Antoine Samra
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Tsa Structural Engineers
- On San Francisco permits
- Jun 2006 to Apr 2023
41 permits since 2000 (engineer on 37 permits, architect on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 30 completed, 2 in progress, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2023 | In progress issued Jun 2025 | 2459 Francisco St | Ams Construction, Nerland Building And Restoration | vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard.Details
vertical addition of new 3rd floor to include 3 bedrooms and 2 bathrooms. interior remodel of 2nd floor to include kitchen and bath remodel, (n) laundry room and (n) roof deck at rear. at 1st floor, create 1 hr. passageway for eero escape from rear yard. | $200,000 |
| Aug 25, 2022 | In progress issued Sep 2024 | 158 15th Av | Edri Construction Inc *See Notes*, Nerland Building And Restoration | 3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase.Details
3 story horizontal addition @ rear.all 3 levels increase the width of the(e)rear bump-out 5 feet,lower level,remodel (e)bath,convert garage & storage space to office,2 car tandem parking & family room/den.on main level,move kitchen to rear of house,add internal staircase. | $150,000 |
| Jul 2, 2021 | Completed final sign-off Apr 2026 | 454 Elizabeth St | Ams Construction, Nerland Building And Restoration | add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decksDetails
add 2-story extension at rear. 1st lvl- move bathrm, reconfig walls. 2nd lvl- convert full bath to half bath, (n) laundry, remove load bearing wall at dining rm, remodel kitchen. 3rd lvl- remodel bath, remove load bearing wall in front bedrm, create master suite w/(n) bath & closet.2 decks | $200,000 |
| Jun 8, 2021 | Completed final sign-off Jan 2023 | 2765 16th St | Constructive Solutions Inc. | remodel of (e) 174,160 sf building to create (n) tenant suites, suite a suite b & suite c, building uprades incl. replacement of roof, storefront system, seismic and structural upgrades, mep deferredDetails
remodel of (e) 174,160 sf building to create (n) tenant suites, suite a suite b & suite c, building uprades incl. replacement of roof, storefront system, seismic and structural upgrades, mep deferred | $2,162,160 |
| Dec 9, 2020 | Completed final sign-off Nov 2021 | 187 Denslowe Dr | Ibr Construction | revision to pa 202011098471. kitchen remodel at ground fl. replace existing windows to sliding door. wall demo between nook & existing kitchen area, door openingDetails
revision to pa 202011098471. kitchen remodel at ground fl. replace existing windows to sliding door. wall demo between nook & existing kitchen area, door opening | $15,000 |
| Aug 31, 2020 | Completed final sign-off Jul 2021 | 1123 Taraval St | Qiong Sun | remove existing wall between 2 suites for additional dining. new ada restroom, new ceiling.Details
remove existing wall between 2 suites for additional dining. new ada restroom, new ceiling. | $40,000 |
| Jul 15, 2020 | Completed final sign-off Apr 2022 | 877 Treat Av | Itu Construction | squaring of rear bay and addition of a new window.ecavation for new sunken patio, patio stair and addition of bedroom under deck at first floor.removal of parapet.new bay window at front facade.Details
squaring of rear bay and addition of a new window.ecavation for new sunken patio, patio stair and addition of bedroom under deck at first floor.removal of parapet.new bay window at front facade. | $30,000 |
| Jan 17, 2020 | Completed final sign-off Dec 2020 | 130 21st Av | Nerland Building And Restoration | build out basement/garage level to include bedroom, living room and bathroomDetails
build out basement/garage level to include bedroom, living room and bathroom | $50,000 |
