David Hayes
- License
- C37960
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, authorized agent-others
- Firm
- David Hayes Arch & Design
- Based in
- Sausalito
- On San Francisco permits
- Mar 2025 to Sep 2026
10 permits since 2000 (architect on 10 permits, authorized agent-others on 2 permits): 9 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Merlyn Construction (2), Wl Construction Group (2), K & K Builder Inc
- Engineers
- Marcus Yan (6), Marcus Yan
Where they worked
- Single-family 6
- Multi-family (2-family, apartments) 3
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 27, 2026 | In progress filed Sep 2026, not yet issued | 1159 Capitol Av | demolish one story shed at rear of main house | $2,000 | |
| Sep 27, 2026 | In progress filed Sep 2026, not yet issued | 1159 Capitol Av | demolish one story adu @ rear of main house | $4,000 | |
| Sep 24, 2026 | In progress filed Sep 2026, not yet issued | 1159 Capitol Av | erect a new 3 story duplex with 3 dwelling, attached adu. no basement- type vDetails
erect a new 3 story duplex with 3 dwelling, attached adu. no basement- type v | $850,000 | |
| Aug 31, 2026 | In progress filed Aug 2026, not yet issued | 1159 Capitol Av | demolish one story single family dwelling,no basement. type-vDetails
demolish one story single family dwelling,no basement. type-v | $12,000 | |
| Aug 18, 2026 | In progress issued Sep 2026 | 842 35th Av | Merlyn Construction | revision to bpa: 202507100512 - new slab under approved finished spaces at 1st floor, replacing (e) garage space. updated framing around stairwayDetails
revision to bpa: 202507100512 - new slab under approved finished spaces at 1st floor, replacing (e) garage space. updated framing around stairway | $10,000 |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 1369 Quesada Av | revision to pa #202502200728. deferred permit for last run deck stairs into back yard.Details
revision to pa #202502200728. deferred permit for last run deck stairs into back yard. | $5,000 | |
| Apr 9, 2026 | Expired or cancelled withdrawn Apr 2026 | 842 35th Av | revision pa# 202507100512, (e) deck to remian with no bedroom addition below, (e) doors & windows to remain out to deck at 2nd level, 1st level addition reduced at north & east sides, 1 bedroom eliminated, 1 bedroom changed to gym.Details
revision pa# 202507100512, (e) deck to remian with no bedroom addition below, (e) doors & windows to remain out to deck at 2nd level, 1st level addition reduced at north & east sides, 1 bedroom eliminated, 1 bedroom changed to gym. | $350,000 | |
| Sep 25, 2025 | In progress issued Feb 2026 | 2625 Balboa St | Wl Construction Group | relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate.Details
relocating kitchen, replace 1/2 bath w/ full bath on 1/f. add windows at the rear pop-out of the building to match existing, adding new windows to the east facade at the 1st floor, and renovating the 2nd floor bathroom. repairs to the rear exterior facade will be undertaken where appropriate. | $100,000 |
| Jul 23, 2025 | In progress issued Feb 2026 | 842 35th Av | Merlyn Construction | 1/f: addition of finishes space w/in footprint of (e) structure and rear deck, a new rear deck and renovations to the kitchen & bathrooms. new interior stairs connecting the 1/f & 2/f is the only exterior expansion.Details
1/f: addition of finishes space w/in footprint of (e) structure and rear deck, a new rear deck and renovations to the kitchen & bathrooms. new interior stairs connecting the 1/f & 2/f is the only exterior expansion. | $300,000 |
| Mar 31, 2025 | In progress issued Oct 2025 | 1369 Quesada Av | Wl Construction Group, K & K Builder Inc | conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairsDetails
conversion of sfd with 4 bed, 3 baths into a 3 bed, 2 bath, kitchenette & laundry room + state adu with 1 bed, 1 bath,laundry closet. add door to top of interior stairs for sep entries for primary unit & state adu.additional renovations to primary kitchen & bathroom. new 2 level deck and stairs | $100,000 |