Neil Ginty
- Listed as
- architect, authorized agent-others, designer, pmt consultant/expediter
- Firm
- Dwelling Lab
- Based in
- Walnut Creek
- On San Francisco permits
- Mar 2021 to Sep 2026
30 permits since 2000 (architect on 24 permits, authorized agent-others on 4 permits, designer on 1 permit, pmt consultant/expediter on 1 permit): 17 completed, 11 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 22, 2026 | In progress filed Sep 2026, not yet issued | 344 Liberty St | addition to (e) unit to include a master bedroom & hime office. with associated architectural, structural & electrical works.Details
addition to (e) unit to include a master bedroom & hime office. with associated architectural, structural & electrical works. | $250,000 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 170 26th Av | addition of a bedroom and interior remodel of a bathroom on the 3rd level of sfd.Details
addition of a bedroom and interior remodel of a bathroom on the 3rd level of sfd. | $55,000 | |
| Sep 9, 2026 | In progress filed Sep 2026, not yet issued | 1581 Treat Av | interior remodel of bathroom and adding a bathroom on second floor.Details
interior remodel of bathroom and adding a bathroom on second floor. | $25,000 | |
| Aug 21, 2026 | Completed final sign-off Sep 2026 | 1808 Newhall St | revision to pa# 202409110548: omit air filtration sytems in main unit and adu. leave door from adu to main stairway. new window at bathroomDetails
revision to pa# 202409110548: omit air filtration sytems in main unit and adu. leave door from adu to main stairway. new window at bathroom | ||
| Aug 10, 2026 | In progress issued Sep 2026 | 271 Clara St | Ayala Builder's And Company Inc | legalize non-structural partition for a new bedroom and legalize half bathroom.Details
legalize non-structural partition for a new bedroom and legalize half bathroom. | $2,000 |
| Jul 30, 2026 | In progress issued Sep 2026 | 255 Dellbrook Av | Abk Solution Inc Dba The Star Constructi | interior remodel of ktichen and converting storage garage area to bedroom and laundry closet.Details
interior remodel of ktichen and converting storage garage area to bedroom and laundry closet. | $50,000 |
| May 20, 2026 | In progress issued Sep 2026 | 1658 Chestnut St | Ot Bay Builders Inc. | interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor.Details
interior remodel of the ground floor basement into bedroom with 2 bathrooms. addition of internal staircase. remodel kitchen and dining area located on 1st floor. | $170,000 |
| May 15, 2026 | In progress filed May 2026, not yet issued | 2929 Pine St | non structural -interior remodel to create an accessory dwelling unit converted from existing single family dwelling and associate plumbing and electrical works in a space were an unauthorized dwelling unit was found to be have previously existed.Details
non structural -interior remodel to create an accessory dwelling unit converted from existing single family dwelling and associate plumbing and electrical works in a space were an unauthorized dwelling unit was found to be have previously existed. | $50,000 | |
| Apr 29, 2026 | In progress filed Apr 2026, not yet issued | 470 Athens St | interior remodel of two bedrooms, family froom w/ wetbar and storageDetails
interior remodel of two bedrooms, family froom w/ wetbar and storage | $150,000 | |
| Dec 11, 2025 | Completed final sign-off Apr 2026 | 1330 Alabama St | Superb Builders & Custom Made Cabinetry | 1st/f rear unit: remodel of bathroom fan and kitchen and non structrual partitions to be removed. sink location for kitchen to be relocated. additional outlets and light fixtures.Details
1st/f rear unit: remodel of bathroom fan and kitchen and non structrual partitions to be removed. sink location for kitchen to be relocated. additional outlets and light fixtures. | $50,000 |
| Jun 20, 2025 | Completed final sign-off Jul 2026 | 978 Teresita Bl | Cody Design Build Inc | remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from insideDetails
remodel (e) kitchen and bathroom on 2/f. relocate (e) half bath to full bath on 1/f. 3 windows replacement; remove (e) fireplace; relocate door in bedrooms and modify closet doors; voluntary add plywood sheathing to north ane east exterior wall from inside | $70,000 |
| Jun 5, 2025 | Completed final sign-off Feb 2026 | 1560 Mckinnon Av | Ayala Builder's And Company Inc | 1st fl interior bath remodelDetails
1st fl interior bath remodel | $20,000 |
| Apr 11, 2025 | In progress filed Apr 2025, not yet issued | 411 Clipper St | interior remodel & horizontal addition: addition of a basement & a story. horizontal addition to front & rear side of project. addition of a 2nd unit. (n) basement including a 2-car garage, bike storage, mechnical space & habitable space for unit 1.Details
interior remodel & horizontal addition: addition of a basement & a story. horizontal addition to front & rear side of project. addition of a 2nd unit. (n) basement including a 2-car garage, bike storage, mechnical space & habitable space for unit 1. | $800,000 | |
| Mar 28, 2025 | In progress issued Aug 2025 | 33 Marne Av | Chiang C M Construction Inc. | install structural for ceiling mounted hoist at upper levelDetails
install structural for ceiling mounted hoist at upper level | $10,000 |
| Mar 27, 2025 | Completed final sign-off Oct 2025 | 1634 Hayes St | Reliable Construction Inc | non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visibleDetails
non structural interior remodel of kitchen, bathroom, laundry room. new exterior windows not street visible | $45,000 |
| Dec 11, 2024 | Completed final sign-off Aug 2025 | 4348 17th St | Level 21 Construction Company | remodel of (e) home includes adding (n) 2 bathrooms located on 2nd floor. to include upgrades for electrical and plumbing.Details
