Block 1380, lot 012
167 20th Ave
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 1,618 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 167 20th Av | Ace Drilling & Excavation | revision to pa #202410082505. changing " t" retaining wall to "l"Details
revision to pa #202410082505. changing " t" retaining wall to "l" | |
| Jan 20, 2026 | In progress issued Jun 2026 | 167 20th Av | Ace Drilling Engineering Inc | temporary shoring for garage addition per permit application 2024-1008-2505. detached structure.Details
temporary shoring for garage addition per permit application 2024-1008-2505. detached structure. | $65,000 |
| Oct 24, 2025 | In progress issued Jul 2026 | 167 20th Av | revision 202411084696: loft level: demo as req for new walls, windows, finishes,fixtures and flooring per new interior layout. main level, demo as req for new finishes at e walls receiving new shearwall sheathing. gr lvl: demo as req for foundation underpinning/repair,walls for new shearwallsDetails
revision 202411084696: loft level: demo as req for new walls, windows, finishes,fixtures and flooring per new interior layout. main level, demo as req for new finishes at e walls receiving new shearwall sheathing. gr lvl: demo as req for foundation underpinning/repair,walls for new shearwalls | $124,000 | |
| Jun 6, 2025 | In progress issued Jun 2025 | 167 20th Av | demolition & rebuild the front portion of an existing roof as approved by planning in submittal 2024-010417prj.Details
demolition & rebuild the front portion of an existing roof as approved by planning in submittal 2024-010417prj. | $54,000 | |
| Apr 15, 2025 | In progress issued Jan 2026 | 167 20th Av | front yrd garage add'n: demo (e) planting beds,lighting fixtures,retaining walls,concrete steps and excvation as reqd for new sub-terrianian garage with pour in place concrete walls, stairs and deck. new led lighting, planters and permeable surfaces.Details
front yrd garage add'n: demo (e) planting beds,lighting fixtures,retaining walls,concrete steps and excvation as reqd for new sub-terrianian garage with pour in place concrete walls, stairs and deck. new led lighting, planters and permeable surfaces. | $110,000 | |
| Feb 10, 2025 | Expired or cancelled cancelled Jan 2026 | 167 20th Av | bathroom modernization - remove & replace rotted walls & floor; as required. walls are non load bearing. new plumbing fixture throughout. all in kind replacement. limited dry-rot repair in kind as required.Details
bathroom modernization - remove & replace rotted walls & floor; as required. walls are non load bearing. new plumbing fixture throughout. all in kind replacement. limited dry-rot repair in kind as required. | $38,000 | |
| Nov 8, 2024 | In progress issued Apr 2025 | 167 20th Av | all levels general space reconfiguration. demo & replace non loading bearing walls, doors, cabinets, plumbing, electrical fixtures & finishes. no net increase 2f (e) plumbing fixture count & no significant structural work. (n) finishes throughout. basement floor replacement.Details
all levels general space reconfiguration. demo & replace non loading bearing walls, doors, cabinets, plumbing, electrical fixtures & finishes. no net increase 2f (e) plumbing fixture count & no significant structural work. (n) finishes throughout. basement floor replacement. | $70,000 | |
| Sep 16, 2024 | Expired or cancelled withdrawn May 2025 | 167 20th Av | front yard remodel . no work to (e) house demo planting beds of wooden tiers and concrete garden walls. along w/ concrete steps apprx. 148 cu3 of soil to be excavacted. (n) design will provide power for (n) gate for off street parking space. (n) concrete retaining wall less than 10ft in height,Details
front yard remodel . no work to (e) house demo planting beds of wooden tiers and concrete garden walls. along w/ concrete steps apprx. 148 cu3 of soil to be excavacted. (n) design will provide power for (n) gate for off street parking space. (n) concrete retaining wall less than 10ft in height, | $110,000 | |
| Oct 20, 2020 | Completed final sign-off Feb 2021 | 167 20th Av | Realty Builders Inc | like for like bathroom remodeling. replace tub, vanity, 2 lights, 2 switches, 1 gfi, 1 fanDetails
like for like bathroom remodeling. replace tub, vanity, 2 lights, 2 switches, 1 gfi, 1 fan | $18,000 |
| Jan 23, 2019 | Completed final sign-off May 2019 | 167 20th Av | Aidan Mc Cracken Const Inc. | add new laundry area. no interior walls. new plumbing & electrical.Details
add new laundry area. no interior walls. new plumbing & electrical. | $8,000 |
| Sep 6, 2018 | Completed final sign-off Mar 2019 | 167 20th Av | voluntary improvements to ground level to add plywood, anchor bolts to foundation and limited foundation upgradeDetails
voluntary improvements to ground level to add plywood, anchor bolts to foundation and limited foundation upgrade | $30,000 | |
| Aug 13, 2015 | Completed final sign-off Aug 2016 | 167 20th Av | per application, in kind replacement of 6-8 windows with wood windows with ogee lugs, double hung "in kind" style. three of the windows are visible from the street u factor =0.32Details
per application, in kind replacement of 6-8 windows with wood windows with ogee lugs, double hung "in kind" style. three of the windows are visible from the street u factor =0.32 | $8,000 | |
| May 7, 2015 | Completed final sign-off Aug 2015 | 167 20th Av | replacing 2 casement windows "in kind", not visible from the street.Details
replacing 2 casement windows "in kind", not visible from the street. | $8,000 | |
| Nov 25, 2013 | Never finaled issued Nov 2013, no final | 167 20th Av | street space permit (pw20131125308)Details
street space permit (pw20131125308) | ||
| Jul 2, 2002 | Completed final sign-off Oct 2002 | 167 20th Av | construction of new deck, including: demolition & removal of existing 4'x10' wood back porch, wood sDetails
construction of new deck, including: demolition & removal of existing 4'x10' wood back porch, wood s | $8,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ace Drilling & Excavation, Ace Drilling Engineering Inc, Aidan Mc Cracken Const Inc., Realty Builders Inc
- Architects
- Juan Duque (3)
- Engineers
- Akuavi Hine, Armarenda Prasad, Erwin O'toole, Marcus Yan
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.