Patricia Alarcon
- License
- C27440
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Ratcliff Architects
- On San Francisco permits
- Jul 2020 to Sep 2025
5 permits since 2000 (architect on 5 permits): 2 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Build Group Inc. (2), Whiteside Construction Corp.
- Engineers
- Darcey Schumacher, Eddie Hui, Marco Scanu
- Subcontractors
- Bayardo Chamorro
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 5
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 29, 2025 | In progress issued Feb 2026 | 2810 Pierce St | Build Group Inc. | revision to pa#202312011757-s1. accessible toilet rm, grade beam elevations, concrete beam revisions & additional shoring support over (e) basement stairs, demolition scope around (e) gym basement stairs, garage & east stair lighting revisions, north court bioretention planter, sanitary sewer line-Details
revision to pa#202312011757-s1. accessible toilet rm, grade beam elevations, concrete beam revisions & additional shoring support over (e) basement stairs, demolition scope around (e) gym basement stairs, garage & east stair lighting revisions, north court bioretention planter, sanitary sewer line- | |
| Dec 1, 2023 | In progress issued Jun 2024 | 2350 Green St | Build Group Inc. | new structure is proposed to be an open private parking garage which locates on the merged lot 7 & lot 13 w/ a play yard above as an occupied roof.play yard is intended to accomodate students use during recess.property line adjustment app has been submitted.Details
new structure is proposed to be an open private parking garage which locates on the merged lot 7 & lot 13 w/ a play yard above as an occupied roof.play yard is intended to accomodate students use during recess.property line adjustment app has been submitted. | $3,000,000 |
| Jun 6, 2023 | Completed final sign-off Aug 2024 | 2350 Green St | re-roofing the lower school, middle school & gym buildings.Details
re-roofing the lower school, middle school & gym buildings. | $140,000 | |
| May 21, 2021 | Completed final sign-off Dec 2021 | 2350 Green St | Whiteside Construction Corp. | voluntary seismic improvements to address the soft storyDetails
voluntary seismic improvements to address the soft story | $25,000 |
| Jul 6, 2020 | Never finaled filed Jul 2020, never issued | 2350 Green St | renovation to address seismic issues in schools tier 1 analysis of bldgs, improve ada access to the lower & middle schools, create a single point of entry and connect the lower school to the middle school through vertical & horizontal circulation, relocate reception to front of school for security &Details
renovation to address seismic issues in schools tier 1 analysis of bldgs, improve ada access to the lower & middle schools, create a single point of entry and connect the lower school to the middle school through vertical & horizontal circulation, relocate reception to front of school for security & | $10,000,000 |