Block 0538, lot 007
2314 Green St
- City’s use
- Commercial Misc
- Built
- 1948
- Stories
- 3
- Rooms
- 12 bathrooms
- Lot
- 31,493 sq ft
- Zoning
- RH3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 26, 2026 | In progress issued Mar 2026 | 2350 Green St | Johnson Controls Fire | revision 202312011757 s3 relocate and add devices per new backgrounds. add (1) smoke detector, 1 lam and tamper switch and wall mounted red strobeDetails
revision 202312011757 s3 relocate and add devices per new backgrounds. add (1) smoke detector, 1 lam and tamper switch and wall mounted red strobe | |
| Jul 31, 2025 | Completed final sign-off Aug 2025 | 2350 Green St | Pribuss Engineering Inc | repair a broken section of existing 6" cast underground pipe and replace with new ductile iron pipe. for fire sprinkler. ref 202312011757Details
repair a broken section of existing 6" cast underground pipe and replace with new ductile iron pipe. for fire sprinkler. ref 202312011757 | $6,000 |
| Jul 16, 2025 | Completed final sign-off Mar 2026 | 2350 Green St | Pribuss Engineering Inc | ref pa# 202312011757-s1. extend (e) wet sprinkler system from basement into new parking lot/ parking structure w/dedicated zone cntrol riser assembly. provide extra hazard group ii sprinkler protection (0.40 gpm/sqft over 2500 sqft) at future ev charger area. provide ordinary hazard group ii sprinklDetails
ref pa# 202312011757-s1. extend (e) wet sprinkler system from basement into new parking lot/ parking structure w/dedicated zone cntrol riser assembly. provide extra hazard group ii sprinkler protection (0.40 gpm/sqft over 2500 sqft) at future ev charger area. provide ordinary hazard group ii sprinkl | $46,750 |
| Feb 18, 2025 | In progress issued Mar 2025 | 2350 Green St | Build Group Inc. | revision to 202312011757 s1. foundation along grid p.a. have been updated to reflect a reduction in vertical gravity load. as divided by the owner, a portion of the structute north of grid p.a. has been entirely eliminated resulting in reduced laod. this change does not impact structural design,Details
revision to 202312011757 s1. foundation along grid p.a. have been updated to reflect a reduction in vertical gravity load. as divided by the owner, a portion of the structute north of grid p.a. has been entirely eliminated resulting in reduced laod. this change does not impact structural design, | |
| Nov 4, 2024 | In progress issued Nov 2024 | 2350 Green St | Build Group Inc. | stormwater pid plan check revision 202312011757Details
stormwater pid plan check revision 202312011757 | |
| Dec 1, 2023 | In progress issued Jun 2024 | 2350 Green St | Build Group Inc. | new structure is proposed to be an open private parking garage which locates on the merged lot 7 & lot 13 w/ a play yard above as an occupied roof.play yard is intended to accomodate students use during recess.property line adjustment app has been submitted.Details
new structure is proposed to be an open private parking garage which locates on the merged lot 7 & lot 13 w/ a play yard above as an occupied roof.play yard is intended to accomodate students use during recess.property line adjustment app has been submitted. | $3,000,000 |
| Jun 6, 2023 | Completed final sign-off Aug 2024 | 2350 Green St | re-roofing the lower school, middle school & gym buildings.Details
re-roofing the lower school, middle school & gym buildings. | $140,000 | |
| May 21, 2021 | Completed final sign-off Dec 2021 | 2350 Green St | Whiteside Construction Corp. | voluntary seismic improvements to address the soft storyDetails
voluntary seismic improvements to address the soft story | $25,000 |
| Jul 6, 2020 | Never finaled filed Jul 2020, never issued | 2350 Green St | renovation to address seismic issues in schools tier 1 analysis of bldgs, improve ada access to the lower & middle schools, create a single point of entry and connect the lower school to the middle school through vertical & horizontal circulation, relocate reception to front of school for security &Details
renovation to address seismic issues in schools tier 1 analysis of bldgs, improve ada access to the lower & middle schools, create a single point of entry and connect the lower school to the middle school through vertical & horizontal circulation, relocate reception to front of school for security & | $10,000,000 | |
| Jun 10, 2020 | Expired or cancelled cancelled Jan 2026 | 2350 Green St | remove an existing dropped acoustical ceiling in the existing basement cafeteria. no structural, electrical or plumbing workDetails
remove an existing dropped acoustical ceiling in the existing basement cafeteria. no structural, electrical or plumbing work | $5,000 | |
