Michael Goeringer
- License
- C31971
- Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
- About the two boards
- Look the license up with the state (Architects Board)
- Look up C31971 at the Board for Professional Engineers
- Listed as
- architect, engineer
- On San Francisco permits
- Mar 2023 to Aug 2025
5 permits since 2000 (architect on 4 permits, engineer on 1 permit): 1 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Daileyworks Construction (2), Yama Construction
- Engineers
- Amarendra Prasad
- Subcontractors
- Mark Powers
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 3
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2025 | In progress issued Aug 2025 | 450 39th Av | Daileyworks Construction | revision to 202305198149: non-structural interior wall layout changes & mech system change. removal adu. no change to height & front facadeDetails
revision to 202305198149: non-structural interior wall layout changes & mech system change. removal adu. no change to height & front facade | |
| Apr 10, 2025 | Expired or cancelled expired Jul 2026 | 450 39th Av | structural framing change and new foundation retail to accommodate field/construction conditions. revision to pa #202305198149.Details
structural framing change and new foundation retail to accommodate field/construction conditions. revision to pa #202305198149. | ||
| Dec 26, 2024 | Expired or cancelled expired Jul 2026 | 450 39th Av | revision to pa #202305198149 for structural framing changes.Details
revision to pa #202305198149 for structural framing changes. | ||
| May 19, 2023 | In progress issued Jul 2024 | 450 39th Av | Daileyworks Construction | remodel 1st fl and add 439sf to 1st fl only at rear of property for two bedrmm 1000sf adu. no change to front facade. no change to building height. (new rear roof deck, spiral stairs, 2nd fl rear door, 2nd fl laundry room to be under separate permit).Details
remodel 1st fl and add 439sf to 1st fl only at rear of property for two bedrmm 1000sf adu. no change to front facade. no change to building height. (new rear roof deck, spiral stairs, 2nd fl rear door, 2nd fl laundry room to be under separate permit). | $200,000 |
| Mar 13, 2023 | Completed final sign-off May 2023 | 38 Bryant St | Yama Construction | suite 2: 1/f: add 1 toilet next to (e) ada toilet.Details
suite 2: 1/f: add 1 toilet next to (e) ada toilet. | $25,000 |