Amarendra Prasad
- Listed as
- architect, engineer
- Firm
- Patrick Donato
- Based in
- Oakland
- On San Francisco permits
- Aug 2016 to Sep 2026
38 permits since 2000 (engineer on 33 permits, architect on 5 permits): 10 completed, 20 in progress, 4 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress issued Sep 2026 | 121 Moffitt St | comply with nov 202182450 construct firewalls on left & right side of deck. replace front glass railing. revision to 202412096395Details
comply with nov 202182450 construct firewalls on left & right side of deck. replace front glass railing. revision to 202412096395 | $10,000 | |
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 111 Lundys Ln | interior remodel. add new bathroom, convert portion of garage to habitable space. remodel existing kitchen and bathroom.Details
interior remodel. add new bathroom, convert portion of garage to habitable space. remodel existing kitchen and bathroom. | $400,000 | |
| Sep 4, 2026 | In progress issued Sep 2026 | 214 Bonview St | David M Goray | rev to pa# 2025-1002-6603: partial foundation replacement. structural modifications to the existing g+2 building including load assessment, reinforcement, and alterations. structural elements as per design.Details
rev to pa# 2025-1002-6603: partial foundation replacement. structural modifications to the existing g+2 building including load assessment, reinforcement, and alterations. structural elements as per design. | |
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 2531 26th Av | interior remodel of existing 2-story sfh. reconfigure floor plan layout. attached garage & stair; alter selected struc walls; infill portions of existing 1st & 2nd fl light wells; replace select windows; relocate/replace hvac, water heater, plumbing & electrical; add 464 conditoned fl area. ab-112Details
interior remodel of existing 2-story sfh. reconfigure floor plan layout. attached garage & stair; alter selected struc walls; infill portions of existing 1st & 2nd fl light wells; replace select windows; relocate/replace hvac, water heater, plumbing & electrical; add 464 conditoned fl area. ab-112 | $380,000 | |
| Jul 24, 2026 | In progress issued Aug 2026 | 457 Oak St | We Do Construction Inc. | revision to permit#202601143809. structural foundation, new footing that are added to new structure.Details
revision to permit#202601143809. structural foundation, new footing that are added to new structure. | $3,000 |
| Jul 7, 2026 | In progress issued Jul 2026 | 27 Paramount Tr | Jfieco | shear wall installation and holddowns. wall removal between kitchen and dining room. wall removal between living and dining room.Details
shear wall installation and holddowns. wall removal between kitchen and dining room. wall removal between living and dining room. | $8,000 |
| May 15, 2026 | In progress issued May 2026 | 1563 Dolores St | interior in-kind kitchen and bathroom remodel, demo & upgrade existing fixtures and cabinetry, upgrade ceiling lighting, minor plumbing, move opening in bedroom wall, minor demo of closet partition walls, replace exterior rearyard door & windows with sliding patio doo, move dryer and exhaust ventDetails
interior in-kind kitchen and bathroom remodel, demo & upgrade existing fixtures and cabinetry, upgrade ceiling lighting, minor plumbing, move opening in bedroom wall, minor demo of closet partition walls, replace exterior rearyard door & windows with sliding patio doo, move dryer and exhaust vent | $40,000 | |
| Feb 23, 2026 | In progress filed Feb 2026, not yet issued | 942 Wisconsin St | Pcr Demo & Services Inc Dba Pcr Construc | failing retaining wall in backyard. repair wall following structural engineer design & requestsDetails
failing retaining wall in backyard. repair wall following structural engineer design & requests | $30,000 |
| Jan 20, 2026 | In progress issued Jun 2026 | 167 20th Av | Ace Drilling Engineering Inc | temporary shoring for garage addition per permit application 2024-1008-2505. detached structure.Details
temporary shoring for garage addition per permit application 2024-1008-2505. detached structure. | $65,000 |