| Jun 27, 2019 | Completed final sign-off May 2022 | 772 Guerrero St | Nerland Building And Restoration | build deck at rear of property on 2 levels. servicing units 774 & 772, tying into (e) stairs. existing stair to remain in place.Details
build deck at rear of property on 2 levels. servicing units 774 & 772, tying into (e) stairs. existing stair to remain in place. | $15,000 |
| Oct 12, 2018 | Completed final sign-off Aug 2019 | 322 21st Av | Professional Contracting Inc | revision to app#2018-0710-4166/2017-1206-5729. new shear wall at rear. slabs//also included is a 2 hour rated tradesman alley, awaiting the adu plans under a separate permitDetails
revision to app#2018-0710-4166/2017-1206-5729. new shear wall at rear. slabs//also included is a 2 hour rated tradesman alley, awaiting the adu plans under a separate permit | $20,000 |
| Aug 7, 2017 | Completed final sign-off May 2018 | 1440 Sacramento St | De Brus Construction Inc | soft story seismic upgrade per sfebc chapter 4d, 2016 cebc appendeix a-4.Details
soft story seismic upgrade per sfebc chapter 4d, 2016 cebc appendeix a-4. | $40,000 |
| Jul 21, 2017 | Completed final sign-off Sep 2017 | 651 12th Av | Foundations R Us | addition of bolts to garage framing foundation, sheating to walls, metal clips to walls.Details
addition of bolts to garage framing foundation, sheating to walls, metal clips to walls. | $7,500 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 633 San Bruno Av | V And Company, Incorporated | horizontal expansion @ 2nd fl (e) interior lightwell. (n) slider doors & windows @ rear facade to replace (e) doors & windows. replace rear stair w/ (n) stairs & landing. kitchen & bath surfac remodelDetails
horizontal expansion @ 2nd fl (e) interior lightwell. (n) slider doors & windows @ rear facade to replace (e) doors & windows. replace rear stair w/ (n) stairs & landing. kitchen & bath surfac remodel | $60,000 |
| May 11, 2017 | Completed final sign-off Sep 2017 | 2582 46th Av | Grand Finishes | remove window & replace with enlarge opening sliding door. add bathroom at garage (1st flr) level.Details
remove window & replace with enlarge opening sliding door. add bathroom at garage (1st flr) level. | $8,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2018 | 172 Parnassus Av | Rivera Builders | additional dwelling unit as part of seismic retrofit. refer to appln #201612134839 per ordinance 162-16Details
additional dwelling unit as part of seismic retrofit. refer to appln #201612134839 per ordinance 162-16 | $80,000 |
| Dec 14, 2016 | Expired or cancelled withdrawn Aug 2024 | 771 Grove St | voluntary structural reinforcementDetails
voluntary structural reinforcement | $65,000 | |
| Sep 15, 2016 | Completed final sign-off May 2017 | 3146 Mission St | E.A.Davidovits &Co.,Inc. | revision to pa#201603081459 change structural post drawing to match conditions. n/a ordinance #155-13Details
revision to pa#201603081459 change structural post drawing to match conditions. n/a ordinance #155-13 | |
| Sep 2, 2016 | Expired or cancelled cancelled Jan 2026 | 126 Roanoke St | replace dryrot damage deck, like for like.Details
replace dryrot damage deck, like for like. | $11,000 | |
| Sep 2, 2016 | Never finaled issued Dec 2016, no final | 307 08th Av | voluntary reinforcement of 1st floor/front, iebc 2012 appendix a-4.Details
voluntary reinforcement of 1st floor/front, iebc 2012 appendix a-4. | $6,000 | |
| Aug 5, 2016 | Expired or cancelled expired Nov 2018 | 145 Henry St | residential soft story per sfbc ch 34b: 2012 iebc appendix 4Details
residential soft story per sfbc ch 34b: 2012 iebc appendix 4 | $40,000 | |
| Jul 14, 2016 | Completed final sign-off Sep 2017 | 1570 11th Av | P 3 Construction & Remodeling Inc | in-fill under floor 2 sunroom to create area for floor 1 family room, 2 bedrooms and 1 bathroom. on floor 2, combine one bedroom with sun room to create master suite and add 1 bathroom.Details
