Block 6713, lot 011
155 Moffitt St
- City’s use
- Single Family Residential
- Built
- 1951
- Stories
- 1
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 1,096 sq ft
- Lot
- 3,659 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 18, 2025 | In progress issued Oct 2025 | 155 Moffitt St | Oudi Construction Dba Audi Construction | demo (e) damaged rear balcony; install (n) rear balcony; demo (e) repair aged patio slab; reinforce & install new patio slab; construct (n) spiral stairwayDetails
demo (e) damaged rear balcony; install (n) rear balcony; demo (e) repair aged patio slab; reinforce & install new patio slab; construct (n) spiral stairway | $75,000 |
| Jan 3, 2025 | Completed final sign-off Feb 2025 | 155 Moffitt St | Oudi Construction Dba Audi Construction | total bath remodeling, tile, bathtub, converted to shower. remove existing door and convert to pocket door. no change in size.Details
total bath remodeling, tile, bathtub, converted to shower. remove existing door and convert to pocket door. no change in size. | $10,000 |
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 155 Moffitt St | U C Construction | remove ceiling and wall drywall. replace plywood with 1/2 inch, insulation and replace sheetrock with 5/8" type 'x'. install (4) recessed lights . remodel bathroom downstairs with new sheetrock and ceramic tiles. install new fixtures and 2 ressesed lights.Details
remove ceiling and wall drywall. replace plywood with 1/2 inch, insulation and replace sheetrock with 5/8" type 'x'. install (4) recessed lights . remodel bathroom downstairs with new sheetrock and ceramic tiles. install new fixtures and 2 ressesed lights. | $12,700 |
| Sep 2, 2021 | Completed final sign-off Feb 2022 | 155 Moffitt St | U C Construction | 5/8 gyp fireproofing installation in garageDetails
5/8 gyp fireproofing installation in garage | $4,500 |
| Jan 17, 2018 | Completed final sign-off Jan 2019 | 155 Moffitt St | San Francisco Earthquake Retrofitting | insulate front, rear, and right side perimter walls with woodrock insulation. add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field.Details
insulate front, rear, and right side perimter walls with woodrock insulation. add 5/8 anchor bolts with simpson set xp epoxy every 4 ft with 7" embedment to left, rear and 20 ft of right wall, add 1/2" osb struct 1 to left, rear and 10 ft of right side wall. 10d common at 6" e.n, 12" field. | $28,000 |
| Jan 6, 2014 | Completed final sign-off Mar 2014 | 155 Moffitt St | replace upper floor siding door, 1 window & siding on garden side of building, add insulation, not visible from street. u-factor 0.4 max. to comply with bid nov #201446001Details
replace upper floor siding door, 1 window & siding on garden side of building, add insulation, not visible from street. u-factor 0.4 max. to comply with bid nov #201446001 | $5,000 | |
| Jul 29, 2013 | Completed final sign-off Oct 2013 | 155 Moffitt St | Yu Kwan Construction Co. | remodle kitchen - replace cabinets, countertop, appliances, flooringDetails
remodle kitchen - replace cabinets, countertop, appliances, flooring | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Oudi Construction Dba Audi Construction (2), U C Construction (2), San Francisco Earthquake Retrofitting, Yu Kwan Construction Co.
- Engineers
- Amarendra Prasad
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.