Mark Dilworth
- License
- C36624
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Dec 2018 to Oct 2022
7 permits since 2000 (architect on 7 permits): 2 completed, 5 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Turner Construction Co (5), Bcci Construction Company, Peacock Construction
- Architects
- Ashley G. Miller (2), David Kozolchyk Plotkin, Donna K Cook
- Engineers
- Amit Wadhwa, Levi G. Abarte, Stephen Marusigh
- Pmt consultant/expediters
- Neil Ginty
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2022 | Never finaled issued Oct 2022, no final | 1 Post St | Peacock Construction | suite #700: revision to pa# 202206307453. the conference rooms have been relocated, two conference room ceiling materials have been changed from t. bar to wood slats, misc power and data.Details
suite #700: revision to pa# 202206307453. the conference rooms have been relocated, two conference room ceiling materials have been changed from t. bar to wood slats, misc power and data. | $120,000 |
| Mar 25, 2021 | Completed final sign-off Jun 2022 | 1 Post St | Bcci Construction Company | 23rd fl: tenant improvement of an (e) office space including (n) interior non-structural partitions and finishes, lighting & millwork. fire sprinkler under separate permit.Details
23rd fl: tenant improvement of an (e) office space including (n) interior non-structural partitions and finishes, lighting & millwork. fire sprinkler under separate permit. | $1,304,479 |
| Mar 10, 2020 | Never finaled issued Nov 2020, no final | 1 Post St | Turner Construction Co | revision to pa 2017-1013-1240 to update overhead coiling door info at room service 104Details
revision to pa 2017-1013-1240 to update overhead coiling door info at room service 104 | |
| Feb 18, 2020 | Never finaled issued Mar 2021, no final | 1 Post St | Turner Construction Co | revision to pa #201710131240 & 201907095381, to update framing & door configuration at elevator lobby north exit. update lighting & security camera locations, door, hardware updates, & updated details for door operator pedestal.card readers are being installed, vif complianceDetails
revision to pa #201710131240 & 201907095381, to update framing & door configuration at elevator lobby north exit. update lighting & security camera locations, door, hardware updates, & updated details for door operator pedestal.card readers are being installed, vif compliance | $45,000 |
| Jul 9, 2019 | Never finaled issued Jul 2019, no final | 1 Post St | Turner Construction Co | revision to pa 201710131240 to amend exit passageway at north to 2 hour-rated wall partitions w/ 2 hour ductwrap at ductorkDetails
revision to pa 201710131240 to amend exit passageway at north to 2 hour-rated wall partitions w/ 2 hour ductwrap at ductork | |
| May 8, 2019 | Never finaled issued Jun 2019, no final | 1 Post St | Turner Construction Co | revision to 201710131240 to incorporate misc minor interior and civil plaza revisions. these include new mech louveres, bath revsion new fire extingishers, plaza revisions, etcDetails
revision to 201710131240 to incorporate misc minor interior and civil plaza revisions. these include new mech louveres, bath revsion new fire extingishers, plaza revisions, etc | |
| Dec 5, 2018 | Completed final sign-off Oct 2023 | 1 Post St | Turner Construction Co | non-structural demolition within the building foorprint on g/f. access to lobby space, required entries & stair exits to be maintained. area of work to remain vacant until all accessible feature are restore per ab-017.Details
non-structural demolition within the building foorprint on g/f. access to lobby space, required entries & stair exits to be maintained. area of work to remain vacant until all accessible feature are restore per ab-017. | $25,000 |