rotten board in existing deck, replace rotten treads (steps) and/or risers on existing s | $300 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.