in-fill under floor 2 sunroom to create area for floor 1 family room, 2 bedrooms and 1 bathroom. on floor 2, combine one bedroom with sun room to create master suite and add 1 bathroom. | $75,000 |
| Jul 12, 2016 | Completed final sign-off Jun 2018 | 1201 Church St | Mulhall Construction Inc. | soft story seismic renovation @ residential space per criteria asce 7-10. cut & path (e) exterior siding & interior finishes to perform work. (commercial #2016-0712-2100).Details
soft story seismic renovation @ residential space per criteria asce 7-10. cut & path (e) exterior siding & interior finishes to perform work. (commercial #2016-0712-2100). | $80,000 |
| Jul 12, 2016 | Completed final sign-off Aug 2018 | 1201 Church St | Mulhall Construction Inc. | soft story seismic renovation @ office commerical space per criteria asce 7-10. cut & path (e) exterior siding & interior finishes to perform structural work. remove 6 windows & 3 doors to perform work. (residential #2016-0712-2098)Details
soft story seismic renovation @ office commerical space per criteria asce 7-10. cut & path (e) exterior siding & interior finishes to perform structural work. remove 6 windows & 3 doors to perform work. (residential #2016-0712-2098) | $80,000 |
| Apr 7, 2016 | Completed final sign-off Aug 2016 | 2570 15th Av | American Builders | remodel of existing kitchen & family room, remove dividing wall & add beam & posts; new door & winodws at rear wall; new kitchen fixtures & finishes.Details
remodel of existing kitchen & family room, remove dividing wall & add beam & posts; new door & winodws at rear wall; new kitchen fixtures & finishes. | $50,000 |
| Feb 29, 2016 | Completed final sign-off Nov 2019 | 2255 San Jose Av | Ray Tom Construction | soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 and other rational design. n/a for maher. residential portion.Details
soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 and other rational design. n/a for maher. residential portion. | $28,000 |
| Feb 29, 2016 | Completed final sign-off Nov 2019 | 2255 San Jose Av | Ray Tom Construction | soft story upgrade per sfbc chapter 34b ada compliance. other rational design: asce 7-10 standard. n/a for maher. commercial portion.Details
soft story upgrade per sfbc chapter 34b ada compliance. other rational design: asce 7-10 standard. n/a for maher. commercial portion. | $28,000 |
| Feb 22, 2016 | Never finaled filed Feb 2016, never issued | 122 Gambier St | Nerland Building And Restoration | horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs.Details
horizontal addition to the rear with a roof deck servicing 2nd fl. renovate kitchen & bathroom on 2nd fl, add bathroom & 2 bedrom downstairs. | $85,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2017 | 2434 Mission St | Kl Construction Group | soft story retrofit per sfbc chapter 34b engineering criteria other rational design.Details
soft story retrofit per sfbc chapter 34b engineering criteria other rational design. | $60,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2017 | 2434 Mission St | Kl Construction Group | soft story retrofit per sfbc chapter 34b engineering criteria other rational design. (cbc 2013 75%)Details
soft story retrofit per sfbc chapter 34b engineering criteria other rational design. (cbc 2013 75%) | $30,000 |
| May 29, 2015 | Completed final sign-off Nov 2017 | 2434 Mission St | All Applied Construction Inc | change of use from m/b, r1 to a2, r1. (n) restaurant. (n) kitchen, (n) ada restrooms, (n) hoods.Details
change of use from m/b, r1 to a2, r1. (n) restaurant. (n) kitchen, (n) ada restrooms, (n) hoods. | $180,000 |
| Dec 22, 2014 | Completed final sign-off May 2015 | 2480 22nd Av | repair spalled concrete foundation in garage. voluntary seismic upgrade in garage.Details
repair spalled concrete foundation in garage. voluntary seismic upgrade in garage. | $4,000 | |