| May 4, 2015 | Never finaled issued Jun 2015, no final | 2350 Green St | removal of non-bearing interior stud wall on 2nd floor to combine two rooms. installation of new exit/entrance doors. installation of new accessible handrail of west entrance exterior stairway. no change to mechanical and lighting. maher n/a.Details
removal of non-bearing interior stud wall on 2nd floor to combine two rooms. installation of new exit/entrance doors. installation of new accessible handrail of west entrance exterior stairway. no change to mechanical and lighting. maher n/a. | $15,000 | |
| Nov 25, 2014 | Never finaled issued Nov 2014, no final | 2350 Green St | street spaceDetails
street space | ||
| Jul 31, 2014 | Completed final sign-off Aug 2014 | 2350 Green St | International Fire Equip | installation of 11 concealed head in hallway and class room. reinstall 10 upright and 9 pendent back in storage area. archdiocese of sf and school jp. ref #201406309957. n/a for the maher #155-13Details
installation of 11 concealed head in hallway and class room. reinstall 10 upright and 9 pendent back in storage area. archdiocese of sf and school jp. ref #201406309957. n/a for the maher #155-13 | $9,500 |
| Jul 30, 2014 | Completed final sign-off Oct 2014 | 2350 Green St | D C S Construction Services Inc | structual revisison to permit #2014-0630-9957. remove bearing wall 1'-6" south of fridline 2. replace w/ glb with poist and new footings. remove bearing wall 13'-3" north of gridline 2. replace with glb, post and footing.Details
structual revisison to permit #2014-0630-9957. remove bearing wall 1'-6" south of fridline 2. replace w/ glb with poist and new footings. remove bearing wall 13'-3" north of gridline 2. replace with glb, post and footing. | $15,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2015 | 2350 Green St | D C S Construction Services Inc | demolition of 38 l.f. of hallway and 6 doors. construction of new 84 lf of hallway with 9 doors. construction of ada unisex restroom, drinking fountain, public telephone. replacement of lighting in hallway. maher n/a.Details
demolition of 38 l.f. of hallway and 6 doors. construction of new 84 lf of hallway with 9 doors. construction of ada unisex restroom, drinking fountain, public telephone. replacement of lighting in hallway. maher n/a. | $100,000 |
| Jun 26, 2014 | Completed final sign-off Jan 2015 | 2300 Green St | D C S Construction Services Inc | remove & replace (e) kitchen cabinets in-kind, no change in teachers lounge kitchen, uprade electrical & plumbing, no structural. compliance with ordinance no 155-13 not reuqired.Details
remove & replace (e) kitchen cabinets in-kind, no change in teachers lounge kitchen, uprade electrical & plumbing, no structural. compliance with ordinance no 155-13 not reuqired. | $10,000 |
| Jun 11, 2014 | Completed final sign-off Apr 2015 | 2350 Green St | D C S Construction Services Inc | demolition of non-bearing interior walls, demolition of plumbing fixtures, replacement of clay block bearing wall (interior); compliance with maher ord 155-13 not requiredDetails
demolition of non-bearing interior walls, demolition of plumbing fixtures, replacement of clay block bearing wall (interior); compliance with maher ord 155-13 not required | $20,000 |
| Mar 22, 2013 | Completed final sign-off Oct 2013 | 2350 Green St | International Fire Equip | install ul 300 fire system.Details
install ul 300 fire system. | $3,900 |
| Nov 28, 2012 | Never finaled issued Apr 2013, no final | 2350 Green St | Simplexgrinnell Lp. | (n) fire alarm system: 1 facp, 1 booster panel, 1 annunciator, 16 pulls, 118 smokes, 1 heat, 7 monitor modules, 19 strobes, 55 horn/strobe.Details
(n) fire alarm system: 1 facp, 1 booster panel, 1 annunciator, 16 pulls, 118 smokes, 1 heat, 7 monitor modules, 19 strobes, 55 horn/strobe. | $78,000 |
| Jun 8, 2011 | Expired or cancelled cancelled Sep 2023 | 2350 Green St | Simplex Grinnell | emergency panel replacement consisting of replacing existing facp with new facp and replace all existing field devices-Details
emergency panel replacement consisting of replacing existing facp with new facp and replace all existing field devices- | $10,000 |
| Mar 10, 2011 | Never finaled issued Mar 2011, no final | 2300 Green St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| Jun 26, 2008 | Never finaled issued Jun 2008, no final | 2300 Green St | street spaceDetails
street space | ||
| Apr 18, 2000 | Expired or cancelled expired Aug 2000 | 2350 Green St | replace damaged brick gate columnsDetails
replace damaged brick gate columns | $900 |