| Oct 3, 2025 | In progress filed Oct 2025, not yet issued | 648 18th Av | rear horizontal addition at levels 2 and 3, and new roof deck at level 3 rear. reconfigure existing kitchen and toilet room at level 2.Details
rear horizontal addition at levels 2 and 3, and new roof deck at level 3 rear. reconfigure existing kitchen and toilet room at level 2. | $100,000 | |
| Sep 10, 2025 | In progress issued Sep 2025 | 276 Ellsworth St | structural revision to permit 202506138678. structural redesign and reduction of current permitted foundation design. ref permits 202302031353, 202503212737.Details
structural revision to permit 202506138678. structural redesign and reduction of current permitted foundation design. ref permits 202302031353, 202503212737. | ||
| Jul 21, 2025 | In progress issued Jul 2025 | 1576 Golden Gate Av | unit 3/ 2nd/fl: bedroom beam replacement for reference pa#2025-0522-7125Details
unit 3/ 2nd/fl: bedroom beam replacement for reference pa#2025-0522-7125 | $1,000 | |
| Jul 18, 2025 | In progress issued Oct 2025 | 155 Moffitt St | Oudi Construction Dba Audi Construction | demo (e) damaged rear balcony; install (n) rear balcony; demo (e) repair aged patio slab; reinforce & install new patio slab; construct (n) spiral stairwayDetails
demo (e) damaged rear balcony; install (n) rear balcony; demo (e) repair aged patio slab; reinforce & install new patio slab; construct (n) spiral stairway | $75,000 |
| Jul 18, 2025 | Expired or cancelled withdrawn Jan 2026 | 758 Great Hy | Jose Martinez | kitchen remodel and 2 bathroom. remove existing walls between kitchen and living room.Details
kitchen remodel and 2 bathroom. remove existing walls between kitchen and living room. | $67,000 |
| Jul 2, 2025 | Completed final sign-off Mar 2026 | 25 Admiral Av | Ramos General Construction Inc. | remove unpermitted construction at 1st fl. convert rear portion of garage into day care room. day care room max 12 kids. install (n) bathroom at 1st fl. install fire rated corridor along garage. replace rear yard entry door.Details
remove unpermitted construction at 1st fl. convert rear portion of garage into day care room. day care room max 12 kids. install (n) bathroom at 1st fl. install fire rated corridor along garage. replace rear yard entry door. | $75,000 |
| May 6, 2025 | Expired or cancelled cancelled Jan 2026 | 345 Santa Clara Av | C H Burnham Inc | basement: convert portion to living space w/ bath, laundry, and storage. rebuild interior stair to basement. level 1: renovation of rear living space and kitchen, (n) powder room. level 2: full renovation of (e) bathrooms. replacement windows and some (n) windows. reduce size of garage.Details
basement: convert portion to living space w/ bath, laundry, and storage. rebuild interior stair to basement. level 1: renovation of rear living space and kitchen, (n) powder room. level 2: full renovation of (e) bathrooms. replacement windows and some (n) windows. reduce size of garage. | |
| Apr 22, 2025 | In progress issued Jun 2025 | 380 15th Av | repair front exterior stairs. reinforce front stairs with concrete footing and rebar. add low retaining wall for soil support. replace brick stair with brick.Details
repair front exterior stairs. reinforce front stairs with concrete footing and rebar. add low retaining wall for soil support. replace brick stair with brick. | $8,000 | |
| Apr 1, 2025 | Completed final sign-off Jun 2026 | 564 Chenery St | lower level: small 74 sfqt additon. new windows/doors. new electrical panel. no service change. upper level: replace windows/doors. remodel (e) kit + primary bath, addition is below (e) flr above. not visible from street. total area of alteration is 20% of existingDetails
lower level: small 74 sfqt additon. new windows/doors. new electrical panel. no service change. upper level: replace windows/doors. remodel (e) kit + primary bath, addition is below (e) flr above. not visible from street. total area of alteration is 20% of existing | $375,000 | |
| Mar 21, 2025 | Completed final sign-off Apr 2025 | 1330 Valencia St | revision to pa# 202410233585- to comply w/ bid nov# 202018451 - unit #a: legalize removal of load bearing wall in living room.Details
revision to pa# 202410233585- to comply w/ bid nov# 202018451 - unit #a: legalize removal of load bearing wall in living room. | $5,500 | |