| Nov 6, 2012 | Completed final sign-off Jun 2013 | 806 Noe St | new foundation at ground floor; revision to permit 201205231113, lower slab and foundation in laundry areaDetails
new foundation at ground floor; revision to permit 201205231113, lower slab and foundation in laundry area | $10,000 | |
| Jan 24, 2012 | Completed final sign-off Jun 2012 | 506 16th Av | Nerland Building And Restoration | new deck at rear.Details
new deck at rear. | $5,000 |
| May 31, 2011 | Completed final sign-off Jun 2012 | 249 Rivoli St | Foundations R Us | foundation replacement, bath and bedroom renovation at 1st floor, new laundry room, storage, and utility room at gr floor,Details
foundation replacement, bath and bedroom renovation at 1st floor, new laundry room, storage, and utility room at gr floor, | $60,000 |
| Sep 14, 2010 | Completed final sign-off Jun 2013 | 234 09th St | Finbarr Collins Construction Inc. | interior renov w/exiting shell. incl 730 sf. on (n) outdoor open space within 2 (n) courtyards. subtracted from (e) building volume. (n) windows on n.w. & s. facedes no change to east (street facing) facade. no change to # of parking space (1). conversion of offices to residential (single family).Details
interior renov w/exiting shell. incl 730 sf. on (n) outdoor open space within 2 (n) courtyards. subtracted from (e) building volume. (n) windows on n.w. & s. facedes no change to east (street facing) facade. no change to # of parking space (1). conversion of offices to residential (single family). | $125,000 |
| Mar 22, 2010 | Expired or cancelled expired Jan 2013 | 118 Brewster St | Cas Construction | comply with nov# 201033661-remove (e) structural shear wall between kitchen & living room, replace with steel roomDetails
comply with nov# 201033661-remove (e) structural shear wall between kitchen & living room, replace with steel room | $5,000 |
| Oct 10, 2008 | Completed final sign-off Dec 2009 | 1381 Sanchez St | renovations at the extg 2nd floor and converting the unfinished garage into living space. the kichn, dining room,bathroom and bedrooms on the 2nd floor will be renovated. at garage level add 2 bth and 2 bedrooms with closetsDetails
renovations at the extg 2nd floor and converting the unfinished garage into living space. the kichn, dining room,bathroom and bedrooms on the 2nd floor will be renovated. at garage level add 2 bth and 2 bedrooms with closets | $90,000 | |
| Sep 24, 2008 | Completed final sign-off Jun 2010 | 1400 Diamond St | Spark Construction | new foundations, new beams in garage, new shear walls. voluntary foundation upgrade. excavation for new slab at ground level.Details
new foundations, new beams in garage, new shear walls. voluntary foundation upgrade. excavation for new slab at ground level. | $2,500 |
| Oct 10, 2007 | Never finaled issued Oct 2007, no final | 1200 47th Av | renewal pa 200610124863 to continure work.Details
renewal pa 200610124863 to continure work. | $5,001 | |
| Jul 6, 2006 | Expired or cancelled expired Jun 2007 | 39 Santa Marina St | foundation of cottage in rearDetails
foundation of cottage in rear | $8,000 | |
| Jun 12, 2006 | Expired or cancelled cancelled Dec 2011 | 5825 Mission St | int&ext.improv to(e)2 story,type-2,1 hr church bldg&constr(n)2 story type5,1-hr addition in rear w/2 hr. area seperation betwn.renov lobby,install(n)w.c.lift,repaint of exist(n) storefront windows,doors&(n)glass&steel marquee in frt facade.(n)accessible parkg stalls,parkg strip,landscape&hardscape.Details
int&ext.improv to(e)2 story,type-2,1 hr church bldg&constr(n)2 story type5,1-hr addition in rear w/2 hr. area seperation betwn.renov lobby,install(n)w.c.lift,repaint of exist(n) storefront windows,doors&(n)glass&steel marquee in frt facade.(n)accessible parkg stalls,parkg strip,landscape&hardscape. | $2,500,000 |