W. Wong Construction Co. Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Feb 2023
- Last 24 months
- 0 permits filed
144 permits since 2000: 76 completed, 52 never finaled, 16 expired or cancelled.
Of the 52 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 40 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 6 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2023 | Never finaled issued Feb 2023, no final | 4 Embarcadero Center | add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit.Details
add one entrance door to lobby of plaza area, fill (e) niche at walk way for part of cold storage within restaurant kitchen. fire sprinkler and life safety under seperate permit. | $50,000 |
| Sep 10, 2014 | Completed final sign-off Oct 2014 | 4489 17th St | work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures.Details
work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures. | $8,000 |
| Jul 29, 2014 | Never finaled issued Aug 2014, no final | 1401 Polk St | propose hvac system and kitchen hood and duct system to tenant improvement work under pa#201211013355Details
propose hvac system and kitchen hood and duct system to tenant improvement work under pa#201211013355 | $20,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 1253 Exposition Dr | unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not requiredDetails
unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not required | $7,500 |
| Apr 5, 2013 | Never finaled issued Apr 2013, no final | 1409 Sutter St | replace steel beam in kitchen. replace a section of wall between dining room in basement with new steel beam. lower slab at front portion of existing basement within the dining room with raised curb and new slab.Details
replace steel beam in kitchen. replace a section of wall between dining room in basement with new steel beam. lower slab at front portion of existing basement within the dining room with raised curb and new slab. | $30,000 |
| Jan 29, 2013 | Completed final sign-off Feb 2014 | 1409 Sutter St | renovate (e) kitchen & dining rooms. provide lodging for (e) private club change of use to r-1 occupancy. upgrade exist ground level bathrms to accessible. provide upgraded rescue windows to comply with sec 1029 & 715. no details or sched provided. sprinkler, life safty, hood sys under sep permitDetails
renovate (e) kitchen & dining rooms. provide lodging for (e) private club change of use to r-1 occupancy. upgrade exist ground level bathrms to accessible. provide upgraded rescue windows to comply with sec 1029 & 715. no details or sched provided. sprinkler, life safty, hood sys under sep permit | $350,000 |
| Nov 30, 2011 | Completed final sign-off May 2013 | 455 Vallejo St | penthouse #7-remodel (e) unit to include relocation of kitchen, remodel all bathrooms. add 1 bathroom & 1 powder room. new floor & wall. repair sagging beams, replace all windows & skylights with double pane glass, remove (e) skylights as shown. replace terrace railingsDetails
penthouse #7-remodel (e) unit to include relocation of kitchen, remodel all bathrooms. add 1 bathroom & 1 powder room. new floor & wall. repair sagging beams, replace all windows & skylights with double pane glass, remove (e) skylights as shown. replace terrace railings | $450,000 |
| May 3, 2011 | Expired or cancelled expired Jul 2012 | 2550 Van Ness Av | replace store front, relocate entrance stairs, replace storefront w' sunroof on filbert st. erect exercise rm w/ steam rm, men's and women's rooms. erect employee's lounge on 1st fl;. replace restaurant kitchen equipments & seats. new boardroom at 2nd flDetails
replace store front, relocate entrance stairs, replace storefront w' sunroof on filbert st. erect exercise rm w/ steam rm, men's and women's rooms. erect employee's lounge on 1st fl;. replace restaurant kitchen equipments & seats. new boardroom at 2nd fl | $100,000 |
| May 10, 2010 | Completed final sign-off Apr 2011 | 282 31st Av | remodel kitchen and bathroom. interior work only.Details
remodel kitchen and bathroom. interior work only. | $15,000 |
| Dec 14, 2009 | Completed final sign-off Feb 2010 | 718 37th Av | comply with nov# 200918321-remove illegal built kitchen on 1st fl/garage level, add 1 bedroom at rear on 1st floorDetails
comply with nov# 200918321-remove illegal built kitchen on 1st fl/garage level, add 1 bedroom at rear on 1st floor | $5,000 |
| Oct 18, 2004 | Completed final sign-off Dec 2004 | 1214 33rd Av | replace 2/f kitchen cabinet/counter,replace 3/f bathroom fixtures,replace tiles,no structural changeDetails
replace 2/f kitchen cabinet/counter,replace 3/f bathroom fixtures,replace tiles,no structural change | $20,000 |