| Mar 21, 2025 | In progress issued May 2025 | 276 Ellsworth St | revision to 202302031353. relocation to permitted kitchen and bath locations. add 1/2 bath. new finishes, revised mep per revised layout. remove ext. stair add deck less than 30" affDetails
revision to 202302031353. relocation to permitted kitchen and bath locations. add 1/2 bath. new finishes, revised mep per revised layout. remove ext. stair add deck less than 30" aff | ||
| Jan 23, 2025 | Completed final sign-off Apr 2026 | 1510 Dolores St | Matthew Kelly Construction Inc | remove & replace (e) wood stairs. like for like.Details
remove & replace (e) wood stairs. like for like. | $15,000 |
| Dec 19, 2024 | In progress issued Mar 2025 | 2851 Union St | Doyle Developments | complete remodel of (e) unit. new structural footing & floor framing. new rear windows and doors. remodel of kitchen and bath. add a bedroom. scope is rear grade/first level unit.Details
complete remodel of (e) unit. new structural footing & floor framing. new rear windows and doors. remodel of kitchen and bath. add a bedroom. scope is rear grade/first level unit. | $100,000 |
| Dec 12, 2024 | In progress issued Jan 2025 | 2030 29th Av | Natco Pregra Inc Dba Lifescaping Outdoor, Marsh Fence & Deck Company | demo sliding rear retaining wall and fence. add new retaining wall and new fence on top of retaining wall. 3 ft retaining wall and 7 ft fence on top.Details
demo sliding rear retaining wall and fence. add new retaining wall and new fence on top of retaining wall. 3 ft retaining wall and 7 ft fence on top. | $29,965 |
| Dec 2, 2024 | In progress issued Dec 2024 | 1563 Underwood Av | Valenciana Concrete Inc | install fire rated corridor adjacent to gargae. replace garage door. relocate fire rated door to garage. remove (e) stiar on the 2nd fl and enclosed (e) landing to create a new deck w/in building area.Details
install fire rated corridor adjacent to gargae. replace garage door. relocate fire rated door to garage. remove (e) stiar on the 2nd fl and enclosed (e) landing to create a new deck w/in building area. | $30,000 |
| Sep 10, 2024 | In progress issued Feb 2026 | 1575 17th Av | O'shea Co. Home Grown Construction | turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior.Details
turning 1st level garage to conditioned space w/ kitchen, half bath and living room. 2nd level is reorganized into 4 bedrooms, 3 full bath, laundry and family room. exterior new deck at 1st lvl from living room and closing off front entry stairs to be interior. | $150,000 |
| Feb 14, 2024 | Completed final sign-off Apr 2024 | 80 San Felipe Av | rev to pa# 2024-0123-4469; 3-4 steps compromised when removing, to be reparied discovered more steps compromised, repair steps in-kindDetails
rev to pa# 2024-0123-4469; 3-4 steps compromised when removing, to be reparied discovered more steps compromised, repair steps in-kind | ||
| Jan 16, 2024 | Completed final sign-off Jan 2026 | 30 San Felipe Av | build-in bbq grill area & seating area (stucco). level ground to allow visable area & retaining wall. fence & access gate. 2 small gazebo (150sf) & (50sf) & pavers.Details
build-in bbq grill area & seating area (stucco). level ground to allow visable area & retaining wall. fence & access gate. 2 small gazebo (150sf) & (50sf) & pavers. | $101 | |
| May 19, 2023 | In progress issued Jul 2024 | 450 39th Av | Daileyworks Construction | remodel 1st fl and add 439sf to 1st fl only at rear of property for two bedrmm 1000sf adu. no change to front facade. no change to building height. (new rear roof deck, spiral stairs, 2nd fl rear door, 2nd fl laundry room to be under separate permit).Details
remodel 1st fl and add 439sf to 1st fl only at rear of property for two bedrmm 1000sf adu. no change to front facade. no change to building height. (new rear roof deck, spiral stairs, 2nd fl rear door, 2nd fl laundry room to be under separate permit). | $200,000 |
| Dec 8, 2022 | Never finaled issued Dec 2022, no final | 1171 Palou Av | rev to pa# 2020-0826-2682: relocate one structural post and footing at new rear exterior decks, approximately 13'3" x 19'0" (203 sf) at the 1st fl. level and 8'3" x 19.0" (136 sf) at the 2nd fl.Details
