U C Construction
- Based in
- Daly City
- On San Francisco permits
- Apr 2009 to Jul 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 155 Moffitt St | remove ceiling and wall drywall. replace plywood with 1/2 inch, insulation and replace sheetrock with 5/8" type 'x'. install (4) recessed lights . remodel bathroom downstairs with new sheetrock and ceramic tiles. install new fixtures and 2 ressesed lights.Details
remove ceiling and wall drywall. replace plywood with 1/2 inch, insulation and replace sheetrock with 5/8" type 'x'. install (4) recessed lights . remodel bathroom downstairs with new sheetrock and ceramic tiles. install new fixtures and 2 ressesed lights. | $12,700 |
| Jun 23, 2022 | Completed final sign-off Feb 2023 | 5134 03rd St | remodeling two existing bathroom on second floor.Details
remodeling two existing bathroom on second floor. | $31,000 |
| May 2, 2022 | Completed final sign-off Aug 2022 | 5134 03rd St | replace old counter tops. new countertops will be quartzDetails
replace old counter tops. new countertops will be quartz | $18,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 5134 03rd St | remodel 2 bathrooms on 3rd flDetails
remodel 2 bathrooms on 3rd fl | $40,000 |
| Sep 2, 2021 | Completed final sign-off Feb 2022 | 155 Moffitt St | 5/8 gyp fireproofing installation in garageDetails
5/8 gyp fireproofing installation in garage | $4,500 |
| Oct 23, 2020 | Completed final sign-off May 2021 | 1675 32nd Av | reference complaint# 202055991 to legalize as-built deck located at the rear of the building on the garage floor.Details
reference complaint# 202055991 to legalize as-built deck located at the rear of the building on the garage floor. | $20,000 |
| Jul 26, 2013 | Completed final sign-off Sep 2013 | 1999 Pacific Av | remove top landing and repair all dry rot front stairs and rebuild with new bricks. visible from street.Details
remove top landing and repair all dry rot front stairs and rebuild with new bricks. visible from street. | $3,500 |
| Nov 28, 2011 | Completed final sign-off Jan 2012 | 555 Columbus Av | replacement front windows in kind, exact replacement business onlyDetails
replacement front windows in kind, exact replacement business only | $4,500 |
| Apr 8, 2009 | Completed final sign-off Jul 2009 | 596 Athens St | replace 1 6x6 post on corner of russia street and athens st, supporting over head windows.Details
replace 1 6x6 post on corner of russia street and athens st, supporting over head windows. | $500 |