remodel of (e) home includes adding (n) 2 bathrooms located on 2nd floor. to include upgrades for electrical and plumbing. | $42,000 |
| Nov 7, 2024 | Completed final sign-off Aug 2026 | 249 Nevada St | A1 Construction Group Corp | conversion of (e) storage space in attached garage to (n) bedroom, bathroom, & laundry.Details
conversion of (e) storage space in attached garage to (n) bedroom, bathroom, & laundry. | $145,000 |
| Oct 25, 2024 | Completed final sign-off Sep 2026 | 1808 Newhall St | Bail Construction | 1/f: adding kitchen and closing the unit or adding a door to the main stair of the house main entrance to this unit would be from the east. conversion to an accessory dwelling unit. 2/f: in the back of the house adding two rooms on the front adds a room.Details
1/f: adding kitchen and closing the unit or adding a door to the main stair of the house main entrance to this unit would be from the east. conversion to an accessory dwelling unit. 2/f: in the back of the house adding two rooms on the front adds a room. | $25,000 |
| Apr 18, 2024 | Completed final sign-off Aug 2024 | 526 Lake St | Olive Construction Corp | remodel of e) unit 526 for 1.5 bathroom & associated plumbing & electric at 1st flDetails
remodel of e) unit 526 for 1.5 bathroom & associated plumbing & electric at 1st fl | $42,000 |
| Jan 18, 2024 | Completed final sign-off Dec 2025 | 241 04th Av | Velox Construction Inc/Velox Des & Const | remodel of two apartments in an existing 2-family dwelling and conversion of (e) storage space to habitable space including remodel of 2 kitchens, 2 bathrooms and interior addition of 2 bathrooms and associated plumbing & full electrical upgrade.Details
remodel of two apartments in an existing 2-family dwelling and conversion of (e) storage space to habitable space including remodel of 2 kitchens, 2 bathrooms and interior addition of 2 bathrooms and associated plumbing & full electrical upgrade. | $400,000 |
| Dec 21, 2023 | Completed final sign-off Dec 2024 | 3915 Cesar Chavez St | Cody Design Build Inc | one 2nd flr bathroom remodel in (e) single family dwelling and associated plumbing and electrical work.Details
one 2nd flr bathroom remodel in (e) single family dwelling and associated plumbing and electrical work. | $20,552 |
| Oct 26, 2023 | In progress filed Oct 2023, not yet issued | 270 Eureka St | construction of new deck at rear of propertyDetails
construction of new deck at rear of property | $25,000 | |
| May 4, 2023 | Never finaled issued May 2023, no final | 33 Marne Av | Chiang C M Construction Inc. | interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior workDetails
interior remodel to provide accessiblity upgrades to existing single family dwelling including kitchen, bathroom, and stairs. associated electrical and plumbing works. interior work | $140,289 |
| Mar 2, 2023 | Expired or cancelled cancelled Jan 2026 | 151 Westmoorland Dr | addition of 1 exterior window and interior remodel to include gr fl remodeled bath, laundry and new interior partitions. window not visible from street.Details
addition of 1 exterior window and interior remodel to include gr fl remodeled bath, laundry and new interior partitions. window not visible from street. | $25,000 | |
| Jan 12, 2023 | Completed final sign-off Jun 2023 | 101 Montgomery St | unit 101-f: metal sign projection from (e) bldg, matte black frame w/opaque matte white surface, backlit (non electric), 10' above street level, "holy nata portuguese bakery"Details
unit 101-f: metal sign projection from (e) bldg, matte black frame w/opaque matte white surface, backlit (non electric), 10' above street level, "holy nata portuguese bakery" | $100 | |
| Nov 16, 2022 | Completed final sign-off Jun 2023 | 101 Montgomery St | #101-f: t.i. of an extg ground level shell retail space. new millwork and kitchen equipment. no change of useDetails
#101-f: t.i. of an extg ground level shell retail space. new millwork and kitchen equipment. no change of use | $10,000 | |
| Jul 28, 2022 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | revision to pa# 202204081865. removal of fire sprinklers from scope and from approved permit as a deferred submittal.Details
revision to pa# 202204081865. removal of fire sprinklers from scope and from approved permit as a deferred submittal. | |
| May 25, 2022 | Completed final sign-off Mar 2024 | 1061 Folsom St | K Bali Construction | upgrade (e) elevator with a new elevator, for the second floor office suite, upgrades include access stair to that space. mechanical and electrical are under a seperate permits pa 202204081865. stair shop drawings deferred.Details
upgrade (e) elevator with a new elevator, for the second floor office suite, upgrades include access stair to that space. mechanical and electrical are under a seperate permits pa 202204081865. stair shop drawings deferred. | $170,526 |
| Sep 9, 2021 | Completed final sign-off May 2023 | 1 Post St | Bcci Construction Company | 23/f: revision to bpa#202103257304. assembly occupancy is revised to under 100. reduced occupant load to 90 11/30/21 updated scope of work: sffd operational assembly permit not required. per afm brown.Details
23/f: revision to bpa#202103257304. assembly occupancy is revised to under 100. reduced occupant load to 90 11/30/21 updated scope of work: sffd operational assembly permit not required. per afm brown. | |
| Mar 25, 2021 | Completed final sign-off Jun 2022 | 1 Post St | Bcci Construction Company | 23rd fl: tenant improvement of an (e) office space including (n) interior non-structural partitions and finishes, lighting & millwork. fire sprinkler under separate permit.Details
23rd fl: tenant improvement of an (e) office space including (n) interior non-structural partitions and finishes, lighting & millwork. fire sprinkler under separate permit. | $1,304,479 |