Russell Berkowitz
- Listed as
- engineer
- On San Francisco permits
- Jul 2024 to Feb 2025
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 18, 2025 | In progress issued Mar 2025 | 2350 Green St | Build Group Inc. | revision to 202312011757 s1. foundation along grid p.a. have been updated to reflect a reduction in vertical gravity load. as divided by the owner, a portion of the structute north of grid p.a. has been entirely eliminated resulting in reduced laod. this change does not impact structural design,Details
revision to 202312011757 s1. foundation along grid p.a. have been updated to reflect a reduction in vertical gravity load. as divided by the owner, a portion of the structute north of grid p.a. has been entirely eliminated resulting in reduced laod. this change does not impact structural design, | |
| Jul 31, 2024 | Completed final sign-off Sep 2025 | 1155 Battery St | Skyline Construction | 1/f: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, finishes, and casework.Details
1/f: interior tenant improvement includes new non-load bearing partitions, ceiling, lighting, finishes, and casework. | $8,000,000 |