rev to pa# 2020-0826-2682: relocate one structural post and footing at new rear exterior decks, approximately 13'3" x 19'0" (203 sf) at the 1st fl. level and 8'3" x 19.0" (136 sf) at the 2nd fl. | ||
| Aug 26, 2020 | Never finaled issued Jan 2022, no final | 1171 Palou Av | new exterior rear deck. approx 13'3" x 19'0"(203 sf) at the lower level and 8'3" x 19'0"(136sf) at the upper level.Details
new exterior rear deck. approx 13'3" x 19'0"(203 sf) at the lower level and 8'3" x 19'0"(136sf) at the upper level. | $25,000 | |
| Apr 10, 2018 | Completed final sign-off Apr 2019 | 46 Portola Dr | Atn Builders Inc | revision to pa 2017-1114-3988 - additional structural changes to plansDetails
revision to pa 2017-1114-3988 - additional structural changes to plans | $5,000 |
| Nov 3, 2017 | Completed final sign-off Mar 2019 | 46 Portola Dr | Atn Builders Inc | roof repair, add scope to pa #201707071250, reconfigure kitchen & bathroom, new half bath, new tempered glass railing in leiu of wall railing, new skylight. change (1) window to doors at rear. re-roof &roof repair. new washer/dryer hookup & related appliances. local structural reinforcing.Details
roof repair, add scope to pa #201707071250, reconfigure kitchen & bathroom, new half bath, new tempered glass railing in leiu of wall railing, new skylight. change (1) window to doors at rear. re-roof &roof repair. new washer/dryer hookup & related appliances. local structural reinforcing. | $14,000 |
| Aug 17, 2017 | Completed final sign-off Nov 2017 | 1520 06th Av | Gregory Loughran Construction | revision to pa 2017-0630-0825 reduce scope from previous plans to local strengthening with structural framing, with hold downs and shear walls with portion. other scope remains unchanged.Details
revision to pa 2017-0630-0825 reduce scope from previous plans to local strengthening with structural framing, with hold downs and shear walls with portion. other scope remains unchanged. | |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 108 Grand View Av | unit 108-a: adding 3 windows at unit "a" on 2nd level at the east side of the building. window sizes 3'3 x6' single hung. 2'-6-3-0 fixed & 2'-0 x 4-'6 single hung at kitchen, not visible from the streetDetails
unit 108-a: adding 3 windows at unit "a" on 2nd level at the east side of the building. window sizes 3'3 x6' single hung. 2'-6-3-0 fixed & 2'-0 x 4-'6 single hung at kitchen, not visible from the street | $4,000 | |
| Mar 21, 2017 | Expired or cancelled expired May 2020 | 1557 Lombard St | City Construction, Macrobuild Corporation | revision to pa 2016-1103-1867 - structural scope reduced, lightwell infill, title 24 & relocated master bath.Details
revision to pa 2016-1103-1867 - structural scope reduced, lightwell infill, title 24 & relocated master bath. | |
| Nov 28, 2016 | Never finaled issued Nov 2016, no final | 1386 Revere Av | Gmbc Construction Inc, Hon's Construction Inc., California Remodeling Service | revision to pa 2015-1223-5806 - additional detail to structural workDetails
revision to pa 2015-1223-5806 - additional detail to structural work | |
| Nov 3, 2016 | Expired or cancelled expired May 2020 | 1557 Lombard St | City Construction | complete interior remodel; garage door replacement & converting a portion of the (e) garage to living space; removal of (e) roof deck & adding a new roof deck; (e) building stucco siding & new roofing system to be installed; new rear yard and outdoor sink & grill.Details
complete interior remodel; garage door replacement & converting a portion of the (e) garage to living space; removal of (e) roof deck & adding a new roof deck; (e) building stucco siding & new roofing system to be installed; new rear yard and outdoor sink & grill. | $400,000 |
| Aug 16, 2016 | Completed final sign-off Dec 2016 | 1295 Monterey Bl | Fahan Construction | remodel bathroom @ 2nd floor, remove exisitng cabinets, fixtures & faucets, replace with new. mech, elec to remain in (e) locations. n/a maher ordinanceDetails
remodel bathroom @ 2nd floor, remove exisitng cabinets, fixtures & faucets, replace with new. mech, elec to remain in (e) locations. n/a maher ordinance | $20,000 |