Back to bathroom remodel contractors
W. Wong Construction Co. Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Feb 2023
- Last 24 months
- 0 permits filed
144 permits since 2000: 76 completed, 52 never finaled, 16 expired or cancelled.
Of the 52 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 40 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 11 completed, 5 never finaled, 2 expired or cancelled. Typically 4 days from filing to permit and 210 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 67 Twin Peaks Bl | remodel master bathroom, replace floor tile, bathroom fixtures, repair and replace dryrot flooring plywood as needed.Details
remodel master bathroom, replace floor tile, bathroom fixtures, repair and replace dryrot flooring plywood as needed. | $5,000 |
| Oct 17, 2019 | Expired or cancelled expired Oct 2023 | 2050 Jackson St | interior remodel of ground floor to consist of adding 1 bedroom to family room and increasing bathroom size by reducing laundry room n/a maherDetails
interior remodel of ground floor to consist of adding 1 bedroom to family room and increasing bathroom size by reducing laundry room n/a maher | $5,000 |
| Sep 13, 2019 | Completed final sign-off Sep 2021 | 557 03rd Av | remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage at 3rd floor. add 2 new skylights and 6 dormers at roof.Details
remove partition wall at 1st floor and relocate bathroom fixtures. install 2 new tankless water heater. add 1 new master bathroom and bedroom at 2nd floor. add 1 new bedrooms, bathroom, and storage at 3rd floor. add 2 new skylights and 6 dormers at roof. | $150,000 |
| Jun 19, 2019 | Completed final sign-off Dec 2019 | 1601 Quesada Av | renovation. ada barrier removal and deferred maintenance repair. prop-up wooden fence. repair and replace bathroom fixtures in-kind on basement level. (e) heating system to remain.Details
renovation. ada barrier removal and deferred maintenance repair. prop-up wooden fence. repair and replace bathroom fixtures in-kind on basement level. (e) heating system to remain. | $400,000 |
| Jan 14, 2015 | Never finaled issued Jan 2015, no final | 1950 Mission St | replace (e) bathroom, shower and laundry room fixtures.Details
replace (e) bathroom, shower and laundry room fixtures. | $30,000 |
| Sep 10, 2014 | Completed final sign-off Oct 2014 | 4489 17th St | work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures.Details
work @ unit# 3 only. remodel kitchen, replace cabinet, countertop, and floor tile. remodel bathroom, replace plumbing fixtures. | $8,000 |
| Aug 22, 2014 | Never finaled issued Aug 2014, no final | 750 Kearny St | 5th flr: remodel (e) fitness center, remodel (e) sales office become spa treatment center, works include demolition, new walls, and ceiling, new cabinet, new ada bathroom, mepp and fire sprinkler, fire alarm under separate permit. maher n/aDetails
5th flr: remodel (e) fitness center, remodel (e) sales office become spa treatment center, works include demolition, new walls, and ceiling, new cabinet, new ada bathroom, mepp and fire sprinkler, fire alarm under separate permit. maher n/a | $100,000 |
| Jan 24, 2014 | Never finaled issued Jan 2014, no final | 884 North Point St | revision to app#201312194665. revise layout of bathroom and bedroom to reflect building condition. n/a for maher ordinance no. 155-13Details
revision to app#201312194665. revise layout of bathroom and bedroom to reflect building condition. n/a for maher ordinance no. 155-13 | |
| Oct 29, 2013 | Completed final sign-off Mar 2014 | 2809 San Bruno Av | to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms.Details
to convert extg retail space to state licensed medical massage therapy establishment. remove non load bearing wall, install, h c bathroom, shower room, therapy rooms. | $60,000 |
| Mar 14, 2013 | Completed final sign-off Oct 2013 | 750 Kearny St | to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th flDetails
to comply with nov 201259521. convert 3rd fl bath to storage room. enlarge electrical closet at 5th fl | $5,000 |
| Nov 2, 2012 | Completed final sign-off Feb 2013 | 165 Jefferson St | change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd public assembly permit is required for 163 persons.Details
change of use. convert existing retail (m) to bar (a-2). install new non load bearing partitons, accessible mens and womens bathrooms, storage area and counters. storefront on separate permit. sffd public assembly permit is required for 163 persons. | $350,000 |
| Nov 1, 2012 | Completed final sign-off Nov 2014 | 1401 Polk St | change of use per planning #2000297. new kichen, handicap bathroom, counter, walkin cooler, equipment hookup.Details
change of use per planning #2000297. new kichen, handicap bathroom, counter, walkin cooler, equipment hookup. | $150,000 |
| Apr 5, 2012 | Never finaled issued Apr 2012, no final | 112 07th St | interior demo of non structural partitions, equipment and finishes at existing restaurant, meeting rooms, bathroom, and storage space on gr floor and basement. no exterior elements altered. prepare for future tenant improvement.Details
interior demo of non structural partitions, equipment and finishes at existing restaurant, meeting rooms, bathroom, and storage space on gr floor and basement. no exterior elements altered. prepare for future tenant improvement. | $10,000 |
| Feb 22, 2012 | Completed final sign-off May 2013 | 455 Vallejo St | penthouse 7- revision to to pa# 201111309769. reconfigure bathroom layoutDetails
penthouse 7- revision to to pa# 201111309769. reconfigure bathroom layout | |
| Nov 30, 2011 | Completed final sign-off May 2013 | 455 Vallejo St | penthouse #7-remodel (e) unit to include relocation of kitchen, remodel all bathrooms. add 1 bathroom & 1 powder room. new floor & wall. repair sagging beams, replace all windows & skylights with double pane glass, remove (e) skylights as shown. replace terrace railingsDetails
penthouse #7-remodel (e) unit to include relocation of kitchen, remodel all bathrooms. add 1 bathroom & 1 powder room. new floor & wall. repair sagging beams, replace all windows & skylights with double pane glass, remove (e) skylights as shown. replace terrace railings | $450,000 |
| Dec 17, 2010 | Expired or cancelled expired Jul 2012 | 2550 Van Ness Av | remove carpet, remove bath tub and bathroom fixtures. remove baseboard, prepare for future improvement. hotel is emptyDetails
remove carpet, remove bath tub and bathroom fixtures. remove baseboard, prepare for future improvement. hotel is empty | $10,000 |
| May 10, 2010 | Completed final sign-off Apr 2011 | 282 31st Av | remodel kitchen and bathroom. interior work only.Details
remodel kitchen and bathroom. interior work only. | $15,000 |
| Oct 18, 2004 | Completed final sign-off Dec 2004 | 1214 33rd Av | replace 2/f kitchen cabinet/counter,replace 3/f bathroom fixtures,replace tiles,no structural changeDetails
replace 2/f kitchen cabinet/counter,replace 3/f bathroom fixtures,replace tiles,no structural change | $20,000 |