Block 3609, lot 006
2434 Mission St
- City’s use
- Commercial Hotel
- Built
- 1900
- Stories
- 3
- Units
- 8
- Rooms
- 6 bathrooms
- Building
- 8,764 sq ft
- Lot
- 3,150 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 6, 2017 | Completed final sign-off Sep 2017 | 2434 Mission St | Crime Watch Security Sys Llc | installation of a new sprinkler monitoring system ref pa 2015-0529-7497 and 2016-1104-1952Details
installation of a new sprinkler monitoring system ref pa 2015-0529-7497 and 2016-1104-1952 | $3,000 |
| Sep 1, 2017 | Never finaled issued Sep 2017, no final | 2434 Mission St | Ok Fire System | install a ul300 fire system in a kitchen hood. ref pa 2015-1218-5575. tie-in to fire alarm under separate submittal by others.Details
install a ul300 fire system in a kitchen hood. ref pa 2015-1218-5575. tie-in to fire alarm under separate submittal by others. | $6,700 |
| Jan 17, 2017 | Never finaled issued Jan 2017, no final | 2434 Mission St | street space w/mtaDetails
street space w/mta | ||
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 2434 Mission St | street spaceDetails
street space | ||
| Nov 4, 2016 | Never finaled issued Nov 2016, no final | 2434 Mission St | Pro Plumbing & Fire Sprinkler Inc | 1st flr: install fire sprinkler system (58 new heads) in restaurant area by tapping into (e) sprinkler system, ref 201505297497Details
1st flr: install fire sprinkler system (58 new heads) in restaurant area by tapping into (e) sprinkler system, ref 201505297497 | $32,000 |
| Sep 6, 2016 | Completed final sign-off Nov 2017 | 2434 Mission St | Tony Chang | revision to ref pa 201505297497: eliminated fire resistant coating product steel frames for approved gypsum association fire resistant design.Details
revision to ref pa 201505297497: eliminated fire resistant coating product steel frames for approved gypsum association fire resistant design. | |
| Aug 10, 2016 | Completed final sign-off Jul 2017 | 2434 Mission St | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $31,600 |
| Jul 28, 2016 | Completed final sign-off Nov 2017 | 2434 Mission St | Tony Chang | revision to pa#201505297497- eliminating fire resistant coating product between proposed g/f restaurant & residence above for fire sprinkler system. fire sprinkler is a deferred submitalDetails
revision to pa#201505297497- eliminating fire resistant coating product between proposed g/f restaurant & residence above for fire sprinkler system. fire sprinkler is a deferred submital | |
| Jul 11, 2016 | Never finaled issued Jul 2016, no final | 2434 Mission St | street space permitDetails
street space permit | ||
| Apr 20, 2016 | Never finaled issued Apr 2016, no final | 2434 Mission St | streetspace and sidewalkDetails
streetspace and sidewalk | ||
| Dec 30, 2015 | Never finaled issued Dec 2015, no final | 2434 Mission St | street spaceDetails
street space | ||
| Dec 18, 2015 | Completed final sign-off Jul 2017 | 2434 Mission St | Kl Construction Group | soft story retrofit per sfbc chapter 34b engineering criteria other rational design.Details
soft story retrofit per sfbc chapter 34b engineering criteria other rational design. | $60,000 |
| Dec 18, 2015 | Completed final sign-off Jul 2017 | 2434 Mission St | Kl Construction Group | soft story retrofit per sfbc chapter 34b engineering criteria other rational design. (cbc 2013 75%)Details
soft story retrofit per sfbc chapter 34b engineering criteria other rational design. (cbc 2013 75%) | $30,000 |
| Dec 4, 2015 | Completed final sign-off Nov 2017 | 2434 Mission St | Tony Chang | interior demolition, no load bearing wall. remove restroom, and fixtures. remove tilesDetails
interior demolition, no load bearing wall. remove restroom, and fixtures. remove tiles | $6,000 |
| May 29, 2015 | Completed final sign-off Nov 2017 | 2434 Mission St | All Applied Construction Inc | change of use from m/b, r1 to a2, r1. (n) restaurant. (n) kitchen, (n) ada restrooms, (n) hoods.Details
change of use from m/b, r1 to a2, r1. (n) restaurant. (n) kitchen, (n) ada restrooms, (n) hoods. | $180,000 |
| May 30, 2013 | Completed final sign-off Aug 2013 | 2434 Mission St | Trim Fit Constr. - O'reilly Engineering | to comply with ordinance 029-13 only. installation of grab bars in sro. install grab bars in 5 bathrooms, total of 10 bars.Details
to comply with ordinance 029-13 only. installation of grab bars in sro. install grab bars in 5 bathrooms, total of 10 bars. | $500 |
| Oct 25, 2007 | Never finaled issued Oct 2007, no final | 2434 Mission St | street spaceDetails
street space | ||
| Dec 7, 2006 | Never finaled issued Dec 2006, no final | 2434 Mission St | street spaceDetails
street space | ||
| Oct 24, 2006 | Completed final sign-off Nov 2007 | 2434 Mission St | storefront and interior ti work renovation. change of occupancy a-3 to bDetails
storefront and interior ti work renovation. change of occupancy a-3 to b | $50,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.