Back to bathroom remodel contractors
U C Construction
- Based in
- Daly City
- On San Francisco permits
- Apr 2009 to Jul 2022
- Last 24 months
- 0 permits filed
9 permits since 2000: 9 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 28 days from filing to permit and 133 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2022 | Completed final sign-off Sep 2022 | 155 Moffitt St | remove ceiling and wall drywall. replace plywood with 1/2 inch, insulation and replace sheetrock with 5/8" type 'x'. install (4) recessed lights . remodel bathroom downstairs with new sheetrock and ceramic tiles. install new fixtures and 2 ressesed lights.Details
remove ceiling and wall drywall. replace plywood with 1/2 inch, insulation and replace sheetrock with 5/8" type 'x'. install (4) recessed lights . remodel bathroom downstairs with new sheetrock and ceramic tiles. install new fixtures and 2 ressesed lights. | $12,700 |
| Jun 23, 2022 | Completed final sign-off Feb 2023 | 5134 03rd St | remodeling two existing bathroom on second floor.Details
remodeling two existing bathroom on second floor. | $31,000 |
| Feb 25, 2022 | Completed final sign-off Aug 2022 | 5134 03rd St | remodel 2 bathrooms on 3rd flDetails
remodel 2 bathrooms on 3rd fl | $